stilum Training barrel User manual

State: 25.01.2021 p. 1
Mounting instructions for „Training barrel“
Item-No. 55 1008 402
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Diagram 1: Overall view of the tness equipment

State: 26.01.2021 p. 2
Mounting instructions for „Training barrel“
Item-No. 55 1008 402
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
1. Select the tness equipment location in consideration of the required movement
area (see diagram 3). Movement areas may overlap, exercise areas must not be
overlapped.
2. Select the postition of the instruction sheet.
Attention: Because of the risk of injury, the instruction sheet has to be arranged
outside of the movement area.
3. Carry out excavation work for the foundations as shown in diagram 2.
After excavation compress the foundation oor.
Note: The tness equipment is is installed at ground level. Pay attention to items
marked „ground level“ at the tness equipment!
4. Carry out excavation work for the instruction sheet foundation as shown in diagram
4. After excavation compress the foundation oor.
5. Set up the concrete foundations according to diagram 2 and 4 with central, hori-
zontal reinforcement.
6. After a setting period of 10 – 14 days, depending on weather conditions and found-
ation size, ll up and compress the holes between the foundation and the foundati-
on hole with excavation. Clean the foundation surface.
7. Place the barrel at the center of the foundation and align the bow around it (see
diagram 2). Drill holes into all foundations and screw the base plates to the founda-
tions with the included heavy-duty dowels.
8. Place the instruction sheet as well on the foundation and screw it onto the foundati-
on with the included heavy-duty dowels.
NOTE: We suggest to align the instruction sheet in such a way that the instructions
can be read while using the tness equipment.
800 800
400
2060
410 410
700
450
1030
2300
800
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Trainingstonne (450)
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
2018-00-00
Maßstab
Schramm 18.08.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
SI
19.01.21
stoßdämpfender Boden
A
DatumÄnderungRev
Diagram 2: Foundation plan
ground level
concrete
foundation
Reinforcement plan: Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25

State: 26.01.2021 p. 3
Mounting instructions for „Training barrel“
Item-No. 55 1008 402
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
9. Cover the movement area with fall protection according to the required drop height
in accordance with EN 16630.
Critical drop height: 500 mm
Recommended surface material: grass, synth. impact protection.
With a smaller installation depth (special edition) we recommend synthetic impact
protection. In this case, make sure that protruding parts (e.g. screws, gusset pla-
tes) are covered with appropriate fall protection.
10. Do not allow to use the equipment before the installation has been nished
Attention: If the tness equipment has been incompletely installed or partly dismantled
when carrying out maintenance and repair work, this may lead to particular risks of
injury for the user. For this reason, make clearly visible that the equipment shall not be
used in such cases.
NOTE: Fitness equipment, which contain components made of stainless steel should
not come with „normal“ steel parts in contact. Those steel parts may rub o and leave
small steel particles in combination with moisture brown rust stains.
If such corrosion occur on stainless steel parts, they are ne to remove with an abrasi-
ve (240 grit).
Please take care when transporting and setting up the fact that the components are
made of stainless steel with no „normal“ steel parts in contact.
In order to preserve a good visual appearance of your stilum tness equipment over a
long period one should take care of maintenance of the stainless surface even despite
of their corrosion resistance.
Especially areas, which can not be reached by rainfall should be frequently cleaned
from dirt and deposits due to air pollution and dirt caused by the atmosphere.
Light soiling can easily be romoved by using a high pressure cleaner.
For persistent deposits use a clean cloth moistened with a special liquid cleaner (e.g.
on phosphoric acid) and rinse o with clear water after a short application time.During
cleaning with mild abrasive components, only wipe over stainless steel surface in poli-
shing direction.
4000
2700
1000
1000
2200
2000
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Fitnesstonne (450)
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
Rev Änderung Datum
1:20
A3
Name
Name
Draufsicht
2018-00-00
Maßstab
Behnke 20.07.16
A
Übungsraum hinzu
20.01.21
SI
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Diagram: Top view
movement area exercise area

State: 26.01.2021 p. 4
Mounting instructions for „Training barrel“
Item-No. 55 1008 402
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
For heavily soiled surfaces, polishes can be used (e.g. for cleaning chrome on cars)
or for greasy and oily dirt alcoholic cleaning agents and solvents (e.g. ethyl alcohol,
isopropyl alcohol or acetone).
However, it should be noted that the dissolved soiling is not spread over the surface
again.
Do not use any chlorid or hydrochloric containing cleaning products nor scouring pow-
der, bleaching - or silver polish cleaner. Cleaning intervals depend on type and degree
of soiling as well as on demands made on optical characteristics. Therefore cleaning is
advisable at intervals of six to twelve months – whereby in the case of strong soiling it
is appropriate to clean the tness equipment at intervals of three to six months.
General Information DIN 16630:2015-06_4.1:
DIN EN 1176 species that tness equipment should not be installed in the immediate
vicinity of children’s playground equipment. In cases where they are erected in playg-
rounds or similar establishments near children’s playground equipment, they must be
separated by adequate distance, fencing or other structural means from the general
play zone.
Movement area DIN 16630:2015-06_4.3.14.4
The free space allowed as movement area must be a minimum of 2.2m. The move-
ment area must be clear of fences, and observers should not wait in this space. The
space should be free of all objects that the user could fall on and be injured. E.g.
injuries could be caused by posts that are not ush with adjacent parts or by protruding
footings. In cases where the equipment has a forced movement, the free area must be
extended about 0.5m. Where tness units are installed on or adjacent to a wall which is
at least as high as the exercise space, the movement area may be reduced. Movement
areas of adjacent equipment may overlap except for equipment with forced movement.
220
300
300
150 1210
AA
SCHNITT A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI+KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Instruktionstafel klein
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:10
A3
Name
Name
Fundamentplan
2203-00-00
Maßstab
Simonis
09.08.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
09.12.20
beliebiger Boden
A
DatumÄnderungRev
beliebiger Boden
optional floor
Diagram 4: Foundation plan of the instruction sheet
This manual suits for next models
1
Table of contents
Other stilum Sport & Outdoor manuals
Popular Sport & Outdoor manuals by other brands

ESCALADE
ESCALADE GOALRILLA GS60c owner's manual

Hudora
Hudora Sky 91 INSTRUCTIONS ON ASSEMBLY AND USE

Pop-A-Shot
Pop-A-Shot PRO I SINGLE owner's manual

Jaypro Sports
Jaypro Sports Series FHG-2AL installation instructions

Cornilleau
Cornilleau 540 Assembly instructions

Bestway
Bestway Up, In & Over Lion owner's manual