Pipeline P-DR1W-48 User manual

OWNER’S MANUAL
P-DR1W-48 | P-DR1W-60
SHOWER ENCLOSURES
P001
IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE
SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS.
06.10
2 PEOPLE REQUIRED

2
PANNEAU FIXE /FIXED PANEL
1
PARTS LISTING ........................................................ 3
PROVIDED HARDWARE ............................................... 4
GLASS PANEL DIMENSIONS .......................................... 4
REQUIRED TOOLS AND MATERIALS ................................. 4
GASKET INSTALLATION............................................... 5
RUNNING RAIL. ....................................................... 6
GLASS HOLDERS ...................................................... 7
GLASS CLIPS........................................................... 7
FIXED PANEL PLACEMENT ........................................... 8
FIXED PANEL PLACEMENT (CONTINUED) .......................... 9
THRESHOLD ........................................................... 9
WALL BRACKETS ..................................................... 10
SLIDING DOOR ....................................................... 11
SLIDING DOOR (CONTINUED) ...................................... 12
STRAIGHT HANDLE .................................................. 12
GASKETS INSTALLATION.............................................13
STOPPERS............................................................. 14
SILICONE.............................................................. 14
-Read this manual carefully and completely before
proceeding.
-tcudorP are subject to change without no-
tice. Use the installation instructions supplied with the
product.
● WATERPROOFING
-No sealant is required inside the shower.
-All models are equipped with transparent sealing gaskets.
-For models with wall jambs, if your shower door is to be
installed over ceramic tiles, the tiles should lay completely
under the wall jambs.
● MAINTENANCE
-Never use scouring powder pads or sharp instruments on
metal pieces or glass panels.
-An occasional wiping down with a mild soap diluted in water
is all that is needed to keep the panels and aluminum parts
looking new.
-We recommend wiping the glass panels with a squeegee after
each use.
● SAFETY
-It is recommended that you wear safety glasses at all times
during the installation.
-At all times, 2 people are required for this installation.
TABLE OF CONTENTS
GENERAL INSTRUCTIONS

3
1PARTS LISTING
2
5
2
1
3
3
4
6
7
8
10
12
11
14
13
15
9
16
17
ITEM PARTS QTY
1RUNNING RAIL 1
2WALL BRACKET 2
3STOPPERS 2
4GLASS HOLDERS 2
5TWIN ROLLERS 2 PAIRS
6SLIDING DOOR PANEL 1
7FIXED PANEL 1
8STRAIGHT HANDLE 1
9GASKET (DOOR) 1
10 GASKET (FIXED PANEL) 1
11 BOTTOM GLASS CLIP 1
12 GASKET (GLASS CLIP) 2
13 BOTTOM GUIDE 1
14 GASKET (BOTTOM GUIDE) 1
15 THRESHOLD 1
16 DOOR PANEL SIDE GASKET 1
17 DOOR PANEL BOTTOM GASKET 1

4
TOOLS
HARDWARE
PENCIL
DRILL SILICONESCREWDRIVERS
CUTTING PLIER LEVELTAPE MEASURE
18 19 20
If the shower panels are to be assembled on ceramic tiles, use a 1/4˝drill bit for ceramic tiles.
1/4˝&1/8˝DRILL BITS
*
ITEM HARDWARE QTY
18 #12-3 SELF-THREADING SCREW 4
19 #6-1 SELF-THREADING SCREW 2
20 HEX KEY 3mm 1
21 HEX KEY 6mm (7/32˝) 1
HACKSAW
21
MALLET BLOCK

5
GASKET INSTALLATION
1
1B
1A
Place door panel (6) inside tub to simplify following
installation procedures. Ensure placing the panel
onto a cushioned surface, such as a towel or card
board, to prevent damage either to the panel or
the tub.
Using the cardboard packaging box as platform,
install bottom door gasket (17) onto door panel
(6) using a block and a mallet. Notice the gasket
orientation.
1B
Thoroughly clean the edge of the xed panel (7).
Split the door gasket (9) in two and apply the
smaller half of the gasket on the edge of the xed
panel.
7
6
17
6
1A
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
10

6
RUNNING RAIL
2
2A
2B
1
Position the stoppers (3) on the running rail (1) as
illustrated. Secure them temporarily in place.
-
Position the wall brackets (2) on the running rail (1)
as illustrated. Secure them temporarily in place.
1
3
2

7
4GLASS CLIPS
3GLASS HOLDERS
11
Ensure that the running rail (1) is at the highest pos-
sible position in reference to the holes of the xed
panel (7).
1 1/2”
(38 mm)
13
1
7
4
11
13
INTERIOR
SHOWER SIDE
11
13
Position the bottom glass clip and bottom guide
xed panel as illustrated.
4
1
WASHER
GLASS HOLE
FLUSH WITH
GLASS
Insert bottom gaskets (12) in the bottom glass
clips (11) and (13).
Fasten the running rail (1) to the xed panel (7)
with the glass holders (4).
Secure them temporarily in place.

8
5FIXED PANEL PLACEMEMENT
5B
Position the xed panel assembly (7) on thresh-
old of base (B) as shown .
Adjust the xed panel (7), by way of the running
rail (1), so as to force the gasket (10) against the
wall.
Ensure that the running rail (1) is level and that
the xed panel (7) is square. If a horizontal cor-
rection is required, adjust and level the glass
fasteners (4).
5A
1
7
1/2” max (12.7mm)
10
The bottom guide (13) can hang o the threshold
(B) as long as it can be well-fastened.
INTERIOR
SHOWER SIDE
90°
90°
90°
B
7
B
13
4
1
7
6

9
6
stekcarbllawehtrofsnoitacolwercsehtkraM
(2) on the walls on both sides of shower as well
as the placement of the bottom glass clips
(11) (13).
CONTINUED
5
THRESHOLD
5C
Remove the xed panel assembly so as to allow
placement of the threshold (15) onto the base.
Ensure that a bead of silicone (S) is applied to
the underside of the threshold before installing.
Secure glass clips (11) (13) with self-drilling
screws (19).
6A
6B
15
S
15
6A
11 13
2
19
13
6B
11
13
11 19

10
1
2
Mark the screw locations on the walls on both
sides of shower. Remove the running rail (1)
sllawniselohllirD.)2(stekcarbllawehtmorf
until wall stud is reached with a drill bit intended
for ceramic tiles.
Fasten the wall brackets (2) with #12-3 (18).
Insert xed panel (7) back, ensuring that it’s
placed in the bottom glass clips (11) (13).
Slide expander (E) over wall bracket (2) and fas-
ten set screws
7WALL BRACKETS
2
WALL STUD
2
7A
7B
18
7
2
E
11
13

11
8SLIDING DOOR
Install sliding door (6) ensuring that rollers (5)
are xed over the running rail (1).
Ensure that sliding door (6) is placed within the
bottom guide (13).
5
8A
8B
6 5
1
Assemble the 2 top rollers (5) to the door panel
(6) as illustrated.
INTERIOR
SHOWER SIDE
6
13
6

12
HANDLE
9
Install bottom rollers, making sure that they are
tangent to the running rail (1).
See sheet for installation and install the handle
as shown.
CONTINUED
8
Through the use of the nonconcentric washers,
adjust rollers so that the sliding door panel is
parallel to the running rail.
8C
Model illustrated B
GLASS HOLE
51
8
WASHER
5
WASHER

13
10 GASKETS INSTALLATION
Thoroughly clean the edge of the sliding door,
closest to the side where the handle is located.
Apply the door gasket (9) to this edge of the slid-
ing door (6).
10A
Install door side gasket (16) onto sliding door
panel (6).
10B
9
6
16
16
16 6
17
6
10A
10B
INTERIOR
SHOWER SIDE
BOTTOM
TOP

14
SILICONE
12
10
Adjust the position of the stoppers (3) so as to
ensure a maximum opening and closing range.
Ensure that the sliding door gasket (9) is forced
against the wall.
Ajuster le positionnement des butoirs (3)
an d’obtenir une ouverture ainsi qu’une
fermetureoptimale delaporte coulissante.
Assurer que le joint de rétention (9) de la
porte coulissante s’écrase contre le mur.
Apply silicone between the bottom of the xed
panel and the threshold of the base. Silicone
application along the length of the threshold is
also suggested. In both cases, it is done from
the outside of the shower area.
HOURS
STOPPERS
11
3
DOOR OPEN
DOOR CLOSED
APPROX.
3” (76.2 mm)
7
6
9
3

2 PEOPLE REQUIRED
SHOWER ENCLOSURES
P002
IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF THE
SHOWER UNIT TO SECURELY FASTEN THE RAIL TO THE WALLS.
07.08
OWNER’S MANUAL
P-DR1W-72

2
PANNEAU FIXE /FIXED PANEL
1
PARTS LISTING ........................................................ 3
GLASS PANEL DIMENSIONS .......................................... 4
PROVIDED HARDWARE ............................................... 4
REQUIRED TOOLS AND MATERIALS ................................. 4
GASKET INSTALLATION............................................... 5
RUNNING RAIL. ....................................................... 6
GLASS HOLDERS ...................................................... 7
BOTTOM GLASS CLIPS................................................ 7
FIXED PANEL PLACEMENT ........................................... 8
FIXED PANEL PLACEMENT (CONTINUED) .......................... 9
THRESHOLD ........................................................... 9
WALL BRACKETS ..................................................... 10
SMALL FIXED PANEL INSTALLATION................................11
DOOR PANEL ......................................................... 12
DOOR (CONTINUED)................................................. 13
STRAIGHT HANDLE .................................................. 13
DOOR SIDE GASKET ................................................. 14
STOPPERS............................................................. 15
SILICONE.............................................................. 15
● WATERPROOFING
-No sealant is required inside the shower.
-All models are equipped with transparent sealing gaskets.
-For models with wall jambs, if your shower door is to be
installed over ceramic tiles, the tiles should lay completely
under the wall jambs.
● MAINTENANCE
-Never use scouring powder pads or sharp instruments on
metal pieces or glass panels.
-An occasional wiping down with a mild soap diluted in water
is all that is needed to keep the panels and aluminum parts
looking new.
-We recommend wiping the glass panels with a squeegee after
each use.
● SAFETY
-It is recommended that you wear safety glasses at all times
during the installation.
-At all times, 2 people are required for this installation.
TABLE OF CONTENTS
GENERAL INSTRUCTIONS
-Read this manual carefully and completely before
proceeding.
-tcudorP are subject to change without no-
tice. Use the installation instructions supplied with the
product.

3
1PARTS LISTING
3
2
1
4
6
7
9
10
11
14
13
2
12
4
5
8
10
14
16
15
ITEM PARTS QTY
1Running rail 1
2 Wall bracket for running rail 2
3Set of double rollers 4
4Door stopper 2
53
6 Door panel 1
7 Wide Fixed panel 1
8 Narrow Fixed panel 1
9Straight handle 1
10 Fixed panel gasket 1
11 Door bottom gasket 1
12 Door side gasket 2
13 1
14 3
15 Bottom center guide 1
16 Gasket (Glass Clip + Bottom Guide) 3

4
TOOLS
HARDWARE
PENCIL
DRILL SILICONESCREWDRIVERS
CUTTING PLIER LEVELTAPE MEASURE
18 19 20
If the shower panels are to be assembled on ceramic tiles, use a 1/4˝drill bit for ceramic tiles.
1/4˝&1/8˝DRILL BITS
*
ITEM HARDWARE QTY
18 #12-3 SELF-THREADING SCREW 4
19 #6-1 SELF-THREADING SCREW 2
20 HEX KEY 3mm 1
21 HEX KEY 6mm (7/32˝) 1
HACKSAW
21
MALLET BLOCK

5
GASKET INSTALLATION
1
1C
1A
Place door panel (6) inside tub to simplify following
installation procedures. Ensure placing the panel
onto a cushioned surface, such as a towel or card
board, to prevent damage either to the panel or
the tub.
Using the cardboard packaging box as platform,
install bottom door gasket (11) onto door panel
(6) using a block and a mallet. Notice the gasket
orientation.
1B
Thoroughly clean either edges of the xed pan-
els (7) (8). Apply gaskets (10) on these edge of the
xed panels, as illustrated.
7
6
8
11
61A
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
10
INTERIOR
SHOWER SIDE
10

6
RUNNING RAIL
2
2A
2B
2
Position the stoppers (4) on the running rail (1) as
illustrated. Secure them temporarily in place.
Position the wall brackets (2) on the running rail (1)
as illustrated. Secure them temporarily in place.
1
4
This manual suits for next models
1
Table of contents
Popular Enclosure manuals by other brands

CRU
CRU DataPort SecureDock quick start guide

Maximum
Maximum S.E.S. Series Assembly instructions

Freedom9
Freedom9 freeStor Mini 210 Specifications

Red4Power
Red4Power R4-G002S user manual

Echostreams
Echostreams DSS212J quick guide

Thermofilm
Thermofilm HEATSTRIP Max THXDC Series Operation, installation, and maintenance manual