ARRAY LAYOUT PAGE 07
INSTALLATION PAGE 08
GROUNDING PAGE 17
ACCESSORIES PAGE 21
CLAMP PART NUMBERS PAGE 29
COMPATIBLE MODULES PAGE 30
Clicking the page name will take you to that page

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
FEATURES+ BENEFITS
PAGE
02
CLICKFIT
ClickFit conforms to UL 2703 and is one of the fastest installing rail-based systems in
the industry. Thanks to its Click-In Rail assembly, the rails can be connected to any of
EcoFasten’s composition shingle, tile, and metal roof mounts in seconds without the
need for fasteners or tools. The ClickFit system is made of robust materials, such as
aluminum and coated steel, to ensure corrosion resistance and longevity. ClickFit has
been tested in extreme weather conditions including wind, re, and snow.
FEATURES
• Tool and fastener free rail attachment
• Fully integrated bonding
• Click-on Mid & End Clamps
• Compatible with a variety of EcoFasten roof attachments

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INTRODUCTION
PAGE
03
INTRODUCTION
This manual describes the installation of the ClickFit mounting system for photovoltaic
modules on steep-slope roofs. Described within are details for composition shingle and tile,
attachments for ClickFit System. Other roof types as well as all other installation manuals
can be found for download at www.EcoFastenSolar.com.
GENERAL INSTALLATION CONDITIONS
Failure to observe the requirements in this document can lead to the exclusion of all
guarantees and product liability. EcoFasten Solar reserves the right to amend this document
without prior notice.
STABILITY & CONDITION OF THE ROOF
The roof must be in good condition and strong enough to support the weight of the modules,
including the additional equipment, wind and snow loads. When in doubt, consult with the
engineer of record, and/or the local building inspector.
APPLICATION RANGE OF CLICKFIT
Refer to Compatibility module list at the end of this document. Please refer to the Ecofasten
ClickFit span tables for system structural certication and allowable spans.
WARRANTY
Guarantee according to the warranty conditions and general terms and conditions of
EcoFasten Solar. These conditions can be found on the website at www.EcoFastenSolar.com.
LIABILITY
EcoFasten Solar cannot accept any liability whatsoever for damage or injury caused by
not taking adequate safety precautions or (accurately) following the instructions given, or
resulting from negligence during the installation of the product and any corresponding
accessories specied in this document.

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
OVERVIEW
PAGE
04
OVERVIEW
The ClickFit mounting system consists of patented adjustable tile hooks and L feet, rails, and
the installation materials required for the mounting of photovoltaic modules on composition
shingle or tile roofs. For simplicity, tile hooks and L feet will be referred to as “attachments”.
ATTACHING TO THE ROOF
The attachments are fastened to the rafters. Attachments are height-adjustable to level the
system on uneven roof surfaces.
ATTACHING THE RAIL
The rail assembles to the attachments with a click-connector, or Clicker. The rail simply clicks
into place without the use of any tools.
ATTACHING THE MODULES
The modules are attached to the rails by means of mid clamps and end clamps.
Installer must review module and any 3rd party manufacturer’s documentation for
compatibility and compliance with warranty terms and conditions.
WARNING: This product must be installed and used according to this written instruction.
Any installation or use of this product not in accord with or not authorized by this written
instruction shall void any and all warranties, express or implied, on the product or the use
of the product and may cause failure, property damage and personal injury. EcoFasten is
not liable for any unauthorized use. Install and use only with other EcoFasten products to
ensure proper t and function.

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
Refer to ClickFit Alternate Component Addendum for components not shown
COMPONENTS
PAGE
05
SYSTEM COMPONENTS REQUIRED
SYSTEM COMPONENTS ACCESSORIES
FRAME MLPE
MOUNT
MODULE JUMPER MLPE MOUNT WIRE MANAGEMENT
CLAMP
CLICKFIT RAIL RAIL SPLICE TILE HOOK
END CLAMP SIMPLEBLOCK-U
L-FOOT END CAP MID CLAMP

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
RATINGS
PAGE
06
TORQUE SPECIFICATIONS
*Class A System re rating with Type 1, 2, and 29 PV modules with no skirt required. Class A System re rating with Type 4 and 5
modules with south edge skirt required. Any roof-to-module gap is permitted. This rating is applicable with any roof attachment.
**Class B System re rating with Type 4 and 5 modules, no skirt required. Any roof-to-module gap is permitted. This rating is
applicable with any roof attachment.
Fire Rating Class A* and B** System Fire Rating
Max System Voltage 1500 VDC
Max Fuse Rating 40A
Certication Conforms to UL STD 2703
Warranty 25 Year Material and Workmanship
UL 2703 Markings Product listing label is located on the rail end-caps
Roof Pitch 2:12 – 21:12
UL 2703 Allowable Design Load Rating 10 psf downward, 5 psf upward, and 5 psf lateral
Max Module Size 25.6 sqft
Module Orientation Portrait or Landscape
Multiple use Rated Components (Position Independent) Mid Clamp, Frame MLPE Mount and MLPE Mount
UL 2703 MARKING EXAMPLE:
Component Torque (in-lb) Notes
Lag Screw N/A Fully Seat. Use visual indicator of the black EPDM ring around the
bonded washer for torquing.
Mid-Clamp 144
End-Clamp 96
Rail Clicker Leveling Bolt 142 Pre-torqued upon delivery. Applies to Tile Hook and L-Foot/Clicker
Hook Height Bolt N/A Lightly clamp hook to ush with top of next tile row
Ground Lug N/A Refer to specic ground lug manufacturer’s installation manual
MLPE Clip 144
MLPE Mount 144
CLICKFIT
SYSTEM
MFG ID CODE: SSS-QQ-YYYY Conforms to UL STD 2703
XXXXXXX
RATINGS

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
ARRAY LAYOUT
• Refer to span tables, local jurisdiction, or engineer of record specications when determining
setbacks from roof edges, attachment spans, etc.
• Mark the perimeter and corners of the array on the roof surface.
*Add 3/4” to account for the gap between modules in each direction*
• Draw or snap chalk lines where the rails will be installed,(refer to module manufacturer specs
to determine allowable mounting locations).
• Locate rafters within the area of the array. It may be necessary to shift
the array East or West on the roof in order to fall within the rail cantilever
specs (1/ 3 of span).
• Stagger rafters every row if required by the local jurisdiction, engineer of record, or company
policy.
PAGE
07

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
PRE-INSTALLING RAIL SPLICES
1. Determine the number of rails required per row of modules.
2. Insert a rail splice into one rail. Do not push it past the center bump.
3. Slide the next rail onto the rail splice until the two rail ends meet.
4. Repeat steps 2 and 3 until the desired length is achieved.*
*This is usually easiest to do from the ground.
PAGE
08

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
INSTALLATION OF FLASHING & L-FOOT
• ClickFit for comp shingle roofs uses EcoFasten GF-1 watertight
ashing system.
• Other roof types may use dierent EcoFasten Solar
attachments, visit ecofastensolar.com to learn about other
applications.
INSTALLATION STEPS:
1. Locate rafter lines.
2. Drill 7/32" pilot holes at all attachment points and back ll using roof-compatible sealant.
3. Separate shingles where ashing is to be installed. Insert the ashing so the top portion is under
the next row of shingles north of the pilot hole. Ensure the ashing is pushed to the third-course
of shingle to prevent water inltration through the vertical joints between shingles.
4. Align GF-1 ashing hole with pilot hole. Insert the lag bolt with pre-installed bonded washer
through the L foot and EPDM grommet. Tighten the lag bolt until fully seated. The EPDM Ring
visual indicator is the most eective way to ensure a watertight seal.
*Note the orientation of the L foot and clicker.
The clicker should be facing downslope
PAGE
09
1 2 3

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
INSTALLING TILE HOOKS
1. Locate rafters on the roof, mark the tiles to be removed. Hint: In some cases rafter tails are visible at
the eaves of the roof, making it easy to nd the rough location of the rafters. In other cases, the fascia
board may have nail heads visible where it was attached to the rafters. In the worst-case a row of tiles
may need to be moved to determine the rafter locations.
2. Slide the tile at the desired location upward to expose the roof sub surface. If the tile is to be notched,
or if using a replacement ashing, remove it entirely. Clean the sub surface with a brush to remove any
debris that could aect the sealing.
3. Locate the rafter center and mark it.
4. Place the tile hook with the hook itself in the valley of the next tile below. Drill one 7/32" pilot hole in
the rafter center, taking care to keep the hook in the valley of the tile below. Backll this hole with a
roof- compatible sealant. For at tiles, try to avoid having the hook land directly under a joint between
tiles, this will create a larger gap or more notching than necessary.
5. Install one 5/16" x 4" lag screw on the row of holes closest to the tile hook arm (image 1). If possible,
install the screw in one of the three holes directly next to the arm. If the lag screw must be installed in
one of the seven holes furthest from the arm (denoted by the red rectangle in image 2), install three
deck screws in the pattern shown by the green circles below.
6. Adjust the height of the tile hook as necessary using the bolt shown in image 3.
7. Flash the surrounding area and lag screw head with roof-compatible sealant as necessary. Refer to Tile
Hook Subashing Installation guide on the next page.
8. Replace the tile that was moved and/or removed, or install the tile replacement ashing.
If it is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by
using a chisel.
9. Rail can be leveled using the bolt shown in image 4.
1
3
2
4
PAGE
10

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
TILE HOOK SUB-FLASHING INSTALLATION
TOOLS REQUIRED:
Caulking gun, roong mastic applicator
MATERIALS REQUIRED:
Roong mastic, reinforcing fabric, roof sealant
1. Apply a continuous line of the roong
manufacturer’s approved sealant on the
underside of the ClickFit tile hook sub-
ashing to form a U-shape around the
raised edges.
2. Lower the sub-ashing over the tile
hook base. It may be necessary to move
adjacent tiles to easily lower the sub-
ashing onto the roof deck.
3. Place the sub-ashing over the base of
the tile hook so the ashing covers the
entire base.
PAGE
11
1
1
2
2
3
3

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
TILE HOOK SUB-FLASHING INSTALLATION
1. EcoFasten recommends following the
TRI guidelines three-course sealing
method. Start the three-course sealing
method by applying a layer of roong
mastic over the edges of the tile hook
sub-ashing.
2. Place strips of reinforcing fabric over
mastic to cover approximately 2" from
the edge of the sub-ashing in both
directions. Place strips on the side rst,
then the top edge.
3. Apply a nal layer of mastic to
completely cover the reinforcing fabric.
The ashing is now installed and sealed.
1
1
2
2
3
3
PAGE
12

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
CLICKFIT USING SIMPLEBLOCK-U®
PRE-INSTALLATION:
The SimpleBlock-U can be installed on many dierent standing seam proles. See SimpleBlock-U
Installation Manual for compatible and non-compatible standing seam proles. Be sure that
each standing seam is no thicker than ½" in width.
INSTALLATION:
Position the SimpleBlock assembly on the panel
seam. Make sure the block is fully seated on the
metal seam.
Torque the 2 preinstalled oval point set screws to
150in-lbs using the included 3/16" hex drive.
Included with the block, slide the hex holt into the
channel on top of the SimpleBlock-U assembly.
Place the ClickFit Universal L-Foot over the hex bolt
followed by the serrated ange nut and torque to
150in-lbs.
1
2
3
4
1
3
2
4
1" MIN
1" MIN
1" MIN
1" MIN
FOLDING PROFILES SNAPPING PROFILES
PAGE
13

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
PAGE
14
INSTALLING THE RAIL
1. Place the rail in the Clickers.
2. Ensure the rails extend a minimum of 2”
past the last attachments in each row.
3. Push the rail into the L-foot clicker
starting on the side with the plastic
clips rst, then roll the rail into seated
position. Verify the rail is sitting ush
with both ledges. If attachments
are extremely misaligned it may be
necessary to loosen the leveling bolt
and adjust the height of the L-foot.
Tighten the clamping bolt to 144 in-lbs.
4. Level the rail if necessary by loosening
the bolt attaching the Clicker to the
L-foot or tile hook.
1
2
3
4

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
PAGE
15
INSTALL THE END CLAMPS ON EACH RAIL ON
WHATEVER END YOU ARE STARTING WITH
• Snap the end clamp onto the rail.
• Slide the end cap onto the rail.
• Turn the leg of the end clamp around the cap.
PLACE MODULE
Place the module on the rail, ensuring
the module junction box
is up-slope.*
ALIGN AND TIGHTEN
Slide the module to the end clamp and
align it with the array corners. Tighten
the end clamp to 96 in-lb
MODULE INSTALLATION
1
2
3
1a
1a
1b
1b
1c
1c
2
3

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
PAGE
16
CLICK IT ON
Click a mid clamp onto each rail.
SLIDE IT UP
Slide the mid clamps until they are
ush with the side of the existing
module.
PLACE AND TIGHTEN
Place and slide the next module rmly
against the mid clamps. Align the
bottom edges of the modules. Tighten
mid clamps to 144 in-lb.
INSTALLING ADDITIONAL MODULES
2
1
3
1
2
3

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
INSTALLATION
INSTALLING END CLAMPS
AT THE END OF A ROW
1. Install the last mid clamps in the row.
2. Measure the rails from the last mid clamp to the module width plus 1".
3. Cut the rails at this mark. There is some adjustment in the end cap/clamp so it does not
need to be a perfect cut.
4. Install end clamps and end caps, tighten to 96 in-lb
ALTERNATIVE METHOD:
1. Install the last module in the row, tighten the mid clamps.
2. Using a circular saw with a metal blade, or carefully with a reciprocating saw, cut the rail
approximately 1" past the edge of the last module.
3. Install end clamps and end caps, tighten to 96 in-lb
Replace the tile that was moved and/or removed, or install the tile replacement ashing. If it
is to be notched, mark the tile for notching. Notching can be done with a grinding wheel or by
using a chisel.
PAGE
17

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
GROUNDING
PAGE
18
BONDING PATHS
Bonding paths are carried throughout the array in a variety of ways. They are carried module-to-
module and module-to-rail through mid clamps, carried at rail-to-rail connections through the
splices, and carried row-to-row using module jumpers or grounding lugs with bare copper. For
easy row to row bonding, EcoFasten recommends using our Module jumper.
BONDING AND GROUNDING
MODULE JUMPER
1 module jumper
bonding module to
module and row to row
MID CLAMP
2 mid clamps bonding
pairs of modules
GROUNDING LUG
1 ground lug per
continuous array
RAIL SPLICE
1 splice bonding
adjacent pair of rails

VERSION: v3.0REVISION DATE: 12/2/22
INSTALLATION GUIDE
GROUNDING
PAGE
19
NECESSARY COMPONENTS
One of the following grounding lugs (or any UL 2703 Compliant ground Lug):
• BurndyCL50-1TN Ground Lug (UL 2703 - E3514343 / UL 467-E9999)
• ILSCO SGB-4 Ground Lug (UL 2703 - E354420 / UL 467 - E34440)
• ILSCO GBL-4DBT (UL 2703 - E354420 / UL467 - E34440)
• ILSCO GBL-4DBTH (UL 2703 - E354420 / UL 467 - E34440)
• ILSCO GBL-4SS (UL 2703 - E354420 / UL 467 - E34440)
GROUNDING
*Equipment grounding wire should be sized in accordance with the National Electrical Code, NFPA70
and a minimum of 1/4” clearance is required between bare copper wires and aluminum components.
Other manuals for Clickfit
1
Table of contents
Popular Rack & Stand manuals by other brands

TVILUM
TVILUM 97243 Instruction booklet

Velleman
Velleman WB035 installation instructions

Sanus Systems
Sanus Systems VisionMount VMA202 instruction manual

Triton
Triton Router Track Adaptor Operating/safety instructions

Mobotix
Mobotix HaloMount MX-HALO-EXT-CM Quick install

Blick
Blick BOB ROSS 2-IN-1 EASEL Assembly instructions