A. Seal and fit plug.
B. Fit and seal nipple then
tighten nuts.
C. Trial fit the wall plate
and ensure centre of mixer
to nipple is correct and
level before sheeting off.
D. Fix backing plate to wall.
E. Cut the nipple thread
to length before fitting
wall plate.
F. Tile or finish wall face.
G. City Que 1.9805.05.
Plate to fit back to the
shoulder of the nipple.
Yokato 1.9305.05.
The nipple screws in from
the front. Screw in till it
bottoms out on the plate.
H. When fitting off lock handle
and spout screws with
allen key supplied.
To be read in conjunction
with information on reverse.
Using copper tubes
supplied, rough in supply lines.
Use the template supplied to
ensure the correct spacing
of tubes.
The tubes are to be clean
and smooth with no external
damage, with the top of
the tubes clean cut and
no external burrs. Ensure
protection of tubes during
building works.
The structure is to be sufficient
to securely anchor the mixer
and tubes.
When fitting off drill floor for
fixings, ensure water lines
are flushed to remove foreign
particles. Push on flexible
connectors to supply tubes.
Supply tubes to be 25-30mm
above finished floor.
Water test before fixing down.
Remote isolating valves must
be fitted to enable ease of
service if required.
If the floor is not level, the
adjustment screws in the floor
mount can be adjusted to
ensure the mixer is vertical.
Screw down dress flange.
These instructions are to be read in
conjunction with the basic installation card.
1. Using copper tubes supplied, rough in
supply lines. Use the template supplied to
ensure the correct spacing of tubes.
2. The tubes are to be clean and smooth with
no external damage, with the top of the tubes
clean cut and no external burrs. Ensure
protection of tubes during building works.
3. The structure is to be sufficient to securely
anchor the mixer and tubes.
5. When fitting off drill floor for fixings, ensure
water lines are flushed to remove any foreign
particles. Push on flexible connectors to
supply tubes. Supply tubes to be 25-30mm
above finished floor and centered 75mm
from wall.
6. Water test before fixing down.
Remote isolating valves must be fitted to enable
ease of service if required.
If the floor is not level, the adjustment screws in
the floor mount can be adjusted to ensure the
mixer is vertical.
Screw down dress flange.
WALL MIXER INSTALLATION CITY QUE 1.9805.05, YOKATO 1.9305.05 AND 1.9306.05
WALL MIXER INSTALLATION
FLOOR MOUNTED BATH / BASIN MIXER
INSTALLATION GUIDE
1.9913.00 AND 1.9813.00
FLOOR MOUNTED SHOWER
INSTALLATION GUIDE
A
B
Front View
C
D
E
F
GH
Side View
A. Remove the handle and trim and push protective sleeve over
the body to protect from damage during tiling.
B. Install mixer to correct depth as shown in the drawing.
It is most important that the finished wall location is
determined.
Base of body to finished wall face (Length B)
Product Max Min
1.9348.00 70mm 45mm
1.9448.00 60mm 45mm
All other innwall mixers 77mm 45mm
When installing the mixer ensure that it is positioned the
correct way (as per the markings on the body) with the hot
water on the left and cold water on the right when viewed
from an operating position.
Connect mixer using union connections (not nylon olives).
Ensure mixer is level and aligned correctly.
C. Because of the speed at which single lever mixers can be
closed, they can accentuate water hammer if not properly
installed. Before sheeting walls it is important that the system
is checked for this.
If hammer is apparent, all possible measures are to be taken,
including but not limited to, correct and secure fixing of
pipework, keeping the length of the pipework on the outlet as
short as possible and the fitting of outlets that have a high star
rating
D. Check operation and test for leaks before plastering or tiling
and refit tiling sleeve. Seal around bodies to prevent water
penetration into wall
E. On completion of tiling remove tiling sleeve and fit dress ring.