NOTE
The installation personnel of air conditioning equipment
shall be responsible for ensuring structural integrity of the
roof of RV. Do not create a low-lying place where water will
accumulate on the roof.
Otherwise, stagnant water around may seep into the
vehicle, causing damage to this product and RV.
Placement of Air Conditioner on the Roof
NOTE
The heaviest outdoor unit of this product weighs
about 45Kg. To prevent damage to the air conditioning
equipment, please lift this product to the roof with a crane.
●Take out the outdoor unit of air conditioner in the carton.
●Place the outdoor unit of air conditioner on the roof.
●Lift the equipment (do not drag it) based on the box
sponge of air conditioner, and place it above the prepared
opening with the condenser coil facing the rear of RV, as
shown in the following figure:
Placement after lifting
Front of RV
Do not drag!
NOTE
Do not drag the air conditioner, otherwise the sealing /
noise damping foam on the bottom of the rooftop unit gets
damaged. Failure to comply could lead to water ingress into
the RV.
●Install the air distribution box frame. This frame will fasten
down the rooftop unit. Refer to following figure:
Note: All cardboards should be recycled
●In case any deviation is found at the position of
outdoor unit on the roof during the installation of the
frame,replace the rooftop unit (the sponge on the rooftop
unit must be aligned with the 14⅛" x 14⅛" (362x362mm)
square hole).
Installation of Air Duct and Top Fixing Plate
1. Take out all the parts from the air distribution carton box.
2. Reach into the return air inlet of the rooftop unit and
pull down the wire harness of outdoor unit of the air
conditioner (heat pump model also has four-way valve
connecting wire and sensor lead, and electric heating
model also has electric heating connecting wire) for the
convenience of subsequent connection, as shown in the
following figure:
Measure the
Return air inlet of
air conditioner
Pull down the wire harness
of outdoor unit
3. Measure the thickness from ceiling to roof to select the
appropriate air duct sponge:
–The air divider sponge comes in 3 different heights
⁄”(15mm), 1⁄”(30mm) and 1¾”(45mm)]
NOTE: Remove the supporting at the middle section
of the air divider sponge
–If the distance is 1”-1⁄”(26-30mm), choose the air
duct sponge with a thickness of ⁄”(15mm);
–If the distance is 1⁄”-1⁄”(30-40mm), choose the
air duct sponge with a thickness of 1⁄”(30mm);
–If the distance is 1⁄”-2⅜”(40-60mm), choose the air
duct sponge with a thickness of 1¾”(45mm);
–If the distance is greater than 60mm, the air duct
sponges with a thicknesses of ⁄”(15mm),
1⁄”(30mm) and 1¾”(45mm) shall be used in a
combined manner according to the actual situation;
–If the distance is greater than 3⁄”(100mm),
an optional pipe joint should be used.
Chassis of the outdoor unit of
air conditioner
The sponge in the middle part
should be removed during
installation.
4. Select the correct air duct sponge, remove the middle
part, and paste it on the air distribution box frame along
the air outlet (align sponge with opening), as shown in the
following figure:
English
Rev: 10-18-22 - 5 -