
TERRANOS®
Netscapes
3 Mounting of the GEOBALL 5
3.1 Framework Assembling
A. Coarse adjustment of the foundation points at the play area.
! Attention: The GEOBALL 5 will be mounted at the final place. You
dig the foundation pits under the foundation balls after
completing the mounting. !
B. The right position of structural tubes and balls is described in the frame-
work plan, chapter 3.2.2. Usually the balls type G5 as well as the
structural tubes 60 x 2 x 1191 are black coloured and the balls type G6
as well as the structural tubes 60 x 2 x 1223 are crimson coloured. The
markers for the ball types are at the border of the assemble opening.
C. The framework will be assembled level by level.
! Attention: Tighten the screws at first not with full strength.!
D. You have to centre the horizontal structural tubes ( black = horizontal
and crimson = soft inclined ) of the playground level at drill-holes of the
foundation balls. Fix the structural tubes with hexagon head cap screws
M 20 x 80, washers and spring washers from the inner side of the ball.
For each length of the tubes we use other connection types at the balls.
The groove for fixing the crimson
structural tubes 60 x 2 x 1223 is
ring-shaped and is disc-shaped for
fixing the black tubes 60 x 2 x 1191.
You mount the ring completely. The
structural tube at the entrance has
to be removed from the ring when
mounting the framework and will be
used in the higher again.
structural tube
ball connector
∅250 mm
washer
spring washer
hexagon head cap
screw M 20 x 80
E. Adjust the GEOBALL 5 finally after ring mounting at playground level.
( see foundation plan, chapter 3.1.1 )
F. Centre the next structural tubes, showing inclined into height, at the
free drill-holes of the foundation balls and fix the tubes with hexagon
head cap screws M 20 x 80, washers and spring washers from the
inner side of the ball. ( see drawing point D )
G. Next fix the ball at the other end of the structural tube with hexagon
head cap screws M 20 x 80, washers and spring washers. Go ahead
step by step by mounting balls and tubes level by level like described.
( refer to drawing point D )
H. After completing framework mounting you have to tighten the screws
completely. Please adhere to the use of tools recommended in chapter
1.2 in order to avoid higher initial tension.
Mounting Instruction
TERRANOS®
GEOBALL 5
Version Jan. 1997
Page 4 of 14