
2
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION..............................3
REQUIREMENTS & CODES ..............................................3
Combustion Air Quality ....................................................4
Heating Load....................................................................5
Installation in a Garage....................................................5
Clearances to Combustible Materials ..............................5
Operation of Furnace During Construction ......................5
COMBUSTION AIR & VENTING REQUIREMENTS ..........6
Direct Vent Systems ........................................................7
Conventional Vent Systems - Confined Spaces ..............7
Air From Inside..............................................................7
Outdoor Air from a Crawl Space or Vented Attic...........7
Outdoor Air Using Vertical Ducts ..................................8
Outdoor Air Using Horizontal Ducts ..............................8
Air Directly Through an Exterior Wall ............................8
Alternate Method of Providing Air from Outside:...........8
Conventional Vent Systems - Unconfined Spaces ..........9
Category IV Venting.........................................................9
Vent Pipe Material.........................................................9
Vent Pipe Length & Diameter........................................10
Vent Pipe Installation ....................................................10
Outdoor Terminations - Horizontal Venting...................11
Outdoor Terminations - Vertical Venting .......................11
Vent Freezing Protection...............................................11
Existing Installations......................................................12
Condensate Disposal.......................................................12
CIRCULATING AIR REQUIREMENTS...............................12
Plenums & Air Ducts........................................................12
Return Air Connections....................................................13
Upflow & Horizontal Furnaces.......................................13
Supply Air Connections....................................................13
Acoustical Treatments .....................................................13
FURNACE INSTALLATION................................................14
General Requirements.....................................................14
Upflow Furnaces..............................................................14
Horizontal Furnaces.........................................................14
Inducer & Venting Options...............................................15
Inducer Assembly Rotation ...........................................15
Pressure Switch Tubing ................................................15
Accessories......................................................................16
Finish Flange.................................................................16
Rubber Grommets.........................................................16
PVC Components .........................................................16
Typical Orientation.................................................16
Alternate Orientation..............................................17
Condensate Drain Lines................................................17
Bottom Panel Removal ....................................................17
Alternate Bottom Panel Removal..................................17
GAS SUPPLY & PIPING.....................................................18
Leak Check......................................................................19
High Altitude Application (Natural Gas Only) ...................19
Converting from Natural Gas to LP / Propane .................20
ELECTRICAL WIRING .......................................................21
Line Voltage Wiring..........................................................21
Grounding ........................................................................22
Thermostat / Low Voltage Connections...........................22
Single Stage AC & Single Stage Thermostat................22
Single Stage AC & Two Stage Thermostat...................22
Two-Stage AC & Two-Stage Thermostat......................22
Autostaging for Single Stage Thermostats ......................23
Autostaging for Two-Stage Thermostats .........................23
Blower Speed Configuration ............................................23
Fixed Speed Blower Applications..................................23
Variable Speed Blower Applications .............................23
Dehumidification Options.................................................23
Heat Anticipator ...............................................................23
START-UP & ADJUSTMENTS...........................................24
Pre-Start Check List.........................................................24
Start-up Procedures.........................................................24
Verifying & Adjusting Input Rate ......................................24
Verifying & Adjusting Temperature Rise ..........................24
Verifying Burner Operation ..............................................25
Verifying Operation of the Supply Air Limit Switch...........25
OPERATING SEQUENCE..................................................25
Heating Cycle...................................................................25
Cooling Cycle...................................................................26
Fan Mode.........................................................................26
MAINTENANCE..................................................................26
FIGURES & TABLES..........................................................27
Figure 26. *TC Cabinet Dimensions..............................27
Gas Information ...............................................................28
Table 5. Gas Flow Rates...............................................28
Table 6. Gas Pipe Capacities........................................28
Table 7. High Altitude Deration - Propane Gas.............29
Table 8. Natural Gas Heating Values............................29
Table 9. High Altitude Deration - Natural Gas with
HIGH Heating Value........................................30
Table 10. High Altitude Deration - Natural Gas with
LOW Heating Value ......................................30
Electrical Information .......................................................31
Figure 27. Two-Stage Fixed Speed Motor Control
Board ...........................................................31
Figure 28. Two-Stage Variable Speed Motor Control
Board ...........................................................31
Figure 29. Two-Stage Furnace Control Board ..............31
Figure 30. Wiring Diagram for Two-Stage, Fixed
Speed Upflow Furnaces...............................32
Figure 31. Wiring Diagram for Two-Stage, Variable
Speed Upflow Furnaces...............................33
Venting Information..........................................................34
Table 11. Vent Termination Clearances........................34
Figure 32. Horizontal & Vertical Venting
(A Width Cabinets).......................................35
Figure 33. Horizontal & Vertical Venting
(B, C, & D Width Cabinets) ..........................36
Figure 34. Upflow Venting Options
(A Width Cabinets).......................................37
Figure 35. Upflow Venting Options
(B, C, & D Width Cabinets) ..........................38
Figure 36. Horizontal Venting Options
(A Width Cabinets).......................................39
Figure 37. Horizontal Venting Options
(B, C, & D Width Cabinets) ..........................40
TROUBLESHOOTING........................................................41
Table 12. Furnace Control Board Fault Conditions.......41
Table 13. Motor Control Board Fault Conditions...........41
FURNACE COMPONENTS ................................................41
Figure 38. Component Locations..................................42
INSTALLATION CHECKLIST.............................................44