
85230 04/08 Pg. 2
FOL LOW ST EPS IN ORDER:
1. PLACE ONE SPACER “J” INTO THE HINGE
HOLE IN BOTTOM OF PART #2. NOW PLACE
THE BOTTOM DOOR HINGE INTO THIS SPACER.
2. PLACE ONE SPACER “J” ONTO THE TOP
DOOR HINGE AND INSERT IN THE HINGE HOLE
ON TOP PART #2. SECURE TOP HINGE “L” TO
DOOR WITH (2) SCREWS “K” AS SHOWN.
3. REPEAT ABOVE STEPS WITH OTHER DOOR
FOR RIGHT SIDE OF UNIT.
I M P O R T A N T
IF DOOR DOES NOT OPEN PROPERLY OR IF PART
“L”MOVES WHILE OPENING DOOR,CAREFULLY
RE-CHECK THE INSTALLATION OF PART “L”.
A COMMON MISTAKE IS TO INSTALL PART “L”
BACKWARDS.PLEASE REFER TO PICTURES
IN STEPS 8 & 9 FOR CORRECT ORIENTATION.
Attach Part “L” (hinge) to
BOTTOM of doors FIRST.
DO NOT attach TOP
Hinges until STEP 9.
BOTTOM
DOOR
HINGE
HINGE
HOLE
STEP 2
Using a screwdriver,
screw (28) Parts “C”
into each Part #’s 2 & 4.
DO NOT USE POWER
DRIVERS OR POWER
TOOLS - THEY CAN
STRIP THE HARDWARE.
B
7
K
F
E
LD
6
STEP 3
Slide Part #’s 3, 4 & 8 onto the
(6) Parts “C” in Bottom Part #2.
Insert a second Part #2 onto
the top of Part #’s 3, 4 & 8.
Using a screwdriver, hand tighten
Parts “B” onto Parts “C” (12 places).
DO NOT USE POWER DRIVERS
OR POWER TOOLS - THEY CAN
STRIP THE HARDWARE.
REPEAT ABOVE STEPS WITH
REMAINING PART #’S 2, 3, 4 & 8.
(This will create 2 boxes - a left
side and a right side).
ON RIGHT SIDE BOX, NOTE
THAT THE PARTS “C” ON
PART #4 WILL FACE THE
OUTSIDE, AND TOWARDS THE
LEFT SIDE BOX (See Figure A)
J
5400 DONIPHAN DRIVE
NEOSHO, MO 64850
Toll Free: 888-627-2601
www.marcogroupinc.com
TANK PLACEMENT DETAIL
TOP VIEW
OF “B”
FRONT VIEW
OF “B”
IMPORTANT!!!
NOTE ORIENTATION OF PART “B”.
OPEN (HOLE) SECTION MUST FACE
TOWARDS THE CORRESPONDING
HOLE IN EDGE OF PART NUMBER’S
3, 4, 6 & 8.
THE ARROW ON TOP OF PART “B”
WILL ALSO POINT TOWARDS THE
CORRESPONDING HOLE IN EDGE OF
PART NUMBER’S 3, 4, 6 & 8.
STEP 1
Push in (28) Parts “B” into Part #’s 3, 4, 6 and 8.
PART “B” MUST BE INSERTED CORRECTLY.
REPEAT ABOVE FOR
RIGHT SIDE DOOR.
3
(2X)
8
(2X)
4
(2X)
(1X)
2(4X)
C
H
OLES
ARE
F
ACING
I
NSIDE
3
2
4
2
C
C
IMPORTANT:
Part “C” faces to the
outside on Part #4.
B
IMPORTANT:
Note orientation of Part #2.
Hole configurations face to
the front for assembly.
Figure A
RIGHT SIDE BOX
4
2
C
8
4
(2X)
STEP 4
Carefully rotate both boxes onto back side.
Slide Part #6 onto Parts “C” on Left Box.
Carefully Slide Right Box into holes On Part #6.
Hand tighten (4) Parts “B”.
6
LEFT SIDE
RIGHT SIDE
C
B
Use extreme caution
and carefully rotate
the stand upright.
Inside of
Left Door
7
Inside of
Right Door
KL
E
F
J
F(2X)
LEFT SIDE
You MUST PositionTank towards
the BACK of Stand!
LEFT SIDE BOX
F
IRST
S
ECOND
G
H
T
HIRD
F
OURTH
1
1
Using the Allen wrench (included),
attach (8) Parts #5 with (8) Parts “A”
into each box assembly.
Partially screw (4) Parts
“H” through Part “G” &
into Left Part #1 in
sequences
FIRST &
SECOND as shown.
Connect and align both Parts #1.
Partially Screw (4) Parts “H” through Part
“G” and into other Part #1 in sequences
Tighten all screws when both Parts #1 are properly aligned.
Attach top assembly to bottom
unit using (8) Parts “A”.
THIRD & FOURTH as shown.
5(8X)
A
Lay out both Parts #1
as shown.
STEP 5 STEP 6 STEP 7
A(8X)
(2X)
(2X)
Note hinge
pivot location
Note hinge
pivot location
Parts “C” screw through
small holes this side.
(Important: Parts “B” are
inserted on other side)
STEP 8 STEP 9
LEFT
SIDE
7
Outside of
Left Door
K(2X)
L
STEP 10
IMPORTANT!
Use extreme caution when
handling, lifting and moving
completed assembly.
Do not move unit with tank.