manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Ez Log Structures
  6. •
  7. Garden House
  8. •
  9. Ez Log Structures VICTORIA C 40 User manual

Ez Log Structures VICTORIA C 40 User manual

× 60
× 15
× 850
× 110
× 40
5×70
4×506×1401,4X40
M8×70
Ø 3 mm
Ø 4 mm
Ø 5 mm
Ø 8 mm
× 65
4×40
1/24
PREPARE THE GROUND, UNWRAP THE PACKAGE,
LAY OUT THE COMPONENTS, FIND THE TOOLS. VICTORIA C 40
2/24
MAKE SURE THAT THE FOUNDATION
IS INSTALLED ON A LEVEL SURFACE.
CHECKING ALL DIRECTIONS,
INCLUDING CORNER TO CORNER. 3%
LAY OUT THE FOUNDATION BEAMS
AND SQUARE IT BY MEASURING
FROM CORNER TO CORNER.
IFB1
AC
D B
AB=CD
0°
IFB2
IFB3
IFB5
IFB4
× 2× 10
5×70
6×140
Ø 4 mm
Ø 5 mm
3/24
ATTACH FOUNDATION BEAMS
WITH SCREWS.
4%
6×140
5×70
4/24
LAY OUT THE BOTTOM LOGS SO,
THAT DOOR OPENING WILL BE
1441 MM WIDE
5%
2 LG-1
1 LG-1
A BL-1
B BL-1
1441 mm
× 6× 12
5×70
6×140
Ø 4 mm
Ø 5 mm
5/24
ATTACH LOGS TO THE
FOUNDATION.
THE WALL LOGS WILL HANG OVER
THE FOUNDATION BEAMS BY
APPROXIMATELY 5MM. THIS OVERHANG
IS DESIGNED AS A RAIN DRIP. 6%
6×140
5×70
5mm
× 3
5×70Ø 4 mm
× 6
6×140Ø 5 mm
6/24 7%
ATTACH THE NEXT ROW OF
WALL LOGS INTO THE BOTTOM
LOGS WITH SCREWS.
6×140 5×70
A LG-1
B LG-2
7/24 9%
AFTER PLACING 3-4 ROWS OF WALL LOGS, TAP EACH
WALL LOG IN PLACE USING A HAMMER AND THE
HITBLOCK PROVIDED, TO TIGHTEN THE LOGS.
HITBLOCK
1 LG-6
8/24 10%
SLIDE THE DOOR IN,
ATTACH THE HANDLE.
CDD6R
3 LOGS IN PLACE
9/24 22%
DON`T FORGET TO
TIGHTEN THE LOGS AFTER
EVERY 3-4 ROWS.
HITBLOCK
1 LG-3
1 LG-2
B LG-4
B LG-1
10/24
SLIDE THE WINDOWS IN,
ATTACH THE HANDLE.
23%
CDW2L
CDW2R
11/24 46%
2 LG-2
B LG-6
16 LOGS AND
1HALF LOG IN PLACE
B LG-3
1 LG-5
1 LG-7
1 LG-4
× 6
4×50
× 5
5×70
12/24
INSTALL CEILING TRIANGLE
AND ATTACH WITH SCREWS
INTO THE WALLS.
LEAVE 4CM CAP BETWEEN
DOOR AND CEILING DETAIL,
ATTACH IT INTO WALLS AND INTO
CEILING TRIANGLE USING SCREWS 47%
CEILING
DETAIL
40×120
CEILING
TRIANGLE
5×70
4×50
× 40
6×140Ø 5 mm
13/24 52%
ATTACH TOP LOGS INTO
WALL LOGS WITH SCREWS.
B TL-2
2 TL-3
2 TL-1
2 TL-2
A TL-3
A TL-1
A TL-2
A TL-4
1 TL-3
1 TL-1
1 TL-2
B TL-1
B TL-3
B TL-4
14/24 53%
CONNECT THE ROOF PURLINS (RFR)
WITH RD BEFORE INSTALLING THEM
ON TOP OF THE CORNERS. RD
RFR
× 4
6×140Ø 5 mm
15/24 55%
INSTALL THE ROOF PURLINS AND
ATTACH THEM WITH SCREWS.
× 16
5×70Ø 4 mm
× 16
6×140
Ø 5 mm
16/24 58%
INSTALL THE ROOF PURLINS (RFB) AND
ATTACH THEM WITH SCREWS.
RFB2 RFB4
RFB1
RFB3
5×70
6×140
× 408
4×50
17/24 62%
PLACE THE FIRST ROOFBOARD FLUSH
WITH THE END OF THE PURLINS AND
ATTACH WITH SCREWS
RB21
ROOF TOP
× 40
4×40
18/24 86%
INSTALL THE ROOF TOP AND ATTACH IT
WITH SCREWS. ATTACH FASCIA TRIMS
INTO ROOFPURLINS.
RF
× 288
4×50
19/24 87%
SCREW THE FLOORBOARDS INTO
FOUNDATION, SAW THE
LAST BOARD TO MAKE IT FIT.
FB
× 40
1,4x40
20/24 96%
SAW THE BASEBOARDS
AND ATTACH WITH NAILS
AT EVERY 0,5 METERS.
BB

Popular Garden House manuals by other brands

Décor et Jardin GARAGE 28 Assembly Notice

Décor et Jardin

Décor et Jardin GARAGE 28 Assembly Notice

Luoman Lillevilla 578 Assembly and Maintenance

Luoman

Luoman Lillevilla 578 Assembly and Maintenance

Décor et Jardin VALOGRADE Assembly Notice

Décor et Jardin

Décor et Jardin VALOGRADE Assembly Notice

Palram Mythos 6x14-TwinWall Glazing Assembly instructions

Palram

Palram Mythos 6x14-TwinWall Glazing Assembly instructions

Sealey GSS3030.V2 instructions

Sealey

Sealey GSS3030.V2 instructions

Forest garden Overlap Apex Shed ODA68NW quick start guide

Forest garden

Forest garden Overlap Apex Shed ODA68NW quick start guide

oldfields Treco UTZ1015 manual

oldfields Treco

oldfields Treco UTZ1015 manual

Forest LGSTFP instructions

Forest

Forest LGSTFP instructions

Palmako Extension LAZA28-1624 installation manual

Palmako

Palmako Extension LAZA28-1624 installation manual

WAR-LOCK GARDENSHED Gable Series Assembly instructions

WAR-LOCK

WAR-LOCK GARDENSHED Gable Series Assembly instructions

G21 GAH 407 manual

G21

G21 GAH 407 manual

Keter FACTOR 8x8 user manual

Keter

Keter FACTOR 8x8 user manual

Cello Halland 502395046 instruction manual

Cello

Cello Halland 502395046 instruction manual

Luoman LILLEVILLA Inarijoki Assembly and Maintenance

Luoman

Luoman LILLEVILLA Inarijoki Assembly and Maintenance

ALLAN'S Christie Jumbo Workshop 2346 Instructions for assembly

ALLAN'S

ALLAN'S Christie Jumbo Workshop 2346 Instructions for assembly

Yardmaster 66 ZGEY Assembly instructions

Yardmaster

Yardmaster 66 ZGEY Assembly instructions

Palmako Saale installation manual

Palmako

Palmako Saale installation manual

Lemeks Palmako Grace PM56-4529 Assembly, installation and maintenance manual

Lemeks

Lemeks Palmako Grace PM56-4529 Assembly, installation and maintenance manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.