Before re-commissioning the unit, all scale and
moisture must be removed from the level sensor
insulating gaskets to avoid false signalling
through the scale to the boiler body. Failure to
remove this scale and dry the probes could cause
the sensor to indicate to the Printed Circuit Board
(PCB) that water is covering the element whether
or not water is present. In this situation the PCB
could energise the element , causing failure. If
in doubt , protect the element by hand filling the
boiler with water to cover the element before
switching on the electrical supply.
ISSUE 3 PAGE 5
6.3 Replacing the Element or Thermistor
The element or thermistor can be replaced by
removing the back-nuts and washers and withdrawing
from inside the boiling chamber. IMPORTANT : A
new body lid gasket may be required.
6.4 Replacing the Main Circuit board (PCB) and
Triac PCB.
The main PCB and the triac PCB should be replaced
as a matched pair to be sure of correcting circuit
board faults.
1. Disconnect the wiring connections to the main
PCB
2. Remove the PCB by pulling it forward off the
supports
3. Disconnect the wiring to the triac PCB and remove
by releasing the fixing screw and pulling it forward off
the supports.
4. Apply a thin layer of heat transfer compound
(supplied) to the mounting platform of the replacement
triac PCB and fit to the mounting supports. Ensure it
is positively located and secure it with the single
fixing screw.
5. Reconnect the triac wiring , see wiring diagram at
the rear of the manual
6. Position the main PCB on the four supports and
wire in accordance with wiring diagram
6.5 Replacing the Inlet Solenoid Valve
IMPORTANT: In areas where scale can be a
problem, check that the fault is not due to a
blocked filter ( this is removable at the inlet to
the solenoid) before replacing the unit. Scale
build up in the filter can cause intermittent
problems.
1. Remove the silicone hose that joins the sole-
noid to the water inlet. Warning, the pipe will
retain a volume of water that will be released
when the connection is broken.
2. Pull the solenoid from the mounting brack-
et IMPORTANT: the correct operation of
the boiler relies on a regulated flow of
water from the solenoid valve and there-
fore a genuine replacement part supplied
by Calomax must be fitted.
3. Fit the replacement part onto the exist-
ing mounting bracket (if a mounting bracket
was supplied with the replacement valve this
should be removed ) and re-connect the live
and neutral connections
6.6 Replacing the Dispense Valve, Key
Switch , Push Button, Fascia PCB
To replace any of the above parts, the
following instructions should be followed:-
1. Remove the outer casing lid
2. Loosen the two screws in the cover plate
located above the fascia and slide the plate
out.
3. Remove the four screws from the back
panel and remove , being careful not to
damage the thermal cut-out in the process
4. Remove each of the two screws holding
the copper heat sink, solenoid bracket and
main PCB bracket in position and allow them
to hang loose.
5. Remove the earth wire adjacent to the
main PCB from the right hand side of the
outer casing.
6. Unplug the wiring harness from the fascia
PCB and move the harness away from the
top of the outer casing.
7. Remove 2 screws from either side of the
base of the boiler.
8. The outer casing can now be removed by
leaning it forward, clear of the dispense valve,
and lifting it up / forward from the base.
Note : when re-assembling the boiler ensure the
wiring harness is plugged back into the fascia
PCB and the harness does not become trapped
between the body and outer casing.
Dispense Valve
1. Disconnect the wires from the coil
2. Remove the two setscrews
3. Pull the valve forward leaving the rubber
insert behind.