ASSEMBLING INSTRUCTION
Rev. 09.2021
Page 1 von 2
MASTER ENTERPRISE OF WOODCARVING HANDICRAFTS / © SIK-HOLZGESTALTUNGS GMBH
FURTHER INFORMATIONS: SIK-HOLZGESTALTUNGS GMBH, LANGENLIPSDORF 54 A, D-14 13 NIEDERGÖRSDORF; +4 (0)33742.7 0; WWW.SIK-HOLZ.DE; INFO@SIK-HOLZ.DE
2.12.116 Climbing Balancing Unit „Cat“
Scope of delivery
Amount Denomination easure
2 climbing posts at 160 kg 320 kg
17 posts à 65 kg 1105 kg
2 tree trunk stairs at 100 kg 200 kg
18 round woods at 35 kg 630 kg
climbing labyrinth
- 5 posts
- 3 support ropes ø 18 mm
- 5 balancing ropes ø 24 mm
250 kg
1 rotating balance beam 50 kg
2 support ropes ø 18 mm at 2 kg 4 kg
2 slanted net ascents with ground anchor plates at 15 kg 30 kg
1 double-balancing rope 10 kg
2 climbing ropes with climbing supports and 1 ground anchor plate at 10 kg 20 kg
1 rope traverse 10 kg
4 climbing nets at 15 kg 60 kg
Sum approx.
2689 kg
All weights are approximate. The heaviest component is highlighted in bold.
Tools
-spade, shovel, tape measure, spirit level, hammer and ladder
-socket wrench 17 / 19 mm, screwdriver with insert Torx Bit (TX 10-30)
-2 persons (2 installers at 36 h), telescopic loader with palette fork, mini excavators
-approx. concrete 4.8 m³ C 20/25
Assembling
-First, the playing surface (security area) should be measured, set the point (height) and the start point (climbing
post 23) can be determined.
-Determine the foundation positions according to plan. easures are to the check by the client/customer,
because of the natural growth forms of the wood. To determine the position of the foundations, use the
attachment parts.
-Digging holes depending on the section for the Climbing Unit and depending on the ground conditions a
drainage layer, for example gravel layer 10 cm in order to prevent stagnant moisture.
-In the foundation area of the post is to follow the included steel reinforcement.
-Installation depths (cut) on the stand post are to consider.
-Lift the posts and attachment parts one after another into the prepared holes to adjust by means of spirit level
and make them solid.
Attention: if not adequately secured play towers or attachment parts may be tipping!
-Attachment parts one after another according to marking (Number on number and/or letter on letter / numbers
indicate in brackets the screw length) mount.
-Information: Flexible attachments are to install with a slight sagging (please not too tight). To consider is the
connection of the eye bolts in the direction of the pull of swing, bridge, nets and ropes. Please remove the nets
and ropes –after the making of the concrete, if the use (the playing of the children) can not excluded.
-After everything is assembled and aligned, the foundation according to the drawing can be properly completed.
-After 3-5 days of curing time, tightening all screw joints and which fill game surface again.
-Transportation braces and installation damage are to be removed after installation on site, grind and paint
damaged areas.
Notice: concrete needs about 28 days in order completely to harden.
Security guidelines
During assembly and transport on site, play towers and/or attachment parts must always be adequately secured,
either through technology or through attached transportation bracing.
Required safety areas/ falling space around equipment are indicated on the installation drawings.