Aqualisa RSDB1X User manual

Rise Digital Bath installation instuctions page 1
Rise
Digital
Bath with overflow filler
The Waste Electrical an Electronic Equipment (Pro ucer Responsibility) Regulation 2004
This product is outside the scope of the European Waste Electrical and Electronic Equipment Directive as interpreted within the UK.
In the UK this product can therefore be disposed of through commercial non-WEEE waste facilities.
The original manufacturer does not accept any liability under the WEEE directive.

Rise Digital Bath installation instuctions page 2
Bath system
Rise Digital Bath with overflow filler
Rise Digital Bath
with overflow
filler - HP/Combi
RSDB1X
Rise Digital Bath
with overflow
filler - Gravity Pumped
RSDB2X

Rise Digital Bath installation instuctions page 3
Components (HP/Combi)
Components (Gravity Pumped)

Rise Digital Bath installation instuctions page 4
Important information
Safety information
This product must be installed by a competent person in accordance with all relevant current Water Supply Regulations.
ALL PRODUCTS REQUIRING AN ELECTRICAL CONNECTI0N UST BE INSTALLED BY A QUALIFIED PERSON FOLLOWING THE LATEST
REVISION OF BS 7671 (WIRING REGULATIONS) AND CERTIFIED TO CURRENT BUILDING REGULATIONS.
This system should be installed so that other taps or appliances operated elsewhere within the premises do not significantly affect the
flow.
The Digital bath must not be used with a hot water supply temperature of over 65ºC.
The processor is supplied factory pre-set at maximum temperature of 45ºC. The maximum temperature is fully adjustable to suit site
conditions. If adjusted, we recommend the outlet temperature is set to a AXI U of 46ºC.
THE DIGITAL PROCESSOR UST BE INSTALLED IN AN ACCESSIBLE LOCATION FOR SERVICING AND AINTENANCE.
The Digital processor must not be installed in situations where either the ambient temperature is likely to exceed 40ºC or where freezing
may occur.
The control must not be installed in situations where the ambient temperature is likely to fall below 5ºC or rise above 70ºC.
We do not recommend the use of Rise Digital in steam therapy facilities.
This appliance must be earthed.
Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of
service and maintenance purposes. Ensure that the conduit is run to avoid the controller fixing holes.
Surface mounted cables must also be protected by a suitable approved conduit, even in a loft, where there may be a risk of damage from
vermin.
The power lead must only be replaced by the manufacturer or his accredited agent.
The user control is supplied from a safety low voltage source.
This product is suitable for domestic use only.
Rise Digital is supplied complete with a 5 year guarantee.
This product is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities or lack of
experience and knowledge, unless they have been given initial supervision or instruction concerning the use of the product by a person
responsible for their safety.
Children should be supervised to ensure they do not play with the product.
Installation of Digital pumpe processor (for gravity store systems)
The Rise Digital pumped bath system is designed to operate up to maximum static pressure of 100kPa
((1 bar)(10 metres head)(14.5psi)).
Under no circumstances must the pumped processor be connected directly to the water main or in line with another booster pump.
The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons). The capacity of the hot
water cylinder must be capable of meeting anticipated demand.
Installation of Digital stan ar processor (for balance high pressure an unvente
systems, combination boiler systems an separately pumpe gravity systems)
Pressures: The Rise Digital standard bath system is designed to operate up to a maximum static pressure of 700kPa ((7 bar)(100psi)).
Where pressures are likely to exceed 700kPa ((7 bar)(100psi)), a pressure reducing valve must be fitted to the incoming mains supply.
A setting of 400kPa ((4 bar)(60psi)) is recommended. It should be noted that daytime pressures approaching 600kPa ((6 bar)(80psi))
can rise above the stated maximum overnight.
Special notes for combination boiler systems
The appliance must have a minimum domestic hot water rating of 24kW (80,000BTU) and be of the type fitted with a fully modulating
gas valve.
If in any doubt, please contact the appliance manufacturer before installation commences.
PLEASE NOTE: DUE TO PERFOR ANCE CHARACTERISTICS OF CO BINATION BOILERS, BATH FLOW RATE AY VARY WITH CHANGES TO
THE AIN INLET TE PERATURE. INLET TE PERATURE CHANGE AY ALSO CAUSE THE DIGITAL CONTROLLER TO FLASH. THIS IS NOT
NECESSARILY CHANGING THE OUTLET TE PERATURE.
Special notes for separately pumpe gravity systems
We recommend a twin ended pump with a INI U pump rating of 1.5 bar. For optimum performance a twin ended 2.5 bar pump
should be used.
The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons). The capacity of the hot
water cylinder must be capable of meeting the anticipated demand.
THIS PRODUCT IS NOT SUITABLE FOR USE WITH A SINGLE ENDED PU P.
Connections
This product incorporates ‘push-fit’ type connections. Tube should be cut using a rotary type cutter and lubricated using a silicone-
based lubricant or petroleum jelly (Vaseline or similar) prior to insertion into the fitting.
If plastic pipe is used, the tube insert must not increase the tube diameter or extend the cut-off length by more than 2mm.
THESE FITTINGS ARE NOT SUITABLE FOR STAINLESS STEEL TUBE.

Rise Digital Bath installation instuctions page 5
Important information
Flushing
Some modern fluxes can be extremely corrosive and, if left in contact, will attack the working parts of this unit. All soldering must be
completed and the pipe work thoroughly flushed out in accordance with current Water Supply Regulations prior to connection of the
product.
After installation
Familiarise the end user with the Rise Digital operation and hand them this guide. Complete and post the guarantee card or register
online at www.aqualisa.co.uk

Rise Digital Bath installation instuctions page 6
Step-by-step instructions
70mm
This product must be installed by a competent person in accordance with
the current Water Supply Regulations.
In addition to the guide below it is essential that the written instructions
overleaf are read and understood and that you have all the necessary
components (shown overleaf) before commencing installation.
The Rise Digital bath system is supplied with universal fixings intended
to secure it to a suitable wall.
!
90mm
445mm
270mm
350mm
265mm
To ensure safe operation and installation of this product, the
processor UST be installed in one of the orientations shown.
1
Isolation valves are supplied with the
Digital processor and must be fitted on
both inlets and the blended water outlet.
All pipe work should be run in 15mm
pipe. All pipe work should be supported.
For externally pumped gravity fed
installations, 22mm pipe work should
be run as close to the processor as possible
before reducing down to 15mm.
2
The inlet supply centres are 48mm. The inlet supply centres
deviate from EN1111 and EN1287, but are deemed to be a
special case.
Please note arrow on isolation valve to indicate direction of flow.
Compression fittings should not be used on the inlet and outlet
spigots and may affect the warranty if fitted.
!

Rise Digital Bath installation instuctions page 7
Choose the position for your Digital processor as close to the
bath control as possible.
The processor may be sited in the roof space above the proposed
bath site, in the airing cupboard or behind a screwed bath panel
if more convenient. If siting in the roof space, ensure that
freezing cannot occur and that no insulation material is placed
under or over the processor. Please refer to the system layout
diagrams overleaf.
3
!The distance between the Digital processor and bath control
must be within range of the 10m data cable supplied.
THE PROCESSOR UST BE SITED IN A POSITION THAT IS SAFELY
ACCESSIBLE FOR SERVICING AND CO ISSIONING PURPOSES.
WHEN FITTED IN THE LOFT SPACE, THE ROUTE TO AND THE AREA
AROUND THE PROCESSOR UST BE BOARDED TO ENSURE SAFE
WORKING ENVIRON ENT
Place the Digital processor on a solid
mounting surface, and place the fixing
feet into suitable positions. ark then
drill and prepare suitable fixings before
securing the processor to the mounting
surface using the screws provided.
4
Flush out the hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more
than 65˚C.
!
Attach the supply pipes to the Digital
processor, ensuring that the cold and
hot feeds are fitted into the
appropriately marked inlets.
6
DO NOT SOLDER NEAR TO PLASTIC CO PONENTS.
!
Run a pipe from the mixed water outlet on the Digital processor through
to the proposed siting for the bath fill outlet.
7
Suitable non restrictive double check valves (not supplied) UST
be fitted to the blended outlet pipe in line with current Water
Supply Regulations.
!

Rise Digital Bath installation instuctions page 8
Place the paper template on the wall
in the desired location for the bath
control and mark all fixing points and
the data cable entry point. Remove the
template and drill a Ø16mm hole
at the appropriate position for the data
cable.
8
The data cable should be run in conduit to allow for replacement if
required.
!
Drill and prepare the four wall fixings for the controller using the
fixings provided.
9
Feed the control connection end of the
data cable through the centre hole in
the mounting template. Run a bead of
silicone sealant in the mastic groove
on the back of the mounting plate and
press into position onto the finished
wall surface. Ensure the data cable is
held securely by the narrow middle slot
of the mounting plate and fix to the
wall using the screws provided.
10
Plug the data cable into the rear of the
controller and push fully home. Slide the
controller assembly onto the mounting
plate. Secure the controller to the back
plate with the fixing screw located at the
base of the controller using a small
Posidrive screw driver.
11
Connect the 15mm copper pipe to the mixed water outlet on the
Digital processor. Using pipe clips as appropriate, ensure that all pipe
work is perpendicular to the processor, i.e. not putting any strain on
the fittings.
12
TO ENSURE OPTI U PERFOR ANCE USE THE INI U
A OUNT OF ELBOWS.
!

Rise Digital Bath installation instuctions page 9
Unscrew the single fixing on top of the
processor box and carefully tilt the lid up
and off the location lugs and pull the lid
clear.
14
Connect the processor power lead to a
double pole 3 amp fuse switched spur
incorporated in the fixed wiring circuit,
in accordance with current wiring rules.
Ensure that this is located in an
accessible, dry location and not in the
bathroom.
13
THIS APPLIANCE UST BE EARTHED
We recommend protecting surface mounted cables in suitable
approved conduit to avoid the risk of damage from vermin.
The data cable and power lead should also be clipped in place with
‘P’ clips or similar to avoid accidents.
!
BEFORE ANY ELECTRICAL ADJUST ENT IS ATTE PTED, THE
ELECTRICITY SUPPLY UST BE TURNED OFF AT THE AINS SWITCH.
ELECTRICAL INSTALLATION AY ONLY BE CARRIED OUT BY A
QUALIFIED PERSON.
!
Connect the low voltage data cable into
the socket adjacent to the temperature
adjuster as indicated on the label.
Feed the cable out of the processor box
ensuring it is correctly routed within
the data cable channel.
15
A further data cable socket has been provided for use with a secondary
Rise Digital Wired remote start/stop controller. This can be accessed by
carefully snapping and removing the entry pillar and connecting the
cable as described above.
!

Rise Digital Bath installation instuctions page 10
The Digital processors are supplied
factory set with the flow rate at either
‘NOR AL HP’ or ‘NOR AL GRAVITY’
mode depending on which bath
system has been ordered.
STANDARD PROCESSORS ON BALANCED
HP SYSTE S:
Standard processors fitted to balanced high pressure systems may
be set to ‘NOR AL HP’ or for water economy ‘ECO’ modes.
N.B. We recommend the processor is set to ‘NOR AL HP’ mode.
STANDARD PROCESSORS ON CO BINATION BOILER SYSTE S:
For Standard Digital processors installed on combi boiler systems, for
optimum performance we recommend setting the flow rate to the
‘CO BI’ mode.
16
N.B. The ‘ECO’ flow rate mode should not be selected for bath systems
fitted to combination boilers.
PU PED PROCESSORS:
Pumped processors fitted to gravity systems may be set to ‘NOR AL
GRAVITY’ or for water economy ‘ECO’ flow rate modes.
N.B. We recommend the processor is set to ‘NOR AL GRAVITY’ mode.
WHEN AKING ANY ADJUST ENT TO THE PROCESSOR SETTINGS
THE POWER UST BE ISOLATED.
!
Run the bath at maximum temperature
(factory pre set to 45
0
C). If required,
maximum temperature adjustment can be
made with a flat bladed screwdriver using
the ‘ AX’ TE P ADJUST ENT’ control as
indicated. When the temperature has been set
to the desired position carefully replace the
Digital processor lid and secure the fixing hand tight only.
17
Site conditions can affect temperature settings, installer to adjust as required.
ALL COPPER PIPE WORK UST BE CROSS-BONDED AND CONNECTED TO A
RELIABLE EARTHING POINT.
!

Rise Digital Bath installation instuctions page 11
Commissioning
With the bath plug in, push and hold the
start/stop button for 3 seconds to invoke
memory run time record mode.
1
The LED’S will flash constantly when in record
mode, regardless of whether the system has
reached the desired temperature.
!
When the bath water level has reached the desired height, press the start/stop
button to turn off the bath fill.
2
The amended run time has been recorded.
3
The Rise Digital bath product has a factory set maximum run time of 12 minutes.
If required this can be adjusted anywhere from 1 second up to 30 minutes to suit
the site conditions by adopting the following procedure.
!
Due to the performance characteristics of combination boilers, seasonal
temperature change will affect bath flow rate. This in turn may affect bath
depth level.
!

Rise Digital Bath installation instuctions page 12
Step-by-step instructions
Bath overflow filler
This product must be installed by a competent person in accordance with the
current Water Supply Regulations.
If an alternative bath outlet or bath spout with hand shower combination is
used, due to the restrictive characteristics of some of these products, outlet
flow rate may be affected. Aqualisa Products Ltd cannot guarantee outlet flow
rate if an alternative outlet solution is used. Please refer to the manufacturer’s
installation guide for full fitting instructions.
Aqualisa Products Limited reserves the right to revoke the guarantee if
an overhead shower kit system is fitted with a bath controller.
!
The bath overflow filler is suitable for baths up to a maximum thickness
of 24mm.
!
Carefully unscrew and remove the overflow filler
outlet from the body assembly and set aside.
1
Carefully unscrew and remove the bath waste
clicker assembly from the waste body and set
aside.
2
Offer the bath waste into position ensuring the
rubber washer is correctly aligned between the
waste assembly and the bath base.
3
Ensuring the rubber washer is correctly aligned,
pass the bath waste clicker through the bath
and secure to the waste body assembly.
4

Rise Digital Bath installation instuctions page 13
Connect the bath waste to a suitable waste pipe.
5
Offer the outlet body assembly into position at
the rear of the bath ensuring the rubber washer
is correct aligned between the outlet body
assembly and bath wall.
6
Ensuring the rubber washer is correctly aligned,
pass the overflow filler outlet through the bath
and secure to the body assembly.
7
Remove the relevant inlet blanking plug and
attach the flexible hose to the blended inlet
connection.
8
Connect the flexible hose to the blended supply pipe ensuring suitable non
restrictive double check valves are fitted in line with current Water Supply
Regulations (not supplied).
9
Waste pipe extension it
If required, for larger baths, a 900mm waste pipe conversion kit is available
from Aqualisa Customer Service department. Please contact customer services
on 01959 560010.
Unscrew the clamping nut and remove the
waste pipe from the waste assembly.
!
1

Rise Digital Bath installation instuctions page 14
Remove the clamping nut and sealing washer from the waste pipe and
set aside.
2
Carefully pull the waste pipe away from the
outlet assembly.
3
Reassemble the unit using the longer waste
pipe by reversing the above procedure.
4

Rise Digital Bath installation instuctions page 15
Digital bath controller user gui e
1. Turn the temperature dial to the required setting.
2. Press the ‘start/stop’ button on the control.
3. The LED display will flash until the selected temperature has been reached
and will then remain constant.
4. The temperature may be adjusted once the Digital bath is in use.
5. Press the ‘start/stop’ button to stop the bath filling when at the desired depth.
N.B. The bath fill can be stopped at any time by pressing the ‘start/stop’ button.
Bath ‘Top up’
Rise Digital Bath features a ‘Top up’ button wich provides a method of topping
up your bath at the desired temperature at a minimum flow rate. To operate the
bath in ‘Top up’ mode:
1. Turn the temperature dial to the required setting.
2. Press the ‘Top Up’ button to begin topping up
the bath. The bath will run for 1 minute
before stopping automatically.
N.B. The bath fill can be stopped at any time by
pressing the ‘start/stop’ button.
Bath overflow filler user gui e
1. Push the aste cover to engage the plug fitting.
2. Push the aste cover again to disengage the
plug fitting.
Cleaning
Your Rise Digital Bath system should be cleaned using only a soft cloth and
washing-up liquid.
DO NOT USE ABRASIVE CLEANERS

Rise Digital Bath installation instuctions page 16
Supply
Vent and draw-off
pipe to hot water
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
NB: THE BASE OF THE PROCESSOR
MUST BE SITED NO HIGHER THAN
THE BASE LEVEL OF THE CISTERN
10m
max Digital
shower
control
Supply
Hot water
cylinder
10m
max
Digital
shower
control
10m
max
Digital
shower
control
Central
heating
boiler
Supply
Typical gravity system installation
(compatible with pumped processor)
T
Typical HP system installation
(compatible with standard processor)
Typical thermal storage unit system installation
(compatible with standard processor)
T
Typical installations
Supply
Pressure
reducing valve
if required
10m
max
Digital
shower
control
Supply
Vent and draw-off
pipe to hot water
Underside of cistern
Hot water
cylinder NB: 1.5 bar MINIMUM pump rating
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Digital
shower
control
Typical combination boiler installation
(compatible with standard processor)
T
Typical pumped system installation
(compatible with standard processor)

Aqualisa Products Limited
The Flyer’s Way
Westerham Kent TN16 1DE
Sales enquiries: 01959 560010
Republic of Ireland 01-864-3363
Customer helpline: 01959 560010
Republic of Ireland 01-844-3212
Brochure Hotline: 0800 652 3669
Website: www.aqualisa.co.uk
Email: [email protected]
Please note that calls may be recorded for training and quality purposes
The company reserves the right to alter, change or modify the product specifications without prior warning
® Registered Trademark Aqualisa Products Limited
Part No:700067 Issue 01 Jan 12
This manual suits for next models
1
Table of contents
Other Aqualisa Kitchen & Bath Fixture manuals
Popular Kitchen & Bath Fixture manuals by other brands

Signature Hardware
Signature Hardware CORDELIA 948528 Installation

Gröne
Gröne 27 641 manual

Pfister
Pfister Contempra 016-NC1 Quick installation guide

Pfister
Pfister Serrano GT42-SR1 Quick installation guide

Spectrum Brands
Spectrum Brands Pfister Iyla 016-TR1 Quick installation guide

Zomodo
Zomodo BTC015 User instruction