Lefroy Brooks Y1-1022 User manual

INSTALLATION INSTRUCTIONS
Y1-1022
HAND SHOWER WITH DECK HOLSTER TRIM ONLY, TO SUIT R1-4026

2
What you need to know
Adjustable Wrench
Groove Joint Pliers
Hacksaw
Phillips Screwdriver
Pipe Tape
Spatula
Spirit Level
Your new bathroom faucet is designed for years
of trouble-free performance.
Keep it looking new by cleaning it periodically with
a soft cloth. Avoid abrasive cleaners, wire wool and
harsh chemicals as these will dull the finish and
void your warranty.
If you are soldering during faucet installation,
remove cartridges, seats, gaskets and washers
prior to applying flame, otherwise you will void
the warranty.
Cover drain openings to avoid losing small parts.
When cutting or soldering pipe, use safety glasses
to protect your eyes.
Correct installation may vary depending on previous faucet installation. All necessary supplies required for
faucet installation are not included, but may be found where plumbing supplies are sold. It is suggested that
IAPMO and/or CSA approved plumbing supplies are used during installation.
Prior to beginning installation. turn off the cold and
hot water lines and open the old faucet to release
built-up pressure.
Overtightening nuts may cause damage.
Wrap all threaded connections with pipe tape
available at your local plumbing supply store.
Always wrap in a clockwise direction. The fittings
should be installed by a state-licenced plumber.
Tools: Maintenance
Safety Tips
Things You May Need
Important Points
Standards
IAPMO/cUPC Listed
Meets A112.18.1
Flow Rate
Please note :
Final achievable flow rate is dependent on the outlets fitted, see relevant outlets (spouts, roses, sprays) for fully
assembled product flow rate.
0
1
2
20 40 60 80PSI

3
Steps 1-2
Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
Please note:
When there is a difference in water pressure between hot and cold supplies to the mixing valve, the pressures
should by equalized by a plumber in accordance with best practice and legislation.
This product requires the installation of certified atmospheric vacuum breaker (AVB) installed in-between the
shut off valve and hose inlet. The AVB should be installed so its vent ports are not pointing in an upward
direction. Should you be unfamiliar with an AVB, we recommended consulting a plumbing professional.
valve AVB HOSE
1
2
Make sure that main water supply is shut off
before further installation. Take off rubber
protective cap and plug from valves, as well
as the underneath protective bubble bags.
Install escutcheon and hand shower.
12
2
1
3
Ø1 1/4"
(Ø32mm)
Ø2 3/8"
(Ø60mm)
1/2-14NPSM-2A
3/16"
(5mm)
8 13/16"
(224mm)
1 O-ring (004640N)
2 Escutcheon (071390)
3 Handshower (S2111104)

For additional assistance or service call
718-302-5292
9am to 5pm EST Monday to Friday
LEFROY BROOKS INC, 1828 TROUTMAN STREET, RIDGEWOOD, NY, 11385
TELEPHONE: 718-302-5292. FAX: 718-302-4177
The use of trademarks, product design and artwork is subject to licence or agreement with LBIP Ltd. The design
registrations, trademark registrations and copyrights are protected by law and the use or reproduction outside the terms of an agreement is prohibited.
The right to modify designs and dimensions is reserved. Christo Lefroy Brooks is a member of ACID (Anti Copying in Design).
© LBIP LTD 2012
www.lefroybrooks.com
Table of contents