
ASSEMBLY OF RECORD ARCHIVE SHELVING
Tools Needed: A rubber mallet for seating the shelf supports into the uprights.
Two people are recommended for assembly. Approximate assembly time: 20-30 minutes per section.
RETAIN INSTRUCTIONS FOR FUTURE REFERENCE
9. If joining more than one unit together, your original unit
should have been assembled with ZTP uprights on one end,
as described in step 4. Simply continue adding shelf supports
and uprights to complete your additional units.
4. Place a third front-to-back support in the middle slots of
the two uprights (at the level you want your third shelf to
be). This forms one end of the shelving unit. Repeat steps 3
and 4 to construct a
second set of
unit ends.
2. Depending upon whether you ordered a single unit or an
adder unit, you may have one or both of the styles of upright
shown. A single unit will use EUR posts for all four uprights,
as show below in Figure A. If you plan on installing an adder
unit, you should build your starter unit with two ZTP posts
on one end which will join with the adder as shown in Figure B.
1. The reference numbers used throughout this sheet refer to
the illustration on the back cover. This is to help you to
identify the various parts as they are mentioned.
3. With the help from an associate, or using a wall for support,
connect two EUR uprights (Ref. No. 1) using two front-to-
back supports (Ref. No. 3), one at the top and one near the
bottom (leaving the bottom-most keyhole slot empty). Be
sure the front-to-back supports are fully seated in the
keyhole slots as shown.
5. With the help of an associate, connect the two unit ends
with left-to-right shelf supports (Ref. No. 4). These should
be placed with the ange up and at matching levels
with the front-to-back supports, creating a at surface
on which to
place decking.
8. If particle board decking (Ref. No. 6) was ordered, place the
decking on each shelving level. The decking should t ush
inside the shelf supports. If you have purchased a single unit,
your shelving unit is now complete. For adder units, see step 9.
7. Attach the shelf reinforcements (Ref. No. 5) at each level by
sliding them onto the rivets until centered. Tap down on the
reinforcements until they are seated rmly.
6. Attach the remaining shelf supports at the desired shelf
levels, making sure that all shelf supports are completely
seated in the upright slots.
EUR
NOTE: Inset is shown from the opposite side (below).
ZTP
Figure A
Figure B
IMPORTANT: All shelf supports
must be installed with the ange
facing up, as shown on right. This
ange is what the shelves will
rest on.
NOTE: If you are planning to install an adder unit, this
second set of uprights should consist of ZTP uprights
(Ref. No. 2) to act as an intermediate assembly.
Carefully review step 2 to better understand.
NOTE: If you have purchased additional shelf levels, the
shelf supports for the extra levels may also be inserted
at this time.
NOTE:
Every fourth
keyhole slot
is shaped
differently
(with a
attened top)
for easier
alignment of
supports.
Supports are properly
seated when alignment
hole is fully visable.
Narrow area
of keyhole
slot is at the
bottom.
NOTE: Recommended
number of reinforements
per shelf are as follows:
48”w-69”w = 1 reinforcement
72”w = 2 reinforcement
84”w-96”w = 3 reinforcements