LOAD LIMITS and WARNINGS
Up to four AX1012 cabinets are
allowed to be suspended from a single
KPTAX1012V y bar.
For stacked installaon on oor do not
exceed three cabinets for each KPTAX1012V y bar.
Use always the KPTAX1012V y bar with KPTAX1012
coupling bars to the sides of the array.
Never use KPTAX1012V for suspending an AX1012
horizontal array.
See AX1012 User’s Manual for complete rigging
instrucons and all the details about the use of
KPTAX1012V.
The MAXIMUM LOAD CAPACITY of KPTAX1012V is 595
kg (1311.7 lbs.) with balanced load.
SPARE PARTS:
94SPI8577O 8x63 mm
Locking Pin
OPTIONAL
ACCESSORY:
AXFEETKIT Kit of 6pcs
BOARDACF01 M10 foot
for stacked installaon
ASSEMBLING INSTRUCTIONS
Follow the sequence below to assemble up to four AX1012 units into a vercal array. The rst step before liing up the system is to assemble the
y bar to the rst box. Be careful to insert properly all the bars and their locking pins, with the shackle in the right hole as specied by the aiming
soware. When liing and releasing the system, always proceed slowly and gradually step by step, being careful to correctly assemble all the
rigging hardware and to avoid endangering yourself and your hands from being crushed
The KPTAX1012V y bar can be used also for down ring applicaons and for stacked installaons (oponal BOARDACF01 are needed).
1) Remove the pins at the end of the ying bar and insert the ying bar into the rails of the rst box.
2) Put back in place the pins in their hole, making sure that they are
inserted correctly. Fix the shackle in the chosen hole and link the
liing system.
3) Li the rst box, place the second box on the oor just
underneath the rst one. Let down slowly the rst box over
the second one, aligning the bumpers and the slots of the two
loudspeakers. Note: a proper wedge placed between the cabinet to
be linked and the oor can be useful.