Contents
1 Safety Considerations ..................................................................................... 1
2 Selection of Installation Location and Precautions.......................................... 2
2.1 Selection of Installation Location for Air Conditioner Unit ...................................... 2
2.2 Selection of Installation Location for Indoor Unit.................................................... 2
2.3 Select Installation Location of Outdoor Unit........................................................... 2
2.4 Cable Layout.......................................................................................................... 3
2.5 Grounding Requirement......................................................................................... 4
2.6 Noise Control ......................................................................................................... 4
2.7 Accessories for Installation Use ............................................................................. 4
3 Installation of Outdoor Unit.............................................................................. 4
3.1 Precautions on Installation of Outdoor Unit ........................................................... 4
3.2 Installation of Outdoor Unit .................................................................................... 5
3.3 Electrical Cable Connection................................................................................... 6
4 Connection of Indoor and Outdoor Unit........................................................... 7
4.1 Manifolding Mode of Connecting Pipe ................................................................... 7
4.2 Indoor and Outdoor Unit Capacity Code................................................................ 7
4.3 Allowable Length and Drop Height of Connecting Pipe ......................................... 8
4.4 Dimension of Connecting Pipe............................................................................... 9
5 Instructions for DIP Switch ............................................................................ 13
5.1 Set the addrss code and capacity code for indoor unit ........................................ 13
6 Filling of Refrigerant and Test Run ................................................................ 14
6.1 Filling of Refrigerant............................................................................................. 14
6.2 Calculating Mass of Additional Refrigerant .......................................................... 14
6.3 Inspection Items after Installation ........................................................................ 16
6.4 Test-running ......................................................................................................... 17
7 Operating Principle of Air-Conditioning Unit .................................................. 18
7.1 Heat Pump Type Mini D.C.Inverter Multi-Connected Air-Conditioning Unit ......... 18
8 Types of Indoor Units to Be Integrated.......................................................... 19
9 Maintenance Measures ................................................................................. 20
9.1 Inspection at the Beginning of Operational Season............................................. 20
9.2 Maintenance at the End of the Operational Season ............................................ 20
9.3 Maintenance Measures ....................................................................................... 21
10 Trouble Shooting ......................................................................................... 22
11 Unit Working Condition ................................................................................ 24
11.1 Rated working condition..................................................................................... 24
11.2 The range of production working temperature ................................................... 24