Booth & Co BC-AXB-109-CP User manual

AXBRIDGE
BC-AXB-109-CP, BC-AXB-109-BN
BC-AXB-209-CP, BC-AXB-209-BN
INSTALLATION GUIDE
This instruction booklet covers model:
BC-AXB-109-CP
BC-AXB-109-BN
BC-AXB-209-CP
BC-AXB-209-BN
Version 1, 1-5-19
VADO
Wedmore Road, Cheddar,
Somerset, England BS27 3EB
tel 01934 744466
fax 01934 744345
www.vado.com
sales@vado.com

23
Please read these instructions carefully before starting installation and keep for
future reference.
Remove all packaging and check the product for missing parts or damage before
starting installation.
Any alterations made to this product and fittings may infringe water regulations and
will invalidate the guarantee.
The installation must comply with all Local/National Water Supply Authority
Regulations/Byelaws and Building and Plumbing Regulations.
To be installed in accordance with BS EN806.
We strongly recommend that you use a qualified and registered plumber.
General installation
Important - please read
This fitting is a mixing device and therefore water supplies should be reasonably
balanced.
When installed, the fitting must comply with the requirements of the Water Supply
(Water Fittings) Regulations 1999 and Scottish Byelaws 2004.
For further information, contact the Water Regulations department of your local water
supplier (see the WRAS website www.wras.co.uk for details) or the Water Regulations
Advisory Scheme by email (info@wras.co.uk) or telephone: 01495848454.
Before making any inlet pipe connections, all supply pipes MUST be thoroughly flushed
to remove debris. Failure to do so could result in damage or low flow from the mixer
unit. Water Supply (Water Fittings) Regulations 1999 Schedule 2 Section 13.
The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.
Please take great care when installing this mixer not to damage its surface.
Please note if installing in an enclosed environment, access should be left for servicing
and maintenance. No costs relating to inadequate access can be accepted.
Operating Specifications
Operating Pressure
Minimum operating pressure 0.2 bar
Maximum operating pressure 5 bar
Contents of Packaging
Installation guide &
User manual
AX BR ID GE
BC- A XB -10 9- C P, BC- A XB -10 9- BN
BC- A XB -2 0 9- CP, BC -A X B -2 09 -B N
INS TA LL A TI ON G UI DE
WA LL M O UN T E D B A SI N M I X ER
US ER GUID E
KE EP FOR
FU TURE R EFER ENC E
AX B RI DG E
Valve mortar guards x 2
Spout mortar guard
Spline extension x 2
Valve extension x 2
Spout connector
Hex key
Cutting guide
Valve body
Cover with O-ring
Spout

4
Contents of Packaging
Cross handles with spring washer, lock washer, screw and screw cover
Lever handles with spring washer, lock washer, screw and screw cover
Handle shroud assembly
Cross handle option OR Lever handle option
5
Dimensions
219mm
130mm
202mm
200mm
60mm 60mm
55mm
Handle dimensions
100mm
Lever handle
Cross handle
56mm min
to
81mm max

6
Installation - Quick guide
2
1
4
3
1
2 3
4
0 5
1
2 3
4
0 5
1
2 3
4
0 5
1
2 3
4
0 5
x 2
x 2
7
Installation - Quick guide
8
10
20Nm
7
9
x 2 x 2
x 2
5 6
x 2 x 2

8 9
Installation - Quick guide
14
16 17
13
15
XX
Installation - Quick guide
1918
20
x 2
1211 x 2

1110
Installation
Remove lock nut from the valve, then
release the valve from the body, but do
not remove.
They should both be hand tight.
Place the handle assembly onto the
spline extension and then onto the valve.
Using light force only turn the handle
clockwise until you feel a noticeable
resistance when the base of valve
touches down on the body of the tap.
Turn the handle so the valve is in the
closed position, then remove the handle.
Valve
Lock nut
Handle
assembly
Valve
Spline
extension
Handle
Installation
Warning! Please check for any
hidden cables and pipes before drilling
holes
in the wall.
Before installing your new mixer, flush
through pipe work to ensure removal of
debris, turn off the water supply.
The valve must be set into the wall
(56mm min - 81mm max).
Offer the valve up to the wall, mark the 4
wall fixing positions and drill holes to take
suitable wall plugs and screws. Fix in po-
sition. If you are fitting to a partition wall
or a wall of particularly soft substrate you
will need specialist fixings.
Make all connections to the valve.
Connect hot supply to the left inlet and
cold supply to the right inlet.
Remove lock nut from the valve, then
release the valve from the body, but do
not remove.
They should both be hand tight.
Hot inlet pipe
Cold inlet pipe
Cold inlet
Screws
Wall plugs
Hot inlet
Valve
Lock nut

12
Installation
Refit the handle back onto the spline so
it is as square as possible (do not worry
if it is not perfectly aligned at this stage).
Without forcing the handle, adjust the
handle and the valve together so that the
handle is perfectly straight making sure
you do not unscrew the valve by more
than 20°.
Should you do so you will need to go
back to the beginning of this section and
start again. Test the action of the handle
and valve making sure that the handle is
perfectly straight in the off position.
Lever handle
The lever on the handle should point
either outwards or downwards when in
the off position.
Remove the handle and spline extension.
Place the lock nut over the valve and
screw down. Use a torque wrench to
tighten the nut down to 20Nm.
Slide the spline extension back onto the
valve. Screw the handle extension on to
the valve.
Repeat the same procedure for the other
side.
Double check the entire installation for
function, leaks and look.
Screw the mortar guards in place. The
tapered one fits in the middle.
Handle
assembly
Valve
Spline
extension
Handle
extension
Mortar guards
Lock nut
13
Installation
Finish the wall by tiling up to the mortar
guards, keep the final finished wall
surface between the min and max
dimensions.
Unscrew and remove the mortar guards
from the valve.
Screw the cutting guide onto the handle
extension in turn.
Using a hacksaw along the side of the
cutting guide cut through both the
handle extension and spline extension.
Remove the cutting guide clean up any
burrs and remove any debris.
Repeat for the other side.
Cutting
guide

14
Installation
Screw the spout connector through the
finished wall and into the valve as far as
it will go.
Measure the distance (X) from the wall
and the back of the collar.
Remove the connector from the valve.
Measure the distance back from the
end of the connector and cut off using a
hacksaw.
Remove any burrs and debris.
Spout
connector
X
X
15
Installation
Using PTFE tape on the connector screw
into the valve. Tighten using an hex key
in the end of the connector.
Do not over tighten.
Slide the cover over the end of the spout,
make sure that the O-ring is in position
within the cover.
Carefully slide the spout onto the
connecting tube until it touches the wall,
make sure not to damage the seal on
the connecting tube.
From the underside tighten the 2 x grub
screws with the supplied hex key
Finally screw on the handle assemblies.
Make sure that the O-ring is in position
within the cover
With the handles pointing in the right
direction slide the assembly onto the
splines, screw on the cover until it
touches the wall , hand tight only.
Be careful not to damage its surface of
the taps.
The hot should be on the left and cold on
the right.
Cold handle
assembly
Hot handle
assembly
Spout
Spout
connector
Cover &
O-ring
Spout
connector
Hex key
This manual suits for next models
3
Table of contents
Other Booth & Co Kitchen & Bath Fixture manuals
Popular Kitchen & Bath Fixture manuals by other brands

Hans Grohe
Hans Grohe Talis S 100 72020 1 Series Installation/User Instructions/Warranty

Project Source
Project Source FP4AF261CP manual

Anzzi
Anzzi FR-AZ574 installation guide

Glacier bay
Glacier bay HD67896W-1101 Use and care guide

Gerber
Gerber C4-44-050-61 manual

Hans Grohe
Hans Grohe Talis Select S 100 Instructions for use/assembly instructions