
6167 DON MURIE ST., NIAGARA FALLS, ON L2G 0B1 | TF: 1.866.282.2026 | E: ORDERDESK@AIRWOOD.CA AIRWOOD.CA
1
Installation
STEP 1
Clear, clean, and trim any exposed metal from the air duct that
sits above the height of the sub oor.
STEP 2
Position the ush-mount frame over the duct opening so that
it is parallel to the oor line. All four sides will need to sit on
the sub oor. Since no parts or pieces need to t into the duct
opening, you have some exibility in placement. For optimal
performance, the frame of the ush mount vent should be
centred over the air duct.
STEP 3
Drill a 5/64” pilot hole inside the rabbeted edge or recessed area
of the frame at an angle down into the sub-oor.
Before Installing
It is recommended to consult an NWFA certied hardwood
oor installer if you are unfamiliar with installing wood
ooring accessories. Airwood Flooring Accessories accepts
no liability for any damage to the home or personal injury
from installation.
Observe all local building codes.
Wood vents should always be installed at the time of your
hardwood oor.
Important Information
Airwood Flooring Accessories ush-mount vents are listed
and sold by HVAC (air duct) opening, which is an industry
standard. The outside dimension of our frame will be larger
than the duct opening measurement.
Airwood Flooring Accessories ush-mount vents are
available in 9/16”, 3/4”, 5/8” or 1/2” thickness. These thickness
measurements need to be determined at the time of order
to match the thickness of the oor being installed. Do not
under any circumstance alter the thickness of the vent
after fabrication.
Our ush-mount vent may or may not have a universal
groove in the frame. Since so many ooring manufactures
have their own groove, we recommend installing ush vents
by taking the tongue o your hardwood and butt jointing the
oor to the frame. See Installation Steps.
Tools and Materials
Wood Vent
Safety
Glasses Drill Hammer 6” Finishing
Nail Nail Set
CONTINUED ON NEXT PAGE >