manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Park Central
  6. •
  7. Play Set & Playground Equipment
  8. •
  9. Park Central Arch Instruction sheet

Park Central Arch Instruction sheet

SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 1 of 20
SWING FRAMES
Arch (3-1/2” and 5”), Tire, Bi-Pod, Tri-Pod (8’ and 10’ Height), Single 5” Post
PRE-INSTALLATION CHECK:
Compare all items received to the packing list. Notify your local sales representative immediately if any
parts are missing or damaged.
We are not responsible for items discovered missing or damaged
after 72 hours from time of delivery!
Before beginning installation, make sure that you have read and understand the Installation Introduction
manual that was supplied to you. If you did not receive a copy, or if you have a question regarding anything
covered in this manual, contact your local sales representative.
USER GROUP: 2 - 12
RECOMMENDED CREW: At least 2 people
TOOLS REQUIRED:
1/4” allen head tool
Level
Tape measure
Auger / Post hole digger / Shovel
High speed 3/8” electric drill w/clutch
NOTE: Use of any other driver may result in damage to tool and/or hardware!
INSTALLATION TIME: Varies
CONCRETE REQUIRED: 3.53 cubic feet per hole (arch frames)
5.29 cubic feet per hole (single post frames)
7 cubic feet per hole (bi-pod and tri-pod frames)
NOTE: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturer’s recommendations.
NOTE: Swing chains and seats are sold separately.
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 2 of 20
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame.
STEP 2
Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the
bottom of each hole.
STEP 4
Verify that swing frame is level and plumb in footings and that it is at correct height. Center of top bar
needs to be 96” above nished surfacing. Pour concrete in footings to correct level. NOTE: Concrete
must have a minimum rating of 2,500 psi and must be mixed per manufacturer’s recommendations. Fill
remainder of hole with dirt. Allow concrete to harden for at least 48 hours before use!
STEP 5
Install appropriate age level sticker on swing frame. Full bucket seats require a 2-5 label - all other
seats require a 5-12 label. For safety reasons, do not attach swing chains or seats to swing frame until
playground is ready to open. NOTE: Swing seats and chains sold separately.
Detail A
STEP 3
Select two arched swing frame ends, top bar(s), two 1/2”x3/4” set screws per connection and swing frame
middle section(s) if applicable. Set swing frame pieces into place in footing holes and brace into position.
Select one top bar and four set screws. Slide top bar over stub of swing frame end and hold in place with
pre-drilled holes and nuts facing down. Secure using two set screws (see Detail A). Repeat for other side
of top bar and swing frame middle or end. Repeat for other top bars and frame pieces if applicable.
Arch
Swing Frame
Middle
Swing
Top Bar
Set Screw
1/2”x3/4”
Arch Swing
Frame End
Set Screw
1/2”x3/4”
Set Screw
1/2”x3/4”
ARCH SWING FRAME / TIRE SWING FRAME
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 3 of 20
STEP 6 - for TIRE SWING FRAMES ONLY
Select SH-51 tire swivel assembly. Center SH-51 on swing top bar. NOTE: Center of SH-51 will be
92-5/8” from center of vertical post. Attach SH-51 to top bar of swing frame by inserting bolts down
through swivel halves. Secure bottom using provided nuts (see Detail B). Repeat for other SH-51.
SH-51
Detail B
FOOTING ELEVATION - ARCH SWING FRAME OR TIRE SWING FRAME
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 4 of 20
FOOTING LAYOUT - 3.5” ARCH FRAME - ONE BAY
FOOTING LAYOUT - 3.5” ARCH FRAME - TWO BAY
FOOTING LAYOUT - 3.5” ARCH FRAME - THREE BAY
FOOTING LAYOUT - 3.5” ARCH FRAME - FOUR BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 5 of 20
FOOTING LAYOUT - 5” ARCH FRAME - ONE BAY
FOOTING LAYOUT - 5” ARCH FRAME - TWO BAY
FOOTING LAYOUT - 5” ARCH FRAME - THREE BAY
FOOTING LAYOUT - 5” ARCH FRAME - FOUR BAY
48”
48”
48”
48”
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 6 of 20
FOOTING LAYOUT - 5” TIRE FRAME - ONE BAY
FOOTING LAYOUT - 5” TIRE FRAME - TWO BAY
FOOTING LAYOUT - 5” TIRE FRAME - THREE BAY
FOOTING LAYOUT - 5” TIRE FRAME - FOUR BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 7 of 20
BI-POD and TRI-POD SWING FRAME
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame.
Detail A
End Yoke for Bi-Pod
Top Rail
STEP 2
Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in
the bottom of each hole.
STEP 3
Select top rail(s) of swing frame (2-3/8”x132”), two end yokes and center yoke(s) if applicable. Insert top
rail(s) fully into longest leg of each swing yoke, then install and tighten set screws (see Detail A and B).
STEP 4
Select top rail assembly and swing legs. NOTE: The standard swing legs (2-3/8”x144”) are used for
bi-pod swing frames and side legs of the 8’ tri-pod frame. The 2-3/8”x168” swing legs are used for the 10’
tri-pod swing. The swing legs with bend are used for the ends of the tripod (2-3/8”x136” with bend for the
8’ tri-pod and 2-3/8”x168” with bend for the 10’ tri-pod). NOTE: Bent end inserts into swing yoke. With
top rail assembly laying on ground, insert swing legs fully into legs of swing yokes. Install and tighten set
screws (see Detail A).
Swing End Yoke (long leg)
Top Rail
Swing Middle Yoke (long leg)
1/2”x3/4” Set Screw
(two in each junction)
Detail B
Middle Yoke for
Bi-Pod and Tri-Pod
Detail A
End Yoke for Tri-Pod
Top Bar
1/2”x3/4” Set Screw
(two in each junction)
Swing End Yoke
(long leg)
Swing Leg
144” for 8’ tri-pod
168” for 10’ tri-pod
End Swing Leg with Bent End
(bent end inserts into swing end yoke leg)
136” for 8’ tri-pod
168” for 10’ tri-pod
1/2”x3/4” Set Screw
(two in each junction)
Swing Leg
(144” Long)
Swing Leg
144” for 8’ tri-pod
168” for 10’ tri-pod
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 8 of 20
STEP 5
For each bay, select four swing hanger assemblies (PL-SH-23’s). Attach PL-SH-23’s to top rail so that
centers of each swing hanger for each swing are at least 20” apart (see Detail B). NOTE: All other side
to side measurements will need to be set and veried after swing seats are installed (swing seats and
chains are sold separately).
Detail B
Top Rail
STEP 6
Using adequate manpower, turn swing frame upright and set into place in footings. Center of top bar
needs to be 96” above nished surfacing (120” if a 10’ tri-pod frame is installed). Pour concrete in footings
to correct level. Fill remainder of hole with dirt NOTE: Concrete must have a minimum rating of 2,500 psi
and must be mixed per manufacturer’s recommendations. Fill remainder of hole with dirt. Allow concrete
to harden for at least 48 hours before use!
STEP 7
Install appropriate age level sticker on swing frame. Full bucket seats require a 2-5 label - all other
seats require a 5-12 label. For safety reasons, do not attach swing chains or seats to swing frame until
playground is ready to open. NOTE: Swing seats and chains sold separately.
BI-POD and TRI-POD SWING FRAME (continued)
PL-SH-23
BI-POD and TRI-POD SWING FRAME ADD-A-BAY
STEP 1
Remove appropriate end yoke and end poles. Replace with middle yoke.
STEP 2
Excavate footing for additional suport posts and set in place. After frame has been assembled and all
parts are tted together properly with top rails level and all posts fully inserted into swing yokes, tighten
all hardware.
STEP 3
Pour concrete in footings to correct level. Fill remainder of hole with dirt NOTE: Concrete must have a
minimum rating of 2,500 psi and must be mixed per manufacturer’s recommendations. Fill remainder of
holes with dirt. Allow concrete to harden for at least 48 hours before use!
STEP 4
Install appropriate age level sticker on swing frame. Full bucket seats require a 2-5 label - all other
seats require a 5-12 label. For safety reasons, do not attach swing chains or seats to swing frame until
playground is ready to open. NOTE: Swing seats and chains sold separately.
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 9 of 20
BI-POD FOOTING - ONE BAY
BI-POD FOOTING - TWO BAY
BI-POD FOOTING - THREE BAY
BI-POD FOOTING - FOUR BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 10 of 20
8’ TRI-POD FOOTING ELEVATION - END 8’ TRI-POD FOOTING ELEVATION - SIDE
8’ TRI-POD FOOTING - ONE BAY
8’ TRI-POD
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 11 of 20
8’ TRI-POD FOOTING - TWO BAY
8’ TRI-POD FOOTING - THREE BAY
8’ TRI-POD FOOTING - FOUR BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 12 of 20
10’ TRI-POD FOOTING ELEVATION - END 10’ TRI-POD FOOTING ELEVATION - SIDE
10’ TRI-POD FOOTING - ONE BAY
10’ TRI-POD
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 13 of 20
10’ TRI-POD FOOTING - TWO BAY
10’ TRI-POD FOOTING - THREE BAY
10’ TRI-POD FOOTING - FOUR BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 14 of 20
SINGLE 5” POST SWING FRAME
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame.
Detail A
STEP 2
Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the
bottom of each hole.
STEP 3
Select two vertical posts with caps (5”x144”), two 5”x5” receivers, two 5” saddles, eight 3/8”x1-3/4” security
TORX bolts and eight 3/8”x1/2” rectangular weld nuts. With posts laying on ground, attach one receiver
and one saddle to top of each post (even with edge of cap) using four bolts and four nuts (see Detail A).
NOTE: Bolts will be inserted through saddle (weld nuts through receiver). Make sure both sides of saddle/
receiver are evenly spaced. No more than 2 threads may be showing. Tighten hardware.
Vertical Post
3/8” Rectangular Weld Nut
3/8”x1-3/4”
Security TORX Bolt
1/4”x1” Drive Pin
(installed step 7)
5” Saddle
5” Receiver
Set Screw
1/2”x3/4”
(installed step 5)
STEP 4
If swing frame is a multi-bay, select post(s) with cap (5”x144”), 5”x5” receivers (two per post), 3/8”x2”
security TORX bolts and 3/8”x1/2” rectangular weld nuts (four of each per middle post). Attach receivers
to top of post (even with edge of cap) using bolts and nuts (see Detail B). Make sure both sides of saddle/
receiver are evenly spaced. No more than 2 threads may be showing. Tighten hardware. These will be
the middle swing posts.
Detail B
Vertical Post
3/8”x2” Security
TORX Bolt
3/8” Rectangular Weld Nut
1/4”x1” Drive Pin
(Installed in step 6)
5” Receiver
1/4”x1” Drive Pin
(Installed in step 6)
5” Receiver
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 15 of 20
STEP 9
Install appropriate age level sticker on swing frame. Full bucket seats require a 2-5 label - all other
seats require a 5-12 label. For safety reasons, do not attach swing chains or seats to swing frame until
playground is ready to open. NOTE: Swing seats and chains sold separately.
STEP 7
Using adequate manpower, turn swing frame upright and set into place in footings. Block and brace to
correct height and make sure swing frame is level and plumb. NOTE: Center of top rail needs to be 96”
above nished surfacing.
Detail C
STEP 5
Select top rail(s) of swing frame and vertical posts. Insert top rails fully into 5”x5” receivers with swing
hanger tabs at 6:00. Install and tighten set screws (see Detail C).
Top Rail
Top Rail
1/2”x3/4”
Set Screw
1/4”x1” Drive Pin
(top of one receiver,
bottom of other)
1/4”x1”
Drive Pin
(top of one receiver,
bottom of other)
1/4”x1” Drive Pin
Top Rail
STEP 6
Select 1/4”x1” drive pins (one per saddle and two per receiver). Drill one 1/4” hole in each post through
back of each saddle and two 1/4” diagonal holes through opposite sides of each receiver in the at area
by attachment hardware (see Detail B and Detail C). NOTE: Drill hole at top on one side of receiver and
at bottom on other side. Place drive pins in holes and tap into place.
STEP 8
Pour concrete into footings to correct level. NOTE: Concrete must have a minimum rating of 2,500 psi
and must be mixed per manufacturer’s recommendations. Fill remainder of hole with dirt. Allow concrete
to harden for at least 48 hours before use.
SINGLE 5” POST SWING FRAME - continued
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 16 of 20
FOOTING ELEVATION - SINGLE 5” POST SWING FRAME
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 17 of 20
SINGLE 5” POST FRAME - ONE BAY
SINGLE 5” POST FRAME - TWO BAY
SINGLE 5” POST FRAME - THREE BAY
SINGLE 5” POST FRAME - FOUR BAY
138”
18”X36”
DEEP
138”
18”X36”
DEEP
138”
138”
18”X36”
DEEP
138”138”
138”
18”X36”
DEEP
138”138” 138”
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 18 of 20
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate position of add-a-bay swing frame.
STEP 2
Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the
bottom of hole.
STEP 3
Remove existing saddle from the vertical post where the add-a-bay will attach. Replace it with one of the
receivers from the new add-a-bay kit. Attach new receiver to existing receiver using four 3/8”x2” security
TORX head bolts and four 3/8”x1/2” rectangular weld nuts (see Detail A) to make a new swing middle.
Make sure both sides of saddle/receiver are evenly spaced. No more than 2 threads may be showing.
Tighten hardware. NOTE: Drive pins will be installed in Step 6.
Vertical Post
3/8”x2” Security
TORX Bolt
3/8” Rectangular Weld Nut
1/4”x1” Drive Pin
(Installed in Step 6)
New 5” Receiver
1/4”x1” Drive Pin
(Installed in Step 6)
Existing 5” Receiver
Detail A
STEP 4
Select vertical post, one 5”x5” receiver, one 5” saddle (removed from existing end post), four 3/8”x1-3/4”
security TORX bolts and four 3/8”x1/2” rectangular weld nuts. With post laying on ground, attach receiver
and saddle to top of each post (even with edge of cap) using four bolts and four nuts each (see Detail B).
NOTE: Bolts will be inserted through saddle (weld nuts through receiver). Make sure both sides of saddle/
receiver are evenly spaced. No more than 2 threads may be showing. Tighten hardware. Set screws will
be installed in Step 5.
Vertical Post
3/8” Rectangular Weld Nut
3/8”x1-3/4” Security
TORX Head Bolt
1/4”x1” Drive Pin
(Installed in Step 6)
5” Saddle (from existing end post)
New 5” Receiver
1/2”x3/4” Set Screw
(Installed in Step 5)
Detail B
SINGLE 5” POST SWING FRAME - ADD-A-BAY
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 19 of 20
STEP 8
Install appropriate age level sticker on swing frame. Full bucket seats require a 2-5 label - all other
seats require a 5-12 label. For safety reasons, do not attach swing chains or seats to swing frame until
playground is ready to open. NOTE: Swing seats and chains sold separately.
Detail C
STEP 5
Set post in footing. Select top rail for swing frame. Insert top rail fully into 5”x5” receivers with swing hanger
tabs at 6:00. Install and tighten set screws (see Detail C).
Top Rail
Top Rail
1/2”x3/4”
Set Screw
1/4”x1” Drive Pin
1/4”x1”
Drive Pin
STEP 6
Select ve 1/4”x1” drive pins. Drill one 1/4” hole in each post through back of saddle and two 1/4” diagonal
holes through opposite sides of each receiver in the at area by attachment hardware (see Details A, B
and C). NOTE: Drill hole at top on one side of receiver and at bottom on other side. Place drive pins in
holes and tap into place.
STEP 7
Verify that top bar is at same height as existing swing and that it is level and vertical post is plumb. Pour
concrete into footing to correct level. NOTE: Concrete must have a minimum rating of 2,500 psi and
must be mixed per manufacturer’s recommendations. Fill remainder of hole with dirt. Allow concrete to
harden for at least 48 hours before use.
1/4”x1-1/2”
Drive Pin
Set Screw
Existing Top Rail
SINGLE 5” POST SWING FRAME - ADD-A-BAY - continued
SWING FRAMES
DATE: 08/29/2014
INSTALLATION GUIDELINES
Page 20 of 20
SWING DETAIL
Measure up 60” from top of nished surfacing. Run string line from end to end of swing frame at this
height.
The horizontal distance between adjacent to-fro swings at rest shall be no less than 24” when measured
at 60” above the protective surfacing.
The horizontal distance between the supporting structure and the adjacent to-fro swing seat shall be no
less than 30” when measured at 60” above the protective surfacing.
Also, once seats are installed, they must be at least 12” above the nished surfacing.
NOTE: All of these measurements need to be taken when swings are occupied my maximum
users.

This manual suits for next models

4

Popular Play Set & Playground Equipment manuals by other brands

Global TSUNAMI Assembly Installation Guide

Global

Global TSUNAMI Assembly Installation Guide

LifeSpan Kids Tee Off Inflatable Mini Golf Play Centre user manual

LifeSpan Kids

LifeSpan Kids Tee Off Inflatable Mini Golf Play Centre user manual

Weka 816.1001.00.00 ASSEMBLY, USER AND MAINTENANCE INSTRUCTIONS

Weka

Weka 816.1001.00.00 ASSEMBLY, USER AND MAINTENANCE INSTRUCTIONS

Playcraft SUNRISE CLIMBER R5 installation instructions

Playcraft

Playcraft SUNRISE CLIMBER R5 installation instructions

Infantino Prop-a-Pillar Tummy Time & Seated Support Owners manual instructions

Infantino

Infantino Prop-a-Pillar Tummy Time & Seated Support Owners manual instructions

BOERPLAY Springer Seal installation instructions

BOERPLAY

BOERPLAY Springer Seal installation instructions

Cedar Summit KINGSBRIDGE F25050EI Installation and operating instructions

Cedar Summit

Cedar Summit KINGSBRIDGE F25050EI Installation and operating instructions

Europlay U300 Assembling manual

Europlay

Europlay U300 Assembling manual

BOERPLAY UKPE046.01R instructions

BOERPLAY

BOERPLAY UKPE046.01R instructions

S.R.Smith ROGUE GRAND RAPIDS Assembly and installation instructions

S.R.Smith

S.R.Smith ROGUE GRAND RAPIDS Assembly and installation instructions

KBT spring toy in HDPE safari 172.011 Instructions for use

KBT

KBT spring toy in HDPE safari 172.011 Instructions for use

Quadro mdb C0073 Construction manual

Quadro mdb

Quadro mdb C0073 Construction manual

TP Toys active fun Spiro Spin TP750 Instructions for assembly, maintenance and safe use

TP Toys

TP Toys active fun Spiro Spin TP750 Instructions for assembly, maintenance and safe use

TP Toys TP348 Instructions for assembly, maintenance and safe use

TP Toys

TP Toys TP348 Instructions for assembly, maintenance and safe use

Trigano Jardin EVO-DINGO instruction manual

Trigano Jardin

Trigano Jardin EVO-DINGO instruction manual

growplay MB1 Monkey Bridge Assembly instructions

growplay

growplay MB1 Monkey Bridge Assembly instructions

LifeSpan Kids CAMIRA CUBBY HOUSE owner's manual

LifeSpan Kids

LifeSpan Kids CAMIRA CUBBY HOUSE owner's manual

Europlay S306 Assembling manual

Europlay

Europlay S306 Assembling manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.