DoKaSch Opticooler Instruction manual

TEMPERATURE. THAT ARRIVES.
Opticooler©
Quick User Guide

Version
Version
Issue Date
Revision
1.10
20.June. 2018
All Pages
1.20
20.September. 2018
Pages: 14; 15; 16 & 17
1.30
05.October.2020
Document
audited
DoKaSch TEMPERATURE SOLUTIONS GmbH
Mönchhofallee 7 | 65451 Kelsterbach | Germany
Phone: +49 6142 836 938-0 | Telefax: +49 6142 836 938-99
info@dokasch-ts.com | www.dokasch-ts.com
2
Issued
by
Released by
Verena Blum
Johannes Fehl

Agenda
3
Chapter Slides
Start Operation / Operation 5-9
Alerts 10-11
End Operation 12
External Power / Battery Charging 13-15
Important –Preparation of Active Shipments 16
Important - During Active Shipments 17
Contacts 18
RAP Details 19-24
RKN Details 25-28
Control Panel RAP / RKN 29

How To Operate The Opticooler
This “Quick User Guide” does not replace the Operations Manual.
Please, do also read and follow the Operations Manual. Leading is
always the Operations Manual in it’s latest edition.
Download at www.dokasch-ts.com/manual
4

Start Operation
✓No physical damages
✓Both charging cables are available and plugged in
✓Cargo compartment is clean
✓Door(s) can be closed properly
Step 1: Quick visibility check
5

Start Operation
Step 2: Switch on the container
The container is switched off when delivered.
✓Press green button
✓Green light indicates that the container is
running
✓Control-unit boots now (approx. 60 sec.)
✓„Start screen“ appears and the container is
ready for operation, without active
temperature program
Do not switch off the container as long as the
„start screen“ is not being fully displayed.
6

Start Operation
Step 3: Select the temperature at the start screen
P1 Set 5°C → 2° - 8°C
P2 Set 20°C → 15° -25°C
P3 Set variable → individual temperature
between +2°and +30°C with a
range of +/- 3°C
Press the relevant button to select
temperature range.
7

Start Operation
Step 4: Confirm temperature program
✓Confirm by pressing YES
within 10 sec.
✓Screen changes into
program mode
✓Container starts cooling
down or heating up
immediately
✓If you press NO or wait
more than 10 sec. ;
Container does not start
any program and returns
to the „start screen“
8

Unit Is Running And Cooling
Pre-conditioning
✓„ON / PROGRAMMED“ must be
displayed on the screen now
✓Check selected temperature
program
✓Container regulates temperature
to selected temperature range
✓Temperature must remain
constant at the selected set-point
for 1 hour before loading the
goods
9
Goods must be pre-conditioned exactly. Goods temperature deviation shall not deviate more
than plus/minus 0,5°C from the set temperature. Larger deviations reduce the running time of
the battery significantly. The container is not designed to cool down or heat up cargo on
battery.

Alert Before / While loading
Alert priorities:
1. Temperature deviation
2. Door open
3. Low battery (below 20%)
✓Yellow light starts flashing and
alarm is displayed
✓1. Press „Quit Alarm“ to stop the
flash light
✓2. If the cause has been solved
(doors are closed, temperature
within the range), quit the alert.
✓Ensure, that all alerts have been
quitted, before sealing the
display cover
✓Seal the display cover
10

Alert While Running
If an alert appears, while cargo is loaded
and a temperature program is running,
identify the alert and take action.
1. Low battery: Plug in the container
immediately and ensure if the
container is charging
2. Open door: check doors and ensure
they are closed properly
3. Temp. Deviation: Move the container
into an environment which is close to
set temperature and inform your
supervisor.
✓Do not break cover seal
✓Do not quit the alert without
permission by your supervisor
11

End Active Temperature Program
✓End program after cargo has
been removed from the container
and the container is empty
✓Push button „END PROGRAM“
and confirm next screen with YES
✓Close the doors and recharge the
container up to 100% and switch
it off afterwards
Plug in the container at
mains power to avoid
damages of the batteries
and switch it off afterwards!
12

External Power / Battery Charging
13
✓Container is equipped with two charging
units and two plug sockets
✓It is possible to use just one cable or both
in parallel (DoKaSch recommends to use
both)
✓Plug in one end at the container and the
other end at the mains power of the
warehouse
✓110 –220 V
✓The battery charges the fastest using
two cables at an outside temperature
between +15 °C (+59°F) and +20 °C
(+68°F). Higher or lower ambient
temperature lead to longer charging
times.
13

External Power / Battery Charging
14
✓The container is equipped with four
adapters (2ea per type)
✓Cables are five meters long (black / red)
and local extensions can be used
✓Fixed cables: Type-F: Europe (except the
UK and Ireland)
14
Adapters:
Type-B: USA, Canada, Mexico,
Japan
Type-G: UK, Ireland, Malta,
Malysia, Singapore
Type-J: Switzerland, United Arabian
Emirates
Type-I: China, Australia, New Zealand,
Argentina

External Power / Battery Charging
✓Do not use damaged cables
✓Plug in both charging cables
✓Ensure that the notification „charging“ and
the flash symbol are displayed.
✓Monitor the charging status. If battery
capacity does not increase, unplug cables
for safety reasons and inform your
supervisor.
✓Before charging the container, always
check the power cables and their sockets
(both ends of the cable) at the container
for visible damages
(e.g. damaged isolation, ripped out
sockets)
15

16
Important –Preparation Of Active Shipments
Cargo must be loaded on pallets in a way that a free airflow is ensured:
Throughout pallet itself in all directions
Between the spacers at all sides
At the air inlets and the air outlets
If the cargo on the pallet is shrink-wrapped, keep the pallets itself
totally clear from any foil or carton
Avoid cold traps when packing the cargo
„IATA Dangerous Good Regulations“ must be met strictly
Fix the cargo with airline approved straps at the tie-down
Observe the max. weight
Avoid lose foil, cartons, etc. that can block the ventilators

Important –During Active Shipments
17
Do NOT open doors
Do NOT end or change temperature program
Do NOT switch off the container, while goods are loaded
Reduce exposure to direct sunrays to the greatest possible
extend
Move the container to an environment which is close to the set
temperature
To secure a high charging level, plug in the container with two
cables whenever possible
Handle the container with care to avoid physically damages
and do NOT harm the isolation

Contacts
24/7 Hotline for urgent operational issues:
Phone: +49 6142 836 938-11
E-Mail: help@dokasch-ts.com
Availability checks, rental requests and bookings shall be addressed
to Dokasch-TS at normal business hours (Mo.-Fr. 09:00 –17:00 LT-FRA):
E-Mail: reque[email protected]
Phone: +49 6142 836 938-12
Fax: +49 6142 836 938-99
Address: Dokasch TEMPERATURE SOLUTIONS,
Mönchhofallee 7
65451 Kelsterbach
Germany
18

RAP And RKN Payload Securing
Payload could be tied down
by straps at six points on all
four sides.
19
Payload securing

20
RAP Details
Table of contents
Popular Cooling Box manuals by other brands

Mobicool
Mobicool MT08 Operating and safety instructions

PHOENIX MANUFACTURING
PHOENIX MANUFACTURING MASTER BLASTER MB10 owner's manual

Nibe
Nibe ACS 310 Installer manual

Clatronic
Clatronic KB 3713 N instruction manual

EvaKool
EvaKool DOWN UNDER Series instruction manual

Dometic
Dometic WAECO BordBar TB08 operating manual