WATER REGULATION REQUIREMENTS
It is important to ensure that the water supplies to your taps and mixers are connected
in accordance with the water
regulations (WRAS) requirements and good plumbing practice.
It is Pegler’s recommendation and good plumbing practice that the supplies of hot and
cold water to the bath mixer
should be at equal (balanced) pressures in order to provide a consistent flow. Supplies
should be from a common
source, either mains or tank fed. If supplies are not equal pressures then non return
valves should be fitted.
OPERATING PRESSURES
0.1 bar to 1.0 bar - inlet supply pressures do not have to be balanced as this is a
dualflow fitting. At higher pressure it may be necessary to reduce excessive flow rates
and splashing by the fitting of a pressure reducing valve in the supply line or stop /
servicing valves directly before the mixer tap. These stop valves also facilitate ease of
maintenance should it be necessary
Pre-installation Checks:
1. Ensure that there is sufficient space to install the product without it hampering its
operation. Ensure that when fitting the basin / bath product that the product will not
foul on the overflow. When fitting in a corner position make sure there is sufficient
clearance for the use of the handles.
2. Ensure that the outlet will protrude sufficiently into the basin / bath and will clear any
obstructions.
3. When installing the product the hot inlet should be on the left hand side and the
cold on the right hand side when viewed from the front.
INSTALLATION
Monobloc Sink Mixers
1. Screw inlet flexible tails into body and tighten up ensuring ‘O’ ring seal is firmly in
place and leak proof, securing stud to be loosely tightened.
2. Locate seal under flange (or base of monobloc).
3. Place fittings through hole in ware. Place washer over inlet tails and position on
underside of ware. Place clamping plate on threaded stud/s ensuring that stud is
positioned in the slot in the clamping plate and that the inlet tails are positioned in the
cut out. Place fixing nut onto threaded stud and tighten firmly onto base of ware /
worktop.
4. Ensure pipework is thoroughly flushed to remove debris before connecting to water
supplies.
5150
a = 50
b =1/2”
c = 99
d = 99
e = 148
5525
a = 190
b =150
5521
a = 178
b =1/2”
c = 138
d = 190
5522
a = 168
b =1/2”
c = 130
d = 168
5526
a = 168
b =147
AA