Page 5 of 17 DAKA Furnace Model 622 2008 Edition
Rev 2B: 11-9-12
G. Install two 550-cfm blowers (14) on back of furnace using four No. 12 x ½" screws
provided.
H. Furnace is shipped with air jacket already fitted and installed. If it has worked loose
during shipping or unpacking, do the following:
1. Remove air jacket top (15) by lifting up from front to back only, not side to side.
2. Ensure that bottom air jacket panel (16) is fully seated between lower bottom
support angles.
3. Ensure that channels welded on air jacket sides (17) engage the lower support
channels, and that the side panels are pressed tightly onto furnace around the
front and back corners.
4. Reinstall the air jacket top from back to front, making sure that all top edges of
each of the air jacket sides are inside of top.
5. Install Swing Plate (19) on hooks inside combustion chamber above Fire door
opening, with bent edge inward.
III. FURNACE CONTROL CENTER ASSEMBLY –See FIG. 6 & 6A Wiring Schematic
NOTE: Furnace is designed for installation with supply connection on left side;
should right side supply connection be preferred, it is possible to exchange side air
jacket panels, but conduit and wiring provided will not be usable then, and will
have to be replaced locally.
A. On left side air jacket panel, locate the 3/4" hole toward top of panel.
B. Remove cover on Fan Control. Using three 1¼” tube spacers provided,
proceed to mount the Fan Control (4) to the side of the panel, using No. 12 x
2" screws provided. Fan Control is to be held 1½” away from air jacket side by
tube spacers to provide thermal protection for electronic components.
C. Approximately 8" below Fan Control are four pre-punched holes. Mount
Junction Box Ring (2) here, using two No. 12 x 2” screws through slots on back
of ring. Remove one knockout on top of ring and two knockouts on bottom.
Install Straight Conduit Connectors provided for unit wiring.
D. Mount Snap Disc Operating Control (20) on side of furnace within Junction Box
Ring, using two No. 12 x ½” screws in pre-punched holes.
E. Insert pre-installed wiring from Fan Control into top center knockout on
Junction Box. Make sure straight conduit connector is in place first.
F. Connect conduit from front Draft Blower to Junction Box. Remove top
knockout from small Junction Box on front draft blower housing. Insert 90°
conduit connector. Locate the 34” long flex conduit that contains 1 red
and 1 white wire. . Attach flex conduit and make wire connections
according to Wiring Schematic in FIG. 6 & 6A.
G. Connect conduit from Rear Blowers to Junction Box. Remove side knockout
on Junction Box on rear blower housing. Insert 90° Conduit Connector.
Locate the 34” long flex conduit that contains 1 brown and 1 white wire.
Attach flex conduit and make wire connections according to Wiring
Schematic in FIG. 6 & 6A.