Drill
Stud Finder
Installation
Safety Glasses
Step 1. Locate and Mark Studs (At least one bracket should be installed into a Stud)
Measure
to match
Height
Step 2. Mark hole locations with bracket as template ,Drill Drywall anchor locations
1 /4” or 6mm
Drill bit
1. Place the bracket over stud mark and level.
2. Use the bracket as a template to mark holes. Draw Stud +drywall o
3. Remove bracket and drill holes for drywall anchor locations o
(studs +don’t use drywall anchors/ don’t drill)
4. Insert drywall anchors into holes, tap in if needed. Repeat other side.
Step 3. Fasten brackets, mark and
cut shelf. Fasten shelf. 1.Place brackets onto holes.
Insert 1” screws into drywall anchors
Insert 2.5” Screws into stud locations.
2.Place 8” Shelf on brackets and mark lines for cuts. Cut
shelf to length desired.
-Most hardware stores will do cuts if requested-
Sand and finish shelf as desired.
3. Fasten shelf with 5/8” screws (x8) , Finished.
Stud
Any Issues or questions contact Support@fibrehead.com
Pencil
Most common shelf height
is 4.5 feet or 54” from floor.
Studs are spaced 16” apart.
Level
Drill and Philips bit +
Pencil
Pencil