Flaman Fitness Deluxe X12103 User manual

ASSEMBLY – The Deluxe Playground ModEL X12103
Please note: e swing bay is an available
option for residential use only

THE PIECES
A – 10’ Pole with 1 Platform Ring, 2 Attachment Rings: 1 Piece
B – 10’ Pole with1 Platform Ring, 3 Attachment Rings: 1 Piece
C – 10’ Pole with 2 Platform Rings, 2 Attachment Rings: 1 Piece
D – 10’ Pole with 2 Platform Rings, 3 Attachment Rings: 1 Piece
E – 8’ Pole with 2 Platform Rings, 3 Attachment Rings and
Domed Cap on top: 2 Pieces
F1 & F2 – 45” x 45” Platform: 2 Pieces
H – 37” x 12” Platform Step: 1 Piece
J – 39” x 42” Railing: 1 Piece
K – 7.5” x 42” Stair Railing: 2 Pieces
L – 39” x 53” Climbing Pole Railing: 1 Piece
P1 – 37” x 45” Spinning Bead Wall: 1 Piece
P2 – 37” x 45” Buttery Wall: 1 Piece
Q – Double Slide: 1 Piece
R – Double Slide Roof: 1 Piece
T – Climbing Pole: 1 Piece
U – Roof: 1 Piece
V – Stairs: 1 Piece
THE PARTS
W – ½” x ¼” Ring Bolts: 28 Pieces
X – ¼” Ring Nuts: 28 Pieces
Y – 1” x 3/8” Platform/Railing bolts: 6 Pieces
Z – 1.5” x 3/8” Platform/Railing Bolts: 24 Pieces
AA - 3/8” Platform/Railing nuts: 18 Pieces
DD – Ring Attachment Clamp Top with Round Bolt Hole: 16 Pieces
EE – Ring Attachment Clamp Bottom with Hex Nut Hole: 16 Pieces
FF – 1” Self Tapping Screws: 8 Pieces (bag may include more)
GG – 2 ¼“ Self Tapping Screws: 4 Pieces
HH – 3/8” Washers: 48 Pieces
JJ – Allan Key
NOT INCLUDED:
Minimum 8’ Ladder
iMportAnt!
Please read each step completely before beginning it.
Only tighten Bolts once instructed to do so.
Ensure all pieces are included before starting to assemble.
Pay attention to each piece; some pieces are very similar with only minor dierences.
ASSEMBLY – The Deluxe Playground ModEL X12104

NOT INCLUDED:
Minimum 8’ Ladder
BEforE You BEgin – Check Ring Heights on Poles A, B, C, D, E1 & E2
There are two types of Rings:
Platform Rings: these rings have one bulge on the side with a
bolt-hole, which a platform will rest on and then be bolted to.
Depending on the pole, there will be 1 or 2 Platform Rings.
e First Platform Ring will always be the lowest on the pole
and if there is a 2nd platform ring on a pole, it may be the
2nd or 3rd lowest.
Attachment Ring: ese rings do not have the same bolt-
hole as a Platform Ring; they are just a plain ring around the
pole. Depending on the pole, there will be 2 or 3 Attachment
Rings.
There are two types of Poles:
Poles A, B, C, and D will also have a bracket on the top to
secure the roof to.
Poles E1 and E2 will have rounded caps on the top.
iMportAnt!
Poles A, B, C, D, and E have various numbers of
Rings on them. ese Rings sometimes slide in
transit so it’s crucial that you measure and reset
the ring heights, if necessary, before starting
Assembly. See below for the types of Rings on
each pole and the proper heights of each.
PLATFORM RING
ATTACHMENT RING
A
B
C
D
E1&E2
Platform ring
Platform ring
Platform ring
Platform ring
Platform ring
Platform ring
87”
75”
32”
86.5”
75”
32”
51”
44”
86.5”
75”
44”
32”
32”
87”
75”
51”
Platform ring
44”
86.5”

pArtS – The Deluxe Playground ModEL X12104
W – ½” x ¼” Ring Bolts:
28 Pieces
GG – 2 ¼“ Self Tapping Screws:
4 Pieces
FF – 1” Self Tapping Screws:
8 Pieces (bag may include more)
Z – 1.5” x 3/8” Platform/Railing
Bolts: 24 Pieces
Y – 1” x 3/8” Platform/Railing
bolts: 6 Pieces
AA - 3/8” Platform/Railing nuts:
18 Pieces
X – ¼” Ring Nuts: 28 Pieces
HH – 3/8” Washers: 48 Pieces JJ – Allan Key
DD – Ring Attachment Clamp Top
with Round Bolt Hole: 14 Pieces EE – Ring Attachment Clamp Bottom
with Hex Nut Hole: 14 Pieces

StEp 1 – Attach Poles A, B, C, D to Platform F1
STEP 1A Attach poles A and B to Platform F1
Attach Poles A to any corner on Platform F by inserting (1)
Bolt Z, (2) Washer HH and (1) Nut AA, into the bottom
Platform Ring (32” high). Repeat to attach Pole B to Platform
F on the corner to the right (when standing at Pole A). Do
not tighten bolts.
STEP 1B – Attach poles C and D to Platform F1
Have two people hold poles A and B upright as you li the
platform F from the opposite side to Attach Pole C and D.
Attach Pole C to the corner that is to the le of Pole A (when
standing at Pole A) by positioning and inserting (1) Bolt Z,
(2) Washer HH and (1) Nut AA into Platform Ring (32”
high) on Pole C to attach it to Platform F. Have a person hold
Pole C while attaching the last open corner of Platform F to
Pole D on the Platform Ring (32” High) with (1) Bolt Z, (2)
Washer HH and (1) Nut AA.
IMPORTANT!
Step 1 requires 4 people
A person must hold each pole upright until the nuts are
tightened to prevent buckling and bending of the poles
while the bolts are loose.
Aer all four posts are attached, tighten the bolts to
stabilize the structure before moving on to step 2.
pArtS
Posts A, B, C, D,
(1) Platform F,
(4) Bolt Z,
(4) Nut AA,
(8) Washer HH
* It doesn’t matter which
Platform F you use rst.
From here forward, the one
you choose will be referred
to as Platform F1
STEP 1A
STEP1A
D
C
A
B
F1
32”
32” 32”
32”

StEp 2 – Attach Stairs V & Stair Railing to Platform F1
STEP 2A Attach stairs to platform F
Attach Stairs V to Platform F on the side between Poles A
and C using (2) Bolts Z and (2) Washer HH. Screw the bolt Z
by starting under platform F and pushing them through the
holes in the lip pf Platform F and into the threaded ends of
stairs V.
STEP 2B – Attach ring clamps to stair railing
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to Top of (1) Stair Railing K using (2) Ring Bolts
W and (2) Ring Nuts X. Repeat for Second Step Railing K.
Now, Attach (1) Stair Railing K with Clamps EE and DD to
Attachment Ring on Pole A (75” from the Ground). Fasten
Second Railing K with Clamp EE and DD to Attachment
Ring (75” form the ground) on Pole C. Insert (1) Bolt 4, (2)
Washer HH, and (1) Nut AA (Order: bolt, washer, railing,
platform, washer, nut) through the bottom of Railing K to
Platform F and repeat for other Railing K.
IMPORTANT!
Tighten all bolts in this step before moving on to step 3
pArtS
Stairs V
(2) Bolt Z
(6) Washer HH
(2) Stair Railing K
(2) Ring Clamp EE & DD
(4) Bolt W
(4) Nuts X
(2) Bolt Y,
(2) Nut AA
STEP2B
STEP 2A
K
C
A
K
V
STEP
2A
STEP 2B
F1
32”
32”
75”
75”

StEp 3 – Attaching slide and slide roof
STEP 3A Attach slide to Platform F1
Attach Double Slide Q to Platform F on the side between
Poles B and D using (4) Bolts Z and (4) Washers HH through
the pre-threaded holes in the Slide. Under Platform F out and
into slide.
STEP 3B – Attach clamps to double slide roof
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to one end of Double Slide Roof R using (2) Ring
Bolts W and (2) Ring Nuts X. Repeat for other three ends of
Slide Roof R.
STEP 3C – Attach slide roof to poles B & D
Fasten the clamps on the Bottom sides of Slide Roof R to
Attachment Rings on Poles B and D that are 51” from the
ground. Fasten the clamps on the top sides of Slide Roof R
to Attachment Rings on Poles B and D that are 75” from the
ground.
IMPORTANT!
Tighten all bolts in this step before moving on to step 4
pArtS
Double Slide Q
(4) Bolt Z
(4) Washer HH
Double Slide Roof R
(4) Ring Clamp EE & DD
(8) Bolt W
(8) Nut X
STEP 3B
STEP 3A
STEP
3B
D
C
A
B
STEP 3A
Q
R
F1
32”
32”
75”
51”
51”
75”
STAIR V
32”

StEp 4 – Attach Step H to Platform F1
STEP 4A Attach Step H to Platform F1
Attach the Platform Step H to Platform F, between Poles C
and D, using (3) Bolts Z, (6) Washers HH, and (3) Nuts AA
(Order: bolt, washer, step/platform, washer, nut).
DO NOT tighten bolts until the end of step 5.
IMPORTANT!
DO NOT tighten bolts until the end of step 5.
pArtS
Platform Step H
(3) Bolt Z
(3) Nut AA
(6) Washer HH
STEP 4A
D
C
A
B
STEP 4A
SLIDE Q
STAIR V
H
F1
32”
32”
32”

STEP 5A Attach Platform F2 to Step H
Have 2 people hold the second Platform F up to Platform
Step H while the third person attaches the two pieces with
(3) Bolts Z, (6) Washers HH, and (3) Nuts AA (Order: bolt,
washer, platform/step, washer, nut) – Do not Tighten bolts
until the end of this step.
STEP 5B – Attach poles E1 and E2 to Platform F2
While one person remains holding the platform have the
other two people grab Poles E1** and E2**. Attach Pole E1
on the open corner of the second Platform F that is on the
same side as Pole C, using (1) Bolt Z, (2) Washers HH and (1)
Nut AA (Order: bolt, washer, platform/ring, washer, nut).
Attach Pole E2 on the open corner that is on the same side
as Pole D with (1) Bolt Z, (2) Washers HH and (1) Nut AA
(Order: bolt, washer, platform/ring, washer, nut).
IMPORTANT!
Tighten the bolts from Steps 4 and 5 before moving on to
step 6
pArtS
Second Platform F
(2) Pole E
(5) Bolt Z
(5) Nut AA
(10) Washer HH
**at this point the poles are the same. It does not matter which pole you attach in which spot. Once they are attached though,
we will reference Pole E1 and E2 appropriately to address the correct side of the structure.
STEP 5B
STEP 5A
D
C
A
BSTEP 5A
STEP 5B
SLIDE Q
STAIR V
F2
F1
H
32”
32”
32”
44”
32”
32”
StEp 5 – Attach Platform F2 to Platform F1
E1
E2
F2
STEP H

StEp 6 – Attach Railing J to Platform F1
STEP 6A Attach Ring Clamps to Railing J
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to one of the top sides of Railing J using (2) Ring
Bolts W and (2) Ring Nuts X. Repeat for the other side of
Railing J with (1) Ring Attachment Clamp Top EE and (1)
Bottom DD, (2) Ring Bolts W and (2) Ring Nuts X.
STEP 6B – Attach Railing J to Platform F1
Place Railing J between Poles A and B and fasten Clamp
pieces EE and DD to the Attachment Rings at 75” from the
ground on Pole A and Pole B. Attach bottom of Railing J to
Platform F using (2) Bolts Y, (4) Washers HH, and (2) Nuts
AA (Order: Bolt, washer, platform/ring, washer, nut).
IMPORTANT!
Tighten all bolts in this step before moving on to step 7
pArtS
Railing J
(2) Ring Clamp EE & DD
(4) Bolt W
(4) Nut X
(2) Bolt Y
(2) Nut AA
(4) Washer HH
STEP 6B
STEP 6A
B
D
C
A
STEP 6A
STEP 6B
J
STAIR V
F1
32”
32”
32”
75”
75”

CLIMBING POLE
StEp 7 – Attach Spinning Bead Wall to Platform F2
STEP 7A Attach Ring Clamps to Spinning Bead Wall
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to one end of the top of Spinning Bead Wall P1
using (2) Ring Bolts W and (2) Ring Nuts X. Repeat for other
top side of Wall P1.
STEP 7B – Attach Spinning Bead Wall to Platform F2
Fasten the clamps on the top of Wall P1 to Attachment Rings
on Poles C and E1 that are 86.5” from the ground. Insert
(3) Bolts Z, (3) Washer HH through Second Platform F from
underneath into Pre-readed Posts of Wall P1. Tighten all
Bolts in this step.
IMPORTANT!
Tighten all bolts in this step
before moving on to step 8
pArtS
Spinning Bead Wall P1
(2) Ring Clamp EE & DD
(4) Bolt W
(4) Nut X
(3) Bolt Z
(3) Washer HH
STEP 7B
STEP 7A
F2
E1
D
E2
H
P
BEADWALL
STEP H / PLATFORM F1
44”
44”
44”
C
86.5”
86.5”

StEp 8 – Attach Climbing Pole to Platform F2
STEP 8A Attach Ring Clamps to Railing L
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to one end of the top of Climbing Pole Railing L
using (2) Ring Bolts W and (2) Ring Nuts X. Repeat for other
top-side of Railing L.
S
TEP 8B – Attach Railing L to Platform F2
Fasten the clamps to Attachment Rings on Poles D and E2
that are 86.5” from the ground. Use (2) Bolt Y, (4) Washer
HH and (2) Nut AA (Order: bolt, washer, railing/platform,
washer, nut) to secure Railing to Platform F2.
STEP 8C – Insert Climbing Pole T
Loosen the Allen Key Bolt on the top piece of Railing L.
Insert top of Climbing Pole T into top piece of Railing L and
re-tighten Allen Key Bolt on Railing L.
IMPORTANT!
Tighten all bolts in this step before moving on to step 9
pArtS
Climbing Pole Railing L
(2) Ring Clamp EE & DD
(4) Bolt W
(4) Nut X
(2) Bolt Y
(2) Nut AA
(4) Washer HH,
Climbing Pole T
Allen Key J
E2
D
STEP 8B
STEP 8B
STEP 8B
STEP 8C
F2 T
L
STEP H / PLATFORM F1
BEAD WALL
44”
44”
86.5”
86.5”

StEp 9 – Attach Buttery Wall to Platform F2
STEP 9A Attach Ring Clamps to Buttery Wall
Loosely, fasten (1) Ring Attachment Clamp Top EE and (1)
Bottom DD to one end of the top of Buttery Wall P2 using
(2) Ring Bolts W and (2) Ring Nuts X. Repeat for other top
side of Buttery Wall P2.
STEP 9B – Attach Spinning Bead Wall to Platform F2
Fasten the clamps on the top of Wall P2 to Attachment Rings
on Poles E1 and E2 that are 86.5” from the ground. Insert
(3) Bolts Z, (3) Washer HH through Second Platform F from
underneath into Pre-readed Posts of Buttery Wall P2.
Tighten all Bolts in this step.
IMPORTANT!
Tighten all bolts in this step
before moving on to step 8
pArtS
Spinning Bead Wall P2
(2) Ring Clamp EE & DD
(4) Bolt W
(4) Nut X
(3) Bolt Z
(3) Washer HH
STEP 9B
STEP 9A
F2
E2
C
D
H
P
BEADWALL
44”
44”
44”
E1
86.5”
86.5”

StEp 10 – Attach Roof to Platform F1
STEP 10A Centre Roof and Attach to Platform F1
Place Roof U on top of Posts A, B, C, D. Once centered and
in place, secure Roof U by inserting (1) Long Self Tapping
Screw GG and (2) Short Self Tapping Screws FF at each post,
through the brackets on the tops of Posts A, B, C, and D and
into the Plastic Roof.
IMPORTANT!
If people assembling roof are not tall enough, YOU WILL
REQUIRE YOUR LADDER.
You may not use all the self-tapping screws provided.
pArtS
Roof U
(4)Self Tapping Screws GG
(8)Self Tapping Screws FF
STEP 10A
STEP 10A
View from below
D
C
A
U
STEP 12A
Popular Play Set & Playground Equipment manuals by other brands

Creative Cedar Designs
Creative Cedar Designs 7120 Assembly instructions

Kogan
Kogan KIDS CLIMBER AND SLIDE BASKETBALL ACTIVITY... user guide

GALOPIN
GALOPIN CDE33 instruction manual

Rompa
Rompa 18292 user guide

Community Playthings
Community Playthings Nursery gym user manual

TTS
TTS EY01212 quick start guide