•The UNI boiler must be connected to a suitable separate chimney designed in compliance with instructions stated
further within this manual and mandatory regulations. The chimney must show the draught values required for
the given boiler model. The boiler may not be operated unless the chimney connector is ready and sufficient
burning draught ensured.
•Always ensure a satisfactory fresh air supply into the boiler-room – see the instructions for placing and installing
the boiler.
•Do not install the boiler within an area being shared or used by persons or in the place with any direct openings
to habitable rooms.
•If the hydraulic circle is not equipped with the safety heat exchanger system according to instructions provided in
this manual, the boiler must be installed into the open system.
•Do not drain any water from the hydraulic circle except for the cases of maintenance or risk of frost. The
hydraulic system may be refilled with the anti-freeze fluid Friterm.
•Do not feed cold water directly into the boiler overheated for any reason. This might lead to cracking of boiler
sectional elements. When using the two-way safety valve DBV 1 – 02, the cooling water is gradually added into
return water.
•Do not fire the boiler with the front door opened.
•The heating system should enable the water flow corresponding to the boiler output and temperature difference
between the incoming and return water should not exceed 20° .
•heck regularly whether the heating system is filled with water.
•Boilers should be installed directly onto a flat and smooth floor made out of non-flammable materials. It is
recommended that the height of pedestal is 50 mm at least and its other dimensions are bigger than ground plan
dimensions of the boiler. This pedestal isolates the boiler from water spilled on the floor.
•If the boiler is installed into an old heating system, the heating system must be rinsed and cleaned from all
contaminants before the boiler is connected.
•Your boiler cannot switch the pump on and off automatically. The pump must be switched on if the boiler
temperature is higher than temperature of cold water or if the fuel is burnt inside the combustion chamber.
Never switch the pump off unless the fire is completely quenched.
•Water in the boiler should never reach high temperatures when the pump is switched off. In such a case, an
immediate supply of cold water into the hot boiler may cause cracks of the boiler drum due to high thermal
energy.
•If the draught controller does not work properly, change its adjustment step by step as described in the draught
controller manual.
•If the chimney draught is not sufficient or completely missing (e.g. the chimney is blocked, uninsulated or built
incorrectly, etc.), you can experience combustion difficulties (no fire, excessive smoking, condensation resulting
from the cold flue gases). In this case, it is strictly recommended to inspect the chimney by an expert and repair
all possible irregularities. Your boiler has been designed on the principle of natural draught – therefore, the
correct chimney installation is so important.
10. Guidelines on the product end-of-life disposal
It is recommended to dispose the wrappage as follows:
- Plastic foil, cardboard package – use the junk services.
- Metal strapping tape – use the junk services.
- Wooden base is disposable and cannot be further utilized as a product. Its liquidation is subject to the law No.
94/ 2004 oll. and 185/2001 oll., as subsequently amended.
Because the product is made out of ordinary metal materials, it is recommended to dispose single components as
follows:
- Exchanger (grey cast-iron) – use the junk services.
- onduits, shell – use the junk services.
- Other metal parts – use the junk services.
- Insulation material ISOVER – use a company dealing with waste collection and disposal.
11. Warranty and liability for defects
Manufacturer provides the following warranty:
– Boiler: 24 months since the date of putting the product into operation; 30 months at most since the date of
dispatching from the manufacturing plant.
– Boiler drum: 5 years since the date of dispatching from the manufacturing plant.
The user is obliged to entrust a specialized installation company with putting the boiler into operation whereas all
defects may be solved and removed only by a professional contractual service organization – if this is not
respected, no warranty on the proper boiler function is applicable. After filling in the form “Certificate of quality
and completeness of the UNI boiler”, it serves as the “Certificate of warranty”.
The user is obliged to perform a regular maintenance on the boiler.