Pre-tie 1 long guy rope around the top spike on all 5 metal poles. Pre-tie a shorter guy
rope around each metal ring on the outside of the centre hub.
With 2 people; stand the windbreak upright and manoeuvre into position.
Starting from one end; peg down each pegging loop at the base of each steel pole. Use
the 2 guy ropes to hold the panel in place ensuring the windbreak is vertical:
Repeat for all 4 panels.
It is recommended each peg is fully driven into the ground at an angle of 45 degrees
away from the pegging point. Tension each guy rope using the guy adjusters: