adafruit learning system MAX9744 User manual

Adafruit 20W Stereo Audio Amplifier - MAX9744
Created by lady ada
Last updated on 2018-08-22 03:40:27 PM UTC

2
3
6
6
7
8
9
11
11
14
17
20
22
22
26
26
28
29
32
32
33
33
33
33
34
34
35
36
37
37
37
37
Guide Contents
Guide Contents
Overview
Pinouts
Power connections
Audio Inputs
Speaker outputs
Breakouts
Assembly
Power capacitor
Speaker Terminals
Power and Line In Terminal Blocks
Basic Test
Analog Control
Preparation
Arduino Digital Control
Assembling Breakout Headers
Connecting up to an Arduino
Run code
Changing the I2C address
Connecting to a Raspberry Pi or BeagleBone Black
Python & CircuitPython
CircuitPython Microcontroller Wiring
Python Computer Wiring
CircuitPython Installation of MAX9744 Library
Python Installation of MAX9744 Library
CircuitPython & Python Usage
Full Example Code
Python Docs
Downloads
Datasheets & Files
Schematic
Layout Dimensions
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 2 of 38

Overview
Pump up the volume with this 20W stereo amplifier! This slim little board has a class D amplifier onboard that can drive
2 channels of 4-8 ohm impedance speakers at 20W each. Power it with 5-12VDC using the onboard DC power jack and
plug stereo line level into the 3.5mm stereo headphone jack and jam out with ease. Since it's class D, its completely
cool-running, no heat sinks are required and it's extremely efficient - up to 93% efficiency makes it great for portable or
battery powered rigs.
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 3 of 38

We like the MAX9744 amplifier at the heart of this board because its very easy to use, but it also has
both analog and
digital
volume control capability. Use a single 1KΩ pot (we include one) to adjust volume analog-style. Or hook it up to
your favorite microcontroller and send I2C commands to set 64-steps of volume amplification.
Some great stats about the MAX9744
Power from 4.5V-14V DC voltage
Up to 93% efficient (88-93% typical)
20mA quiescent current (or put into shutdown for 1uA quiescent)
Up to 29.5dB max gain
Use DC or AC coupled line-level input, up to 3Vpp
Filterless Spread-Spectrum Modulation Lowers
Radiated RF Emissions from Speaker Cables
20W Stereo Output (4Ω, VDD = 12V, THD+N = 10%)
Low 0.04% THD+N
Integrated Click-and-Pop Suppression
Short-Circuit and Thermal-Overload Protection
We took this lovely chip and wrapped it up into a breakout for you, with polarity-protection, jacks and terminal blocks,
i2c level shifting, and a spot to solder in a volume pot.
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 4 of 38

Each order comes with one MAX9744 breakout board with all surface-mount parts fully assembled and tested. We also
include 3 x 2pin and 1 x 3pin terminal blocks, a 470uF power filter capacitor and 1KΩ trim pot. To use this board, a little
soldering is required to attach the terminal blocks and other components, but its fairly easy and expect it should take
less than 15 minutes.
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 5 of 38

Pinouts
Power connections
The MAX9744 amplifier can use between 5-14VDC power. The higher the voltage, the more gain you can get. So if you
want 20W per channel, you'll need to supply 12VDC. The amplifier is a Class D - so it only draws current when its
playing audio, but the voltage requirement is still pretty important. If you pick a voltage too low, you'll hear distortion on
the speakers because the output is 'clipping'
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 6 of 38

There's two ways to get power into this board, either by the 2.1mm DC jack (on the left) or the 3.5mm terminal block
breakout (in the middle). Both are connected up together so use whichever you like.
The 2.1mm DC jack is a 'standard' 2.1mm/5.5mm barrel jack, with center positive connection. The terminal block has
markings showing which pin is positive and which is negative. If powering from a wall adapter, use the DC Jack, the
terminal block is best for battery packs with wires coming out of them. You'll need to solder the terminal block into this
spot, see the Assembly page for details
To the right of the terminal block is a polarity protection MOSFET, it will make sure you only provide positive voltages
to the board! If the polarity is negative, it just wont work. Its more likely to happen with the terminal blocks but its
always nice to have a protection circuit.
All the way on the right is a spot for a electrolytic capacitor. We include a 470uF capacitor in the kit. This capacitor
helps smooth out the power supply. This isn't required when running off of batteries, but if you're using a wall adapter,
especially a really old 'transformer' style one, this will be required. If you want the capacitor, solder it in using the
instructions in the Assembly section
The MAX9744 board draws about 30-50mA quiescent current - that means that even when not amplifying audio you'll
be drawing that much current from the power supply. On top of that, you have to add the current usage for audio
amplification which will vary widely based on audio volume, speaker impedance, amplification, etc.
Audio Inputs
This audio amplifier takes in stereo audio, either using a 3.5mm stereo jack or terminal blocks. Line in audio is a-OK.
The audio inputs are not differential! The ground connection is connected directly to the power ground, this chip
simply does not handle differential inputs. However, the inputs do have blocking capacitors, so if your audio levels
have DC bias, its OK to connect them up directly without extra audio blocking caps.
Line level audio (about 1Vpp) is suggested, but it can handle up to ~3Vpp inputs.
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 7 of 38

The headphone jack is a classic 3.5mm as seen in just about every audio device. You can connect this directly to any
audio output. The terminal blocks are for if you have some direct-wiring project and you want a more permanent
connection. You'll have to solder in the terminal blocks if you want to use that technique, see the Assembly page
Speaker outputs
You got this amp to amplify, and this is where you get that amplified signal out! We use two dual 3.5mm terminal blocks
for the speakers, Left and Right
Oops, on the first rev of the PCB we made a mistake with the breakout labeling, swapping the two channels.
The top pin is LEFT and the bottom pin is RIGHT. The middle pin is still GND
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 8 of 38

The speakers can be 4 to 8 ohm impedance, 20W maximum power. Since it is a class D amplifier, the signal out of
these speaker blocks is a high frequency (~300KHz) PWM square wave. The inductance of the speaker smooths out
this signal into audio frequencies of 20-20KHz.
The outputs are Bridge-Tied-Load which means you can only connect speakers up directly. Don't connect the outputs
to another amplifier! And you can't "parallel" the two BTL outputs for one 40W load either.
To connect up the speakers you'll want to solder in the terminal blocks, see the Assembly section for details
Breakouts
At the very bottom, we break out all the pins you're likely to use with this amplifier. If you're using the amp in Analog
Mode you don't need to connect to any of these, most likely. If you're using the amp in Digital Mode, you may want to
connect to some of them. See the tutorials for each section on how to use the board in either mode.
Above the pinouts there are three solder jumpers (Analog / AD1 / AD2) and then on the left, a 3-pin breakout called
Pot. Vol - these are used in analog mode, the solder jumpers are closed to tell the chip we'll be using a potentiometer
to set the volume. The Pot Vol connection is how we wire up the 1K potentiometer. This is covered in more detail in the
Analog Wiring section.
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 9 of 38

Starting from the left, here are what each pinout connects to:
RIN - this is a duplicate of the audio input terminal block, right channel
LIN - this is a duplicate of the audio input terminal block, left channel
AGND - analog reference ground, the 'quieter' ground for audio signal referencing
SDA - i2c digital signal data, if using Digital Mode to control volume over i2c
SCL - i2c digital signal clock, if using Digital Mode to control volume over i2c
Vi2c - the i2c voltage reference for logic. Only used in Digital mode - connect to 3V or 5V whichever your
microcontroller uses
SHDN - digital Shutdown pin. Connect to ground to turn off the entire chip and put it into low power mode
MUTE - digital Mute pin. Connect to ground to turn off only the audio output stages, its faster than shutdown and
keeps the digital i2c audio levels
SYNCO - Sync output, this is the high frequency signal from the PWM generator, about 1.4MHz
SYNC - Sync input, for advanced users who want to clock in their own PWM frequency, keep it above 800KHz.
AD1 - I2C address select pin #1
AD2 - I2C address select pin #2
GND - Power ground
VDD - 5-12VDC power, from the terminal block/DC jack
after
the polarity protection. You can use this to power
your other projects that can handle 5-12VDC power input.
The solder jumper on the back allows you to connect AGND (analog ground) to DGND (digital ground)
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 10 of 38

Assembly
Begin by placing the amplifier board in a vise so you can
easily work on it. Heat up your soldering iron to 650-700
degrees F and get some solder and hand tools ready!
Power capacitor
We'll start with the power supply capacitor. This cap isn't required if you're powering off of batteries or a good quality
supply, but if you're using wall adapter, this might give you just a little cleaner power especially with high amplification
levels
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 11 of 38

Capacitors are polarized, they have to be placed in the
right way!
The longer lead goes into the pad marked +
Place the capacitor against the PCB and bend the two
leads out so that it sits flat.
Flip over the board so you can solder the two pads
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 12 of 38

Solder in both pads, heating the pad and pins at the
same time with the edge of the soldering iron and
dipping a little solder in.
The ground (-) pin may be a little tough to solder since
the ground plane acts like a large heat sink
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 13 of 38

Clip down both of the long leads using diagonal cutters
so they are nice and neat
Speaker Terminals
You'll want to do this step, where we add the terminal blocks for the speaker outputs. Otherwise you'd have to solder
wires directly to the board which isn't suggested.
Place two of the 2-pin blue terminal blocks so that the
holes point outward
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 14 of 38

You don't need to clip them because they are already
quite short
Remove the tape once you've checked your work
Power and Line In Terminal Blocks
There's also terminal blocks for Power and line-in. These are optional, you can use the DC jack and headphone jack
but if you want to hard-wire in, use these instead of soldering directly to the board!
Place the 2-pin and 3-pin terminal blocks so the holes
point out
© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 17 of 38

© Adafruit Industries https://learn.adafruit.com/adafruit-20w-stereo-audio-amplifier-class-d-max9744 Page 20 of 38
Table of contents