VISAGE SCREEN SYSTEM (ASSEMBLED)
OPERATIONAL/FIXING INSTRUCTION LEAFLET
TM
OPENING AND CLOSING FOUR SIDED SCREEN COMPLETE WITH DOOR:
Insert Glasdon Key into lock and
turn anticlockwise to unlock the
door. (Alternatively: Turn twist
lock anticlockwise to unlock
door.)
Using handle pull door open
to 90 degree position.
To ensure that the door remains
open whilst removing the
wheeled bin, turn the door stay
catch clockwise so that it is
positioned horizontally.
Remove wheeled bin. Close the door and insert key into
lock. Turn key clockwise to lock
door. (Alternatively: Turn twist lock
clockwise to lock door.)
P. 1
1 2 3
45 6
After replacing the wheeled bin,
remove the door stay catch by
pushing upwards anticlockwise so
that is positioned vertically.
NOTE: Ensure that all relevant personnel read the points listed below and that a copy is passed on to staff involved
with the installation. Please also refer to the ‘Manual Handling Operations Regulations 1992’ during the
handling of the product and materials used for installation.
Total weight of the screens are: Two Sided 770 - 40kg Three Sided 770 - 53kg Four Sided 770 - 80kg
Two Sided 1280 - 46kg Three Sided 1280 - 65kg Four Sided 1280 - 92kg
NOTE: To allow the wheeled bin to sit inside the screen in the correct position, it is recommended that
the lid of the wheeled bin remains attached and is simply folded over the back of the bin when in use.
For best results please ensure that the front of the wheeled bin is level with the front two extrusions.
REMOVING SCREEN FROM PALLET:
To remove the screen from the pallet rst make sure that it is in the area where it is to be ground xed (will
be dicult to manoeuvre when o the pallet). Open the door if necessary (see Figs1-3) and using a hand
drill remove screws and washers at the base of each extrusion. Close and lock the door if necessary (Figs 5-6)
then slide or lift the screen from the pallet (will require 2-3 people for assistance).

ADJUSTMENT AND GROUND FIXING:
KIT CONTENTS:
ITEM A M10 x 120mm Ground Fixing Bolt x5 (2 Sided)
x6 (3 or 4 Sided)
ITEM B Support Leg x2
Step 1: Adjustment of Spigot Legs When Sited on Uneven Ground
(If not required move on to Step 2)
7
Using a 13mm spanner/socket
unscrew the two bolts with
washers on the inside at the
bottom of the extrusions and
remove.
Lift the extrusion upwards and
pull the spigot leg down to a
more appropriate height ensuring
that the screen is now level.
Replace the bolts and washers
into the new holes within the
spigot leg and tighten with
spanner/socket. Repeat Figs 7 -
9 on the other legs that need
adjusting.
8 9
Step 2: Ground Fixing (Concrete In)
10 11 12
Using a 10mm masonry drill bit,
drill through the hole in the spigot
leg down into the concrete
approximately 150mm deep.
Tighten bolt using 17mm
spanner. Repeat Figs 10 - 12 to
ground x the other extrusions.
P. 2
TOOLS REQUIRED:
13mm Spanner x1
17mm Spanner x2
Hand Drill with Pozi Drill Bit x1
10mm x 150mm Masonry Drill Bit x1
Hammer x1
6mm Allen Key x1
The xing bolts (A) MUST appear as
above with the nut and washer at
the top of the bolt. Using a hammer,
tap xing bolt through the hole in
the spigot leg until it is ush with the
spigot plate.
We recommend that a risk assessment is undertaken to identify an appropriate location for your waste
collection and recycling units. In order to reduce risk, some organisations decide to place the units a
minimum of 5 metres away from buildings. Any potential risk can be further reduced by maintaining a
regime of regularly emptying the unit.

Using a 13mm spanner/socket unscrew the two bolts with washers at the bottom of the outermost
extrusions and remove. (see diagrams above showing location of support legs for all screen types) If the
spigot legs have been adjusted (Step 1) the panels will need to remain lifted in position so that the support
legs go into the correct holes. (may require two people.)
Place the support leg (B) up
against the inside of the extrusion
so that the leg protrudes outwards
and stands on the ground. If the
spigot legs have been adjusted
there are several pre-drilled holes
in the support leg to
accommodate this adjustment.
Replace the bolts and washers
into the new holes through the
support leg, extrusion and into
the spigot leg. Tighten with
13mm spanner/socket.
Concrete x the support legs into
the ground as per Fig 10, 11 and
12 (Step 2).
Step 3: Attaching and Ground Fixing Compulsory Support Legs
13
14 15 16
P. 3
Two Sided Three Sided Four Sided c/w Door

25
Lift the wheel support bar o the
bolts, ensuring that the door is
still supported.
24
Using 17mm spanner remove the
second nut and washer. Repeat
on other wheel support bar xing
point.
23
20
Lift door panel and pull wheel
down so that the axle drops down
the slot in the wheel support bar
(may require two people.)
Once in correct position, tighten
up nut (left of wheel) to lock the
axle in place.
Tighten up nyloc nut (right of
wheel) ensuring that wheel can
still rotate freely but is secure on
the axle.
21 22
Step 5: Further Adjustment of Door Wheel (If Required)
P. 4
Step 4: Adjustment of Door Wheel on Four Sided Screen c/w Door (If Required)
17 18
If the door is not level, as seen
above, the door wheel can be
adjusted.
Using 17mm spanner, loosen
nyloc nut on right hand side of
wheel.
Using 17mm spanner and 6mm allen
key, loosen nut on left side of the
wheel to free the axle from the wheel
support bar.
19
Using 17mm spanner, hold the nut
closest to the wheel support bar.
Using a second spanner unscrew
the outermost nut and remove.
Repeat on other wheel support bar
xing point.
IMPORTANT NOTE: The door wheel must be positioned so that it is touching the ground when the door
is CLOSED. The main purpose of the door wheel is to support the large door when in the closed position.

AND MODUS ARE TRADEMARKS OF GLASDON GROUP AND ITS SUBSIDIARIES IN
THE U.K. AND OTHER COUNTRIES.
Replacement components are available direct from GLASDON.
GLASDON cannot be held responsible for claims arising from incorrect installation, unauthorised modifications or misuse of
the product.
Issue 2 December 2011 C000/0404
© Copyright 2011
Glasdon U.K. Ltd reserves the right to alter specifications without prior notice. Preston New Road
BLACKPOOL
Lancashire FY4 4UL
Tel: 01253 600410
Fax: 01253 792558
E-mail: [email protected]
Web: www.glasdon.com
TM
P. 5
26 27 28
Replace the wheel support bar
over the bolts using the
alternative holes to make the
adjustment of the door height.
Making sure that the wheel
support bar is 90 degrees to the
door, replace the washer and rst
nut onto the bolt and tighten (do
NOT overtighten).
Holding the nut with the 17mm
spanner, place the second nut
over the bolt and tighten securely
with a second spanner. Repeat
gs 27 and 28 using other xings.
Step 5: Further Adjustment of Door Wheel (continued)
This manual suits for next models