RECOMMENDED TOOLS: Tape measure, Level, Pencil, Electrical drill, Stud finder, Hammer, and Clamps
PACKAGE CONTENTS
2 Floor-To-Ceiling frames (Top + Bottom)
Screws
INSTALLATION STEPS
IMPORTANT: When securing the FTC to a location, use the appropriate
mounting fasteners. There are 4 fastener locations on the top and
bottom brackets.
STEP 1: MARK SCREW HOLES
Mark the screw holes for the mounting brackets in the desired mounting
location.
STEP 2: MEASURE CEILING HEIGHT
Measure the ceiling height in the location you will mount the frame.
STEP 3: MAKE CALCULATIONS
Calculate the height of your ceiling, then subtract the height of the top
frame to give you the measurements for your bottom rail.
STEP 4: MARK BOTTOM FRAME
Mark the bottom frame to determine the cut location.
STEP 5: CUT FRAME
Cut the frame in marked location using a metal-cutting hack saw.
Note: Do not use a metal cut off wheel as the heat will damage the
product.
STEP 6: CONNECT THE TOP AND BOTTOM FRAMES
Drill holes on the bottom frame, and then use the hardwares to connect
the TOP and BOTTOM frames. Ensure that the holes for the TOP and
BOTTOM frames are lined up in the desired location.
PRO TIP: Pre-drill holes before installing the Floor-to-Ceiling mount.
STEP 7: MOUNT BRACKETS
Mount the brackets to the ceiling then the floor using the appropriate
anchors. Do not over-tighten.
STEP 8: MOUNT RAILS
Mount rails to frame. Use all mounting holes to fasten rails securely.
PRO TIP: Use clamps to hold rails in place while mounting.