APPLICATION:
The GroundTrac® system is designed with a minimum amount of installed footings at greatly reduced
labor. The system integrates with readily available 1-1/2” schedule #40 galvanized water pipe. This
ground mount solution includes virtually everything needed to install modules with vertical posts up
to 5’ from rear footing, 30” from front footing. The installer will only need pipe, concrete and basic
construction skills to complete the installation. This fully engineered system utilizes Professional Solar
Products’ patented Slide-n-Clamp™ module clamps and support rail.
WARNING:
All ProSolar® products are engineered and tested to withstand
stated specifications (as stated on published engineering
documents) when installed properly. Failure to install properly
may decrease the performance of installation.
SAFETY:
All regional safety requirements should be followed when
installing ProSolar® products. All tools and equipment located
on the roof should be secured to avoid falling object hazards. All
equipment/tools should be properly maintained and inspected
prior to use. Any exposed studs should be protectively capped
to avoid injury. This racking system may be used to ground and/
or mount a PV module complying with UL 1703 only when the
specific module frame has been evaluated for grounding and/
or mounting compliance with the included instructions. This
installation manual is intended for use by professional installers
with a working knowledge of construction principles.
• Post hole digger or powered auger
• ProSolar® grade stake kit
• Cordless drill
• 1/2” wood drill bit
• 1/2” & 9/16” deep socket & ratchet (or impact
gun)
• Sledge hammer (small-approx. 14”)
• 3-1/2” (min) C-clamps
• String line and line level OR builders/laser level
• Pipe wrenches (two required)
• Tape Measure
• 3/16” long-arm hex wrench
• Torque wrench with 3/16” hex bit socket
• Cordless reciprocating saw/ band saw
• Wheelbarrow or concrete pump
• 1/2” Irwin® #10 UniBit™
• Framing square
• Sharpie ™ marker
Explanation or Install Tip
Critical for Safety
Important Product
Performance Information
Symbol Legend
Tool List

GroundTrac®
Installation Manual
Page 2 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Dig footings.
Lateral footing spans listed on page 6.
Front to rear footing spans listed in angle
charts on page 6.
See engineering for general footing
specifications.
(Footing depths may vary depending
on site specific conditions such as
sloped hillsides. Review site specific
requirements with local building
department as necessary.)
Dig footings
To speed up installation it is recommended to use a
12” power auger to dig your footings.
Build grade stake forms
Assemble re-usable ProSolar grade
stakes). Recommend 2”x4” vertical
support. Drill 2” x 4” with 1/2” drill bit
using grade stake as hole template.
Assemble bolt, washer, spacer block
and grade stake and tighten using
9/16” socket. Attach 1”x 4” wooden
horizontal support using 3-1/2” (min.)
C-clamps.
Grade stake kit incudes: 24” threaded
metal stakes, aluminum spacer blocks,
bolts, and washers.
See Below
Distance depends
on tilt angle
(see angle chart)

GroundTrac®
Installation Manual
Page 3 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Insert grade stakes and lay horizontal pipe support
Drive grade stakes with sledgehammer beside
each footing and level 1” x 4” supports using string
line/line level or laser level.
Place horizontal 1-1/2” schedule 40 galvanized
pipe with slip-on Hollaender® Tees along 1” x 4”
supports. Adjust C-clamps as necessary to level
pipe. Use pipe wrenches to couple pipe lengths as
necessary.
24” max. pipe overhang from end vertical support
Measure pipe heights and cut
Measure vertical pipe lengths with measuring tape from
bottom of footing to horizontal pipe. Deduct 2” from length
to avoid pipe contact with bottom of footing moisture. Note
measured lengths.
Cut pipe lengths using a chop saw, reciprocating saw, or
portable band saw
Use only 1-1/2” Schedule #40 Galvanized water pipe
(not fence tube) for your supports.
Standard 21’ length water pipe with pre-attached
couplers readily available at plumbing supply houses.

GroundTrac®
Installation Manual
Page 4 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Insert vertical support pipes and center
Insert vertical pipes into tees and fasten lower tee set
screw with long-arm hex key.
Center vertical pipes in footings by sliding left or right.
Mark & drill rails (see online GroundTrac Drill Guide video
for tips and visual representation.)
1-1/2” Schedule 40 pipe max end overhang of 2 feet.
Attach initial support rails with Drop-N-Lock U-bolt assembly
Rest rail on top of horizontal pipes and insert
U-bolt. Place Drop-N-Lock support rail insert
into the rail and align with U-bolt. Hand tighten
nuts.
U-bolt nuts should be evenly
tightened to avoid u-bolt
misalignment.
Drill rail locking holes with
Irwin® 10 (1/2”) Unitbit®™

GroundTrac®
Installation Manual
Page 5 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Bonding and Grounding (Patent Pending)
For bonding module frame and clamps to support rail
• Fasten pre-assembled mid-clamp assembly to module
frame, to 15 ft-lbs.
Grounding of module to RoofTrac®rail via ProSolar®rail
channel nut using bus bar.
Bonding of RoofTrac®rail to RoofTrac®rail via ProSolar®
UL467 tested universal splice kit (splice insert and splice
support).
Grounding of RoofTrac®rail or module via Ilsco SGB-4 lug.
System to be grounded per National Electrical Code
(NEC), ANSI/NFPA 70. Grounding conductor shall be solid
copper wire, 8 AWG minimum. See NEC and/or Authority
Having Jurisdiction (AHJ) for site-specific grounding
requirements prior to installation. See final run (racking
to ground electrode) grounding equipment installation
instructions for specific installation information.
Assembled
Self-bonding
Mid Clamp With
SS Bus Bar
Self-bonding Mid
Clamp Fastened on Rail
(Solar Module not shown)
Side view of
Grounding
Grounding Wire Installation
FOR GROUNDING CONNECTION
• ILSCO SGB-4 rail ground connection
• Fasten both terminals to 35 in-lbs
• Ensure that copper wire does not touch aluminum;
Recommended ¼” clearance.
BASIC BONDING/GROUNDING CONNECTION DIAGRAM
UL 2703 approved
label applied
within 12” of end
of rail.
Outdoor rated, insulated wire, such as quick connect
cables, can be nested inside the RoofTrac®support rail
or held in place with approved cable clip such as Wiley
ACC-R2 ( for Microinverter trunk cable) and ACC-R4
(for PV wire) clips.
Uninsulated copper grounding wire must never be
placed inside the aluminum rail – it should be kept at a
distance of at least ¼” away from the aluminum rail.
Wiley Clip

GroundTrac®
Installation Manual
Page 6 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
BASIC BONDING/GROUNDING CONNECTION DIAGRAM
Grounding
Lug
Grounding
Lug
RoofTrac®Universal
Rail Bonding Splice
Grounding
Mid-clamp
Splice
Connection
Grounding
Lug
Minimum8 AWG
Copper Wire
(For Lug)
Grounding Lug or
Enphase Engage
integrated-grounding
trunk cable system
Grounding Lug or
Enphase Engage
integrated-grounding
trunk cable system
5/16” SS serrated flange bolt into
channel nut (no bus bar)
Microinverter and Optimizer (Self-Bonding Connector)
Modules/racking/microinverter
equipment grounding through
Enphase Engage trunk cabling
Enphase
module quick-
connect cabling
FOR GROUNDING USING ENPHASE ENAGAGE CABLE
• No copper wire or lug required. Equipment grounding conductor (EGC) built into Enphase engage quick-connect cabling.
• Minimum of 2 microinverters to same Enphase engage trunk cable within continuous module row
• Modules in module row must be installed and grounded per install guide requirements and must share the same two
rails. Microinverter/optimizer
bonding to channel nut/rail via
5/16” SS serrated flange bolt
5/16” SS serrated flange bolt
into channel nut (no bus bar)

GroundTrac®
Installation Manual
Page 7 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Attach support rails (spacers) every 10’
Install at least one rail approximately every 10’ for
proper pipe spacing.
If not using slotted rail, see page 7 for drilling rail
locking holes.
Pour concrete
Pour or pump mixed concrete into footings. Let
cure.
Extruded edges of the aluminum can
be sharp. Treat any sharp edges as
necessary to prevent injury.

GroundTrac®
Installation Manual
Page 8 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
Remove re-usable forms and install modules
Remove grade stakes. Tighten all tee set
screws, both upper and lower, to 17 ft-lbs with
torque wrench and hex bit socket. Adjust
initial rails to final location. Install remaining
rails.
Tighten all U-bolt nuts evenly with 1/2” socket
or impact gun.
Install solar modules with pre-assembled
ProSolar® clamping hardware.
Install ProSoalr® EZ rail end caps with
adhesive.
Install 1-1/2” plastic pipe end caps for
schedule #40 pipe as necessary.
Remove re-usable forms and install modules
Clamping hardware is
engineered exclusively for
Professional Solar Products
support rail.
Completed GroundTrac® Installation.

GroundTrac®
Installation Manual
Page 9 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
124” Deep (2-1/2”) Rail
3 Modules 10’ Lateral Span 84” On Center
136” Deep (2-1/2”) Rail
4 Modules 10’ Lateral Span 84” On Center
164” Extra-Deep (3”) Rail
4 Modules 8’ Lateral Span 108” On Center
30” Max
from top of
Footing
79”
84” Fixed
124” & 136”
Rail Angle Chart:
30°
25°
20°
15°
10°
5°
0°
84”
84”
83”
81”
76”
73”
108”
106”
104”
101”
108”
108” Fixed
164”
Rail Angle Chart:
20°
15°
10°
5°
0° 124” x 2-1/2” Rail:
Supports up to
(3) 39.5” Wide
Modules
84" On Center
136” x 2-1/2” Rail:
Supports up to
(4) 32.5” Wide
Modules
84" On Center
164” x 3” Rail:
Supports up to
(4) 39.5” Wide
Modules
108" On Center
39.5”
84"
32.5”
108"
39.5”
84"

GroundTrac®
Installation Manual
Page 10 of 10
COPYRIGHT PROSOLAR® 2018: All information contained in this manual is property of ProSolar® (PSP).
GroundTrac® and RoofTrac®, are registered trademarks for PSP and are covered under U.S. patents
D547262 and #6,360,491. (V 2.0)
ProSolar®
If not using pre-slotted rails, use the 1/2” diameter Irwin™ Uni-Bit® (#10) short nose drill bit to
drill U-bolt assembly rail locking holes.
124” & 136” Support Rail Lengths (see page 6 for span illustration)
Upper pipe to lower pipe span (distance between U-bolts): 84” on center
U-bolt locking holes 41” from center (see above illustration)
164” Support Rail Length (see page 6 for span illustration)
Upper pipe to lower pipe span (distance between U-bolts): 108” on center
U-bolt locking holes 53” from center (not shown)
Align several rails side by side, as shown.
Using a square and Sharpie™ marker, mark hole locations along integrated rail bottom drill
guide.
Drill marked locations with cordless drill and Uni-Bit® speed drill bit
The 1/2” *(#10) Irwin® Uni-Bit™ drill bit
decreases rail locking hole drill time to
3 seconds.
41”
1/2” “U-Bolt Holes”
Center 2”
41”
Drilling holes for rails
Table of contents
Other ProSolar Rack & Stand manuals
Popular Rack & Stand manuals by other brands

New Star
New Star Neomounts PLASMA-M1950E instruction manual

Delta
Delta AIREYE quick start guide

B-Tech
B-Tech Mountlogic BT8223 Installation guide & parts list

Alico
Alico Aladdin Temp-Rite SR50 Installation, operation & service manual

New Star
New Star NS-WMB200PBLACK quick start guide

Vintage view
Vintage view Vino Series installation instructions

d & b audiotechnik
d & b audiotechnik Z5458 Rigging manual

Omnimount
Omnimount OM1100594 instruction manual

Ocean star
Ocean star SR1231 instruction manual

New Star
New Star Neomounts FPMA-D550BLACK instruction manual

New Star
New Star FPMA-VESANON instruction manual

B-Tech
B-Tech Ventry BTV521 Installation guide & parts list