If there is an automatical controling of water level,all of adjusments,tests, During the first burning air inlet door and secondary air inlet on the coal feed door
caliberations and inspections of function of this control system must be done must be open
and it must be proved to work correctly. Air inlet door,secondary air inlet and airdamper must be adjisted by keeping up first
* Be sure whether water level indicators are working or not, little flame
* If steam boiler is out of service for a long time,before starting ,all inspectetions You must not completely close air dampers and doors that getting air enter and air
must be done and all lomeness must be eliminated. exit.
*Water must be filled in boiler in appropriate checimal condition. EN12953-10 Not to let flying particules in coal go to air and not to cause or pollution ,new coal
The boiler feed water composition must be as indicated in Table 5-1 & 5-2. must not add on to the burning coal.
Otherwise guarantee is not valid. When you want to feed coal in the boiler ,you must pour ashes with pioner tool
* The water given to the boiler musn't be cold .The temperature difference of water to ash room you shoud feed coal to toiler by putting new coals on the
and boilers metal sufface must not exceed 10C°. side grill .After that new coals must be ….. In touch the burning coals.So that can
* Water feed must be stopped after filling the boiler, check whether there is any fired to support enough air for burning in your boiler,extremely ash massing
blockage or not in the pipes and valves and boiler must be discharged by must be prevented
discharcing valve.
* If the boiler is not connected to main steam pipe by only one valve ,steam * Water level must be kept stable by making blowdowm from time to time
discharge valve must be controlled by opening and closing. This valve must not be Water level rise because of heating of the boiler water.
tigthened very much while supplying steam, considering enlargement and explosion of it. * After obtaining homogenuos heat inside the boiler, flame can be enlarged and the pressure.
* Main steam pressure indicator must be inspected and calibrated. of the boiler can be increased, the time for increasing the boiler pressure must be according to
Fuel and Air adjusment must be done with on exhaust gas analyser and it boilers capacity. Quick pressure rises must be avoided.
must be done by experts.In practically ,flame colour and exhaust gas colour are * Safety valve must be controlled
used to make adjusment of mixture of air and fuel. * Water level indicators,mantoles and inspection door,must be controlled
If the flame colour is light yellow and the exhaust gas is colourless it means occasionally and if there is leakage ,it must be eliminated.
of air is high. When leakages occur at high pressures and temperatures do never attemp to eliminate,
If there is not burning or flame length is short and exhaust gas colour is dark,quantity wait for the boiler to cool down than take out those parts from system.
at air is little .
It is preferred to have an orange coloured flame.Flame and exhaust gas must be BOILING
controlled continuasly. Boiler must be boiled with chemical cleaner and alkali detergent for cleaning the dirt,rust
* First Flame when you ignite the boiler firstly must be little according to the filth on the water surface of newly sotted boiler or repaired boiler because of contacting
equipments capacity. high pressure.
The most little flame, at least one hour,must be kept up by not making it bigger. You must get out water level indicator during boiling and you must put on temporary
* Kazannz kat yaktl olarak kullanyorsanz,yakacanz kömür, portakal glass because of preventing water level indicator from dirt after finishing boiling,you
Coal must be spread on coal grill from coal inlet door. must put on water level indicator in its place.
Pieces of wood and fire wood must be spread over the coal. Quantity and Kinds of materials used for boiling must be like this;
Burning should be proved by locating paper,oaku,resinous wood among pieces For pertone of boiler water
of wood. 2 kg sodium carbonate
Boiler must be ignited from side up.If you ignite from bottom side,both coal flying 2 kg trisodium phosphate
particules are discharced and causes air pollution b burning the same ratio while 1 kg sodium hdyroxide
consuming %20-30 more coal.
17 18