
After connecting BC51 to
802.3af/802.3 at Power over
Ethernet (PoE) port on your
network, visit
www.verkada.com/start
For detailed installation
instructions, visit
www.verkada.com/support
Remove the iPad from the
mount plate and set it aside.
3
Slide the front cover o of the
mount plate.
2
Loosen but do not remove the
four screws on the mount plate.
1
For a solid material, like wood or
metal, drill three 5/32 inch pilot holes.
Fasten the mount plate onto the wall
by installing the flat head mounting
screw into the top pilot hole and the
round head mounting screws into
the bottom two pilot holes.
Peel the protective film o of
the adhesive strip and place
the iPad into the mount.
6Place the mount front cover so that
screws insert into the circular holes
in the mount plate, then slide the
front cover up so screws are in the
narrow section of the slot.
8
Press firmly on the iPad for 8
seconds to adhere it to the mount.
7
For drywall, drill three 7/16 inch holes and
insert the drywall anchors into the holes.
Fasten the mount plate onto the wall by
installing the flat head mounting screw
into the top wall anchor and the round
head mounting screws into the bottom
two wall anchors.
Connect the PoE adapter to
your network using the ethernet
port located on the mount. Plug
the lightning cable into the iPad
and check connectivity.
5
Tighten all four screws with the
2.5mm ball head hex key tool to
secure the mount front cover.
9
BC51 Mount & Connect
4