
AWM-P G Page 2 of 2
Use guide marks on post
channels as a reference
for setting the height of
each arm.
NOTE Additional
adjustments may be
required once monitors
are installed.
1. Attach Post to xing (xing sold seperately)
2. Mount Arms onto Post
4. Cable clips and cover
3. Position Cable Cover and t Post Cap
NOTE: Do not mount monitor arm
on rear channel post when using the
following desk clamps:
3.1 To reposition the cable cover,
unclip cable cover from post and insert
it into any of the available channels
Optional cable
cover positions
3.2 Fit post cap onto the top of the post
No portion of this document or any artwork contained herein should be reproduced in any way without
the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer
reserves the right to alter specications without notice. ©20210331
Allen Key
(Supplied w/xing)
Post Cap
Post
Note: An allen key
may be stored in
the Post Cap.
AWM-FF AWM-FH AWM-FC
AWM Fixing options
1.1 Follow the
installation guide
provided with your
xing to attach it to
the post and t it to
the worksurface.
SQUEEZE
SQUEEZE
SQUEEZE
SQUEEZE
Cables can
exit from the
side of the
cable cover
PUSH
PUSH
4.1 Load cables into
cable clip.
4.2 Insert one side of the cable
clip into a channel on the post,
then push in the other side.
Load cables
into cable
cover
4.3 Load
cables into
cable cover.
4.4 Clip the
cable cover
onto any of
the four post
channels.
i
i
AWM-FH
Heavy Duty
F Clamp
AWM-FC
C Clamp
AC-GC
Grommet
Clamp
Atdec
Custom
Rail Plate
AWM-FF
F Clamp
AWM-FB
Bolt
Through
Kit
2.1 Follow the
installation guide
provided with
your arm(s) to
mount it to the
post.