RUD VRBK-FIX Installation instructions

dlhonline.co.uk 0161 223 1990
1
VRBK-FIX
RUD Ketten
Rieger & Dietz GmbH u. Co. KG
73428 Aalen
Tel. +49 7361 504-1370
Fax +49 7361 504-1171
www.rud.com
RUD-Art.-Nr.: 7902520-EN / 10.017
Load ring weldable
suits 90°-corners
> VRBK-FIX <
Safety instructions
This safety instruction/declaration has to be kept on file
for the whole lifetime of the product.
Translation of the original safety instruction
EN
Load ring for 90°-corners
(weldable)
VRBK-FIX
EG-Konformitätserklärung
entsprechend der EG-Maschinenrichtlinie 2006/42/EG, Anhang II A und ihren Änderungen
Hersteller:
RUD Ketten
Rieger & Dietz GmbH u. Co. KG
Friedensinsel
73432 Aalen
Hiermit erklären wir, dass die nachfolgend bezeichnete Maschine aufgrund ihrer Konzipie-
rung und Bauart, sowie in der von uns in Verkehr gebrachten Ausführung, den grundle-
genden Sicherheits- und Gesundheitsanforderungen der EG-Maschinenrichtlinie
2006/42/EG sowie den unten aufgeführten harmonisierten und nationalen Normen sowie
technischen Spezifikationen entspricht.
Bei einer nicht mit uns abgestimmten Änderung der Maschine verliert diese Erklärung ihre
Gültigkeit.
Produktbezeichnung:
Ringbock
_____________________________________________
VRBS-fix / VRBK-fix / VRBS / VRBG / VRBK / VRBSS
_____________________________________________
Folgende harmonisierten Normen wurden angewandt:
DIN EN 1677-1 : 2009-03 DIN EN ISO 12100 : 2011-03
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
Folgende nationalen Normen und technische Spezifikationen wurden außerdem angewandt:
BGR 500, KAP2.8 : 2008-04
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
Für die Zusammenstellung der Konformitätsdokumentation bevollmächtigte Person:
Michael Betzler, RUD Ketten, 73432 Aalen
Aalen, den 26.09.2016
Dr.-Ing. Arne Kriegsmann,(Prokurist/QMB)
_____________________________________________
Name, Funktion und Unterschrift Verantwortlicher
EC-Declaration of conformity
According to the EC-Machinery Directive 2006/42/EC, annex II A and amendments
Manufacturer:
RUD Ketten
Rieger & Dietz GmbH u. Co. KG
Friedensinsel
73432 Aalen
We hereby declare that the equipment sold by us because of its design and construction,
as mentioned below, corresponds to the appropriate, basic requirements of safety and
health of the corresponding EC-Machinery Directive 2006/42/EC as well as to the below
mentioned harmonized and national norms as well as technical specifications.
In case of any modification of the equipment, not being agreed upon with us, this declara-
tion becomes invalid.
Product name:
Load ring
_____________________________________________
VRBS-fix / VRBK-fix / VRBS / VRBG / VRBK / VRBSS
_____________________________________________
The following harmonized norms were applied:
DIN EN 1677-1 : 2009-03 DIN EN ISO 12100 : 2011-03
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
The following national norms and technical specifications were applied:
BGR 500, KAP2.8 : 2008-04
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
_________________ _________________
Authorized person for the configuration of the declaration documents:
Michael Betzler, RUD Ketten, 73432 Aalen
Aalen, den 26.09.2016
Dr.-Ing. Arne Kriegsmann,(Prokurist/QMB)
_____________________________________________
Name, function and signature of the responsible person

2 VRBK-FIX
Before initial usage of the RUD-VRBK-FIX,
please read carefully the safety instruc-
tions. Make sure that you have understood
all subjected matters.
Non-observance can lead to serious per-
sonal injuries and material damage and
eliminates warranty.
1 Safety instructions
ATTENTION
Wrong positioned or damaged weld-on
lifting points as well as improper use can
lead to injuries of persons and damage at
property, when load falls down.
Please check all lifting points carefully
before every usage.
RUD-llifting points VRBK-FIX must only be used by
instructed and competent persons considering BGR
500 / DGUV 100-500, and outside Germany noticing
the country specific statutory regulations.
2 Intended use of the VRBK-FIX
RUD-Lifting points VRBS-FIX must only be used for
the assembly at the load or at lifting means.
They are designed and intented to attach lifting
means.
RUD Lifting points can also be used as lashing points
to attach lashing means.
RUD-lifting points must only be used in the hereby
specified case of operation.
3 Assembly- and instruction manual
3.1 General information
• Capability of temperature usage:
When used at higher temperatures the working
load limit (WLL) of the lifting point must be reduced
as follows:
- -20°C up to 200°C no reduction
- 200°C up to 300°C minus 10 %
- 300°C up to 400°C minus 25 %
Temperatures exceeding 400°C are prohibited!
• RUD-lifting points VRBK-FIX must not be used
with aggressive chemicals such as acids, alkaline
solutions and their vapours.
• Please mark mounting position of lifting point with
a coloured contrast paint for better visibility.
• VRBK-FIX will be delivered with a pink powder
coated lifting ring.
• VRBS-FIX includes a protected positioned clam-
ping spring, inside the weld-on block. The spring
holds the weld-on blocks together with the ring and
creates at the same time a radial clamping function.
• VRBK-FIX will be delivered as a complete assem-
bled unit.
3.2 Hints for the assembly
Basically essential:
• The material construction to which the lashing point
will be attached should be of adequate strength to
withstand forces during lifting without deformation.
The weld-on material must be suitable for welding
and the contact areas must be free from dirt, oil,
colour, ect. The material of the forged welding block
is: S355J2+N (1.0577+N (St52-3))
• The position of the lifting points must be carried
out in such a way that unintended movement like
turning or flipping will be avoided.
• For single leg lifts, the lifting point should
be vertically above the centre of gravity of
the load
• For two leg lifts, the lifting points must be
equidistant to/or above the centre of gravity
of the load.
• For three and four leg lifts, the lifting
points should be arranged symmetrical
around the centre of gravity, in the same
plane if possible.
• Load symmetry:
Determine the necessary WLL of each lifting point
for a symmetrical load by using the following phy-
sical calculation formula:
Number of load bearing strands:
Symmetric Unsymmetric
two leg 2 1
three / four leg 3 1
Chart 1: Load bearing strands (compare to chart 2)
• Check finally the correct assembly (see chapter 4,
Inspection criteria).
3.3 Hints for the welding
The welding should only be carried out according to
DIN EN ISO 9606-1 or AWS Standards by an autho-
rized and certified welder.
Verification of the used weld-on material must be
checked with the supplier of the welding electrodes.
WLL = necessary WLL of lifting point /
single strand (kg)
G = weight of load (kg)
n = number of load bearing strands
ß = inclination angle of single stra
WLL=G
n x cos ß

3
VRBK-FIX
HINTS
• Never weld at the quenched and tem-
pered ring!
• Weld all seams at the same temperature.
1. Check before initial appending of the VRBK-FIX,
the position of the weld-on blocks to each other,
that means the base area must be at the same
level.
2. Append weld-on blocks.
3. Check function of the ring.
The ring must be able to pivot 270°. If necessary
please correct.
4. Once appending and checking of the function
have been carried please finish the root run. The
outside positioned weld layers must be carried out
first. The described welding sequences must be
observed compulsive.
5. Begin at starting point S1 and weld subsequently
the sections 1-4 (Picture 1).
6. Then weld the opposite side identically (starting
point S2 and chapter 5-8).
7. Afterwards close the rot pass at the inside areas.
(chapter 9-10 and 11-12)
Pic. 1: Welding sequence of the root run (S=Starting point
8. Finally please let the parts cool down.
9 Remove any welding mistakes and dirt at the root
weld before applying the cover weld seams.
10.Subsequently please weld the closure welds.
Start at the inside. The described welding se-
quences must be observed compulsive. Chose
type and dimension of weld seam from picture 3
and chart 4.
11.Begin at starting point S3 and weld subsequently
the chapters 1-6 (picture 2)
12.Please weld then the opposite side identically.
(tarting point S4 and chapter 7-12)
HINT
Please adhere the requested weld seam
thickness in any cases. Any change can
result in a malfulction of the ring latch.
Pic. 2: Sequence of closure welding (S=Starting point)
13.Please check by a competent person after
welding the ongoing usage of the weld-on lifting
point (see chapter 4, Inspection criteria).
HINT:
By the position of the weld-seam (HY-weld
circumferential) the following requirements
will be observed: DIN 18800 steel construc-
tions requires: at outdoor buildings or when
strong corrosion must be expected weld
seams must be carried out as continuous
fillet weld seams.
Pic. 3: weld seam
+ +
S1
1
2
3
4
S2
11
12
9
8
7
6
5
10
S4
11
10
9
8 S3
7
12
1
2
3
4
5
6
3.4 User instruction
• Check frequently and before each initial operation
the whole lashing point in regard of linger ability as
a lifting mean, regarding corrosion, wear, deforma-
tion etc. (see chapter 4, Inspection criteria).
ATTENTION
Wrong positioned or damaged weld-on
lifting points as well as improper use can
lead to injuries of persons and damage at
property, when load falls down.
Please check all lifting points carefully
before every usage.

4 VRBK-FIX
Chart 2: WLL overview
• Please check carefully the wear indicator markings
of the weld-on lashing point (see pic. 4 and pic. 5):
Pic. 4 and 5: Wear indicators
• Please note that the lashing mean must be free mo-
veable in the VRBK-FIX. When lifting means (f.e.
lifting chain) are hinged or unhinged, no pinching,
shearing or joint spots must occure during the
handling.
• Avoid damage of lashing means resulting from
sharp edges.
• If RUD-VRBK-FIX lifting points are used solely
for lashing, the value of the working load limit can
be doubled. LC = permissible lashing force = 2 x
working load limit (WLL)
Usage permitted:
no wear marks
visible
Use prohibited:
Replacement criteria rea-
ched.
Material all the way down to
the wear lenses has gone
3.5 Hints for regular inspection
In time periods complying to the need or usage, a
technical expert must control at least once per year
the appropriateness of the lifting point. This inspec-
tion must also be done after each event of damage
or special incident.
4 Inspection criteria
Observe and control the following points before each
initial operation, in regular time intervals, after the
assembly and after special incidents:
• Completeness of the lifting point
• Complete, readable WLL statements as well as
manufacturer sign.
• Deformation at load bearing components like base
body and ring.
• Mechanical damage, like strong notches, especially
in areas where tensile stress occurs.
• Reduction of cross-section due to wear >10 %
• Evidence of corrosion (pittings)
• Evidence of cracks
• Cracks or other damages at weld seam
Method of lift
Number of legs 1 1 2 2 2 2 2 3 / 4 3 / 4 3 / 4
Angle of inclination 0° 90° 0° 90° 0-45° 45-60° Unsym. 0-45° 45-60° Unsym.
Factor 1 1 2 2 1.4 1 1 2.1 1.5 1
Type For the max. total load weight >G< in metric tons
VRBK-FIX 4 t 4 4 8 8 5.6 4 4 8.4 6 4
VRBK-FIX 6.7 t 6.7 6.7 13.4 13.4 9.4 6.7 6.7 14 10 6.7
VRBK-FIX 10 t 10 10 20 20 14 10 10 21 15 10
VRBK-FIX 31.5 t 31.5 31.5 63 63 45 31.5 31.5 66.2 47.5 31.5
VRBK 50 t 50 50 100 100 70 50 50 105 75 50

5
VRBK-FIX
Table 5: Dimensioning Subject to technical alterations
Table 3: Welding procedure + Welding filler metals
Europa (DE, GB, FR, ....)
Structural steel, Low alloyed steel
MAG / MIG
(135)
E-Hand
Gleichstrom =
(111)
E-Hand ~
Wechselstrom
(111)
WIG
(141)
ISO 14341: G4 Si 1
z.B. Castolin 45250
EN ISO 2560-A - E 42 6 B 3 2;
EN ISO 2560-A - E 38 2 B 12 H10
z.B. Castolin 6666 *
Castolin 6666N *
EN ISO 2560-A - E 38 0 RR 1 2
EN ISO 2560-A - E 42 0 RR 1 2
z.B. Castolin 6600 / Castolin 35086
no-load-voltage 35-48 (max.) V
ISO 636: W3 Si 1
z.B. Castolin 45255W
Table 4: Weld seam (weld-on block)
USA, Canada
ISO 14341: G4 Si 1
AWS A 5.18 : ER 70 S-6
z.B. Eutectic MIG-Tec A88
AWS A 5.5 : E 8018-G
AWS A 5.5 : E 7016
EN ISO 2560-A - E 42 6 B 3 2;
EN ISO 2560-A - E 38 2 B 12 H10;
z.B. Eutectic 6666 / 35066 CP*
AWS A 5.1 : E 6013
EN ISO 2560-A - E 38 0 RR 1 2
EN ISO 2560-A - E 42 0 RR 1 2
z.B. Eutectic Beauty Weld II
ISO 636: W3 Si 1
AWS A 5.18 : ER 70 S-6
z.B. Eutectic
TIG-Tec-Tic A 88
HINT
Please note the corre-
sponding user hint in
regard of the welding
filler materials and the
drying requirements*.
GAS SHIELDED
WIRE WELDING
Stick Electrode
Direct Current
Stick Electrode
Alternating Current
TIG - Tungsten
Arc Welding
Pic. 4: Dimensioning
Pivots 270°
Type Size Length Volume
VRBK-FIX 4 t HY 4 + a3 approx. 85 mm approx. 3.2 cm³
VRBK-FIX 6.7 t HY 5 + a3 approx. 95 mm approx. 6 cm³
VRBK-FIX 10 t HY 8 + a3 approx. 155 mm approx. 11 cm³
VRBK-FIX 31.5 t HY 17 approx. 168 mm approx. 21 cm³
VRBK 50 t HY 25 approx. 227 mm approx. 61.4 cm³
Type WLL
[t]
A
[mm]
B
[mm]
C
[mm]
D
[mm]
E
[mm]
F
[mm]
T
[mm]
weight
[kg/pc]
Ref.-No
VRBK-FIX 4 t 4 32 14 28 48 140 29 65 1.0 7902149
VRBK-FIX 6.7 t 6.7 40 20 35 60 180 33 84 2.1 7902150
VRBK-FIX 10 t 10 52 22 46 65 212 46 94 4.4 7902256
VRBK-FIX 31.5 t 31.5 89 42 78 130 394 70 177 24.84 7906225
VRBK 50 t 50 133 70 118 230 626 96 303 76.35 7904653
Table of contents
Other RUD Rack & Stand manuals
Popular Rack & Stand manuals by other brands

Salamander
Salamander UNIFI HUDDLE LITE UHL40A Assembly instructions

Central Machinery
Central Machinery 96300 Assembly and operation instructions

Lab.gruppen
Lab.gruppen CRC-VUL-WH manual

ricoo
ricoo S7211 manual

Primal Vantage
Primal Vantage PVCS-420 Instruction and safety manual

Eneo
Eneo Dome-CH6 Quick installation guide

Hama
Hama 118491 operating instructions

Scosche
Scosche MAGICMOUNT MMD-RPSP1 quick guide

peerless-AV
peerless-AV MOD-CPI quick start guide

Crimson
Crimson A47V instruction manual

CHIEF
CHIEF MSP-WL4 Installation instructions manual

New Star Computer Products
New Star Computer Products FPMA-W25 instruction manual