Pila CS User manual

Installation Guide Page 1
For more information visit pila.com.au or phone 1300 00 PILA (1300 007 452).
This product must be periodically maintained for user safety & failure to do so may void the warranty. All joints & bolts must
be checked & tightened on a regular basis. Missing or broken parts must be immediately replaced with genuine PILA parts.
PILA © 2019. Registered Trademark. ABN 32 114 687 820. 99A South Creek Rd, Cromer NSW 2099.
DISCLAIMER: The information contained in this document is general advice only & is not engineer’s advice or engineer’s certification. PILA does not
warrant the accuracy of this information & will not be held liable for its content or outcomes. It is the user’s responsibility to check this information is
suitable for their needs & to seek advice from an engineer prior to installation, if required.
PRODUCT CODE: CS
PRODUCT NAME: Senior Soccer / Rugby Combination Goal Post
PARTS LIST –GOAL POST
SOCCER GOAL POSTS –PAIR OF 2
Crossbar & Joiner & Elbows
Aluminium Oval Tube - 120/100mm x 3700mm
4
Upright
Aluminium Oval Tube - 120/100mm x 2400mm
4
Ground Sleeve
Aluminium Oval Tube - 120/100mm x 450mm
4
Off Season Cap
Aluminium Extruded Tube - 81mm x 50mm
4
Security Screw
Stainless Security Screw - M6 x 25mm
4
Joining Bolt & Barrel Nut
Stainless Counter Sunk Screw - M8 x 90mm
12
Assembly Key
Allen Key - 5mm
2
Assembly Key
T40 Key
2
Assembly Key
T30 Key
2
RUGBY ATTACHMENT –PAIR OF 2
Crossbar
Aluminium Straight Tube - 80mm x 5530mm
2
Upright
Aluminium Straight Tube - 80mm x 3000mm
4
Soccer Crossbar & Rugby Upright Bracket
Steel Rugby Bracket - 110mm With Slot
4
Rugby Crossbar & Rugby Upright Bracket
Steel Rugby Bracket - 80mm
4
Bracket Bolt, Nut & Washers –110mm
Galvanised Bolt & Nut - M12 x 160mm
4
Bracket Bolt, Nut & Washers –110mm
Galvanised Bolt & Nut - M10 x 120mm
4
Bracket Bolt, Nut & Washers –110mm / 80mm
Galvanised Bolt & Nut - M10 x 110mm
12

Installation Guide Page 2
For more information visit pila.com.au or phone 1300 00 PILA (1300 007 452).
This product must be periodically maintained for user safety & failure to do so may void the warranty. All joints & bolts must
be checked & tightened on a regular basis. Missing or broken parts must be immediately replaced with genuine PILA parts.
PILA © 2019. Registered Trademark. ABN 32 114 687 820. 99A South Creek Rd, Cromer NSW 2099.
DISCLAIMER: The information contained in this document is general advice only & is not engineer’s advice or engineer’s certification. PILA does not
warrant the accuracy of this information & will not be held liable for its content or outcomes. It is the user’s responsibility to check this information is
suitable for their needs & to seek advice from an engineer prior to installation, if required.
PARTS LIST –OPTIONAL ACCESSORIES
OPTIONAL HINGED BASE FRAME –PAIR OF 2
Rear Base Frame
Aluminium Box Section - 61mm x 3680mm
4
Side Base Frame
Aluminium Box Section - 61mm x 2060mm
4
Rear Base Frame Joiner
Aluminium Box Section - 45mm x 1000mm
2
Joining Plate
Aluminium Corner Base Plate
4
Frame End Cap
Plastic Box Section - End Cap
4
Hinge
Stainless Steel Hinge - 154mm x 26mm
4
Hinge Bolt
Stainless Counter Sunk Screw - M8 x 20mm
16
Fixing Bolt, Nut & Washers
Stainless Hex Head Bolt - M8 x 16mm & 26mm Nut
40
Ground Peg
Galvanised Anchor Peg - 350mm
20
OPTIONAL BOX NET SUPPORTS –SET OF 4
Net Support Post
Aluminium Straight Tube - 62mm x 3000mm
4
Ground Sleeve
PVC Pipe - 65mm x 300mm & Base Cap
4
Off Season Cap
PVC Top Cap - 65mm
4
Rope Net Ties
Marine Rope - 5mm
14
OPTIONAL TRIANGLE NET SUPPORTS –SET OF 4
D Shape Support
Aluminium Triangle Net Support
4
Brace Bar to Suit D
Aluminium Triangle Net Support Brace Bar
4
Fixing Bolt, Nut & Washers
Stainless Hex Head Bolt - M8 x 16mm & 26mm Nut
12
Fixing Bolt, Nut & Washers
Galvanised Bolt - M8 x 60mm
4

Installation Guide Page 3
For more information visit pila.com.au or phone 1300 00 PILA (1300 007 452).
This product must be periodically maintained for user safety & failure to do so may void the warranty. All joints & bolts must
be checked & tightened on a regular basis. Missing or broken parts must be immediately replaced with genuine PILA parts.
PILA © 2019. Registered Trademark. ABN 32 114 687 820. 99A South Creek Rd, Cromer NSW 2099.
DISCLAIMER: The information contained in this document is general advice only & is not engineer’s advice or engineer’s certification. PILA does not
warrant the accuracy of this information & will not be held liable for its content or outcomes. It is the user’s responsibility to check this information is
suitable for their needs & to seek advice from an engineer prior to installation, if required.
SOCCER FOOTING ASSEMBLY
Measure 7420mm hole centres for uprights.
Dig 900mm deep x 350mm diameter footing holes. Keep diameter of hole even to avoid a bowl shape at bottom.
Fill with 25MPA semi-wet concrete 35mm below ground level.
Sink sleeve into concrete with end marked at base. Sleeve centres are to match post hole centres (step 1).
Top of sleeve is 25mm above concrete & 10mm below ground. Do not sink sleeve below top of concrete level.
Distance between inside edge of each ground sleeve is exactly 7320mm to provide correct crossbar distance.
Level using a spirit level against inside of sleeve. Ensure sleeve is properly levelled before concrete sets.
Carefully fit top cap & leave to cure for a minimum of 48hrs.
Remove cap, stand post in sleeve & secure with security screw.
SOCCER GOAL FRAME ASSEMBLY
Lay goal frame in shape on ground & match numbered sections together.
Connect crossbar in centre with joining bolts & tighten with allen keys.
Connect uprights to crossbar with joining bolts & tighten with allen keys.
Raise goal frame and stand into ground sleeves (unless net supports are to be fitted –see below).
If using net clips, space 26 clips along crossbar & 11 clips down each upright.
RUGBY ATTACHMENT ASSEMBLY
Connect 110mm Rugby Brackets to top of Soccer Crossbar using M12 x 160mm Bracket Bolts with Washers
Connect Rugby Upright into top of Bracket & secure with M10 x 120mm (bottom) & M10 x 110mm (top) Bracket Bolts with Washers.
Connect 80mm Rugby Brackets to Rugby Uprights & Rugby Crossbar using M10 x 110mm Bracket Bolts with Washers.
To attach the Crossbar to the Uprights, have one person on a step ladder at each side of the goal post & raise simultaneously.
Leave a gap of approximately 450mm from top of Soccer Crossbar to underside of Rugby Crossbar.
Level all Brackets & set the height of Rugby Crossbar at 3000mm from ground to top of Crossbar.

Installation Guide Page 4
For more information visit pila.com.au or phone 1300 00 PILA (1300 007 452).
This product must be periodically maintained for user safety & failure to do so may void the warranty. All joints & bolts must
be checked & tightened on a regular basis. Missing or broken parts must be immediately replaced with genuine PILA parts.
PILA © 2019. Registered Trademark. ABN 32 114 687 820. 99A South Creek Rd, Cromer NSW 2099.
DISCLAIMER: The information contained in this document is general advice only & is not engineer’s advice or engineer’s certification. PILA does not
warrant the accuracy of this information & will not be held liable for its content or outcomes. It is the user’s responsibility to check this information is
suitable for their needs & to seek advice from an engineer prior to installation, if required.
OPTIONAL HINGED BASE FRAME ASSEMBLY
Connect the 3680mm Rear Base Frame sections using the Rear Base Frame Joiner.
Loosen the 4 x 26mm Fixing Nuts on Rear Base Frame sections & pull out Joiner to black line. This is the centre point.
Connect 2 x 16mm Stainless Fixing Bolts through Rear Base Frame & tighten firmly. Slide Rear Base Frame over Joiner & tighten.
Insert 4 x 26mm Fixing Nuts with 2 positioned at each end of the Rear Base Frame for the Joining Plate.
Insert 2 x 26mm Fixing Nuts at the rear end of each Side Base Frame section.
Connect the Rear Base Frame to the Side Base Frames using the Joining Plate, 26mm Fixing Nuts & 16mm Stainless Fixing Bolts.
The Rear Base Frame will sit on the inside of the Side Base Frames. Fit Frame End Caps to open ends of base frames.
Connect Hinge to Uprights using 2 x 26mm Fixing Nuts in net track. Tighten with 2 x 20mm Stainless Fixing Bolts with Washers.
Connect assembled Hinged Base Frame to Hinge on Uprights using 2 x 20mm Stainless Fixing Bolts with Washers.
OPTIONAL BOX NET SUPPORTS
Footing holes are 3m behind goal line & 1m to outside of Uprights, so ropes pull on a diagonal from corner of goal.
Dig 650mm deep x 300mm diameter footing holes. Keep diameter of hole even to avoid a bowl shape at bottom.
Fill with 20MPA semi-wet concrete 35mm below ground level.
Sink sleeve into concrete with end marked at base. Sleeve centres are to match post hole centres (step 1).
Top of sleeve is 25mm above concrete & 10mm below ground. Do not sink sleeve below top of concrete level.
Tilt sleeves back on an angle of 10-15 degrees so posts are not vertical. This assists with net tensioning.
Angle sleeves slightly away from goals (to the left & right). This assists net to form a box shape.
Put Net Support Post into Ground Sleeve to get the angle correct before the concrete sets & adjust angle if required.
Carefully fit top cap & leave to cure for a minimum of 48hrs.
Remove cap, stand post in sleeve & secure with security screw.
OPTIONAL TRIANGLE NET SUPPORTS
Slide 2 x 26mm Fixing Nuts up net track on Uprights to top of each post.
Position 1st Fixing Nut above elbow join & 2nd Fixing Nut will marry up with base of Net Support.
Fasten Net Supports to Uprights using 16mm Stainless Fixing Bolts through Fixing Nuts in net track.
Connect Brace Bar to top of Net Support with 60mm Galvanised Fixing Bolt & to top of Crossbar with factory-fitted 26mm Fixing Nuts.
Other Pila Sport & Outdoor manuals
Popular Sport & Outdoor manuals by other brands

Hudora
Hudora 76909 INSTRUCTIONS ON ASSEMBLY AND USE

Hudora
Hudora 12828 INSTRUCTIONS ON ASSEMBLY AND USE

SPORT-TRANSFER
SPORT-TRANSFER 15 903 Instructions for assembly and use

Crane
Crane FLX-PUB-01 user manual

Premier Equestrian
Premier Equestrian Classic Arena Post Anchor System Setup instructions

North
North EXPLORER LOW Series Assembly manual