1.53m L x 1.53m W x 1.98-1.83m H
Sloping Roof GARDEN SHED
Parts list
The following parts are included in your shed:
a. 4 x 1830 x 780mm sheets (Back wall and roof)
b. 4 x Sloping sheets, 2 Left and 2 Right (End walls)
c. 1 x narrow 1980 x 715mm sheets (beside door - Front)
d. 1 x 1920 x 780mm sheets (Door sheet)
e. 6 x “U” channels 1515mm long, (Front & Back and Roof)
f. 4 x “U” channels 1485mm long (Side walls)
g. 2 x “U” channels 1920mm (Door sides)
h. 2 x “U” channels 793mm (Door spacers)
i. 2 x “U” channels 780mm (door tops & bottoms)
j. 2 x 1830mm “L” flashings (roof to side flashings)
k. 2 x 1980mm “Z” shaped door jambs, 1 has “U” channel attached to give this shape
for corner door jamb. (Front)
l. 1 x GALVO Door strap - 310mm long
m. 2 x “Z” channels (Door Brace Kit)
n. 1 pack screws and padbolt &
o. 1 pack of Rivets and hinges.
Caution: Some parts have sharp edges and should be handled very careful-
ly. We recommend the use of protective gloves and footwear when assembling.
All dimensions are approximate.
You will need these tools to assemble your shed:
· Battery or electric Drill
· 3.3mm (1/8th inch) Drill bit
· Screwdriver & Riveter
· Tape measure & Ladder
Feel free to phone 0800 ENZEMBLE for an installer near you...
Do not attempt to erect shed in windy weather.
· External Dimensions: 1530mm x 1530mm
· Internal Dimensions: 1485mm x 1485mm
GVO1515
page 2 - GVO1515
Door Assembly
Parts needed:
d. Door sheet
g. Door sides
i. Door tops & Bottoms
l. door strap
o. hinges
Method:
Rivets are better for door assembly
1. Attach (j) door top & bottom to (d) door sheet @ centre ribs only
2. Attach (g) door sides to (d) sheet through (i) @ 4 corners
3. Attach (l) door strap in centre of door sheet slipping under (g) fixing
to sheet ribs and door sides
4. Attach hinges (o) approx 150mm from top and bottom of door
through (g) sides. Fixing should be centred on (g).
5. turn your door over and fix 4 corners thru all “U” channels.
Hanging the Door
Parts needed:
- The door you have just made
c. 2 x narrow sheets
k. 2 x “Z” door jambs
Method:
1. Attach (k) 1980mm “Z”s to narrow sheets (c) on the rib with
the narrow pan.
2. Lay the premade door face down on 1 of the narrow
sheets approx 30mm up from bottom and down from top
3. Check door is centralised on the sheet (top & Bottom). fix
hinges through side of “Z” door jamb (k).
Drawings are diagrammatic and are not
necessarily to detail.
If you choose to vary from these instructions your warranty will be impaired.
Front wall assembly
Parts needed:
- The pre-hung door you have just completed
and 1 padbolt
e. 2 x 1515mm “U” channels
h. 2 x 793mm door spacers
K. 1 x “Z” corner door jamb (Has “U”
channel attached)
Method:
1. Lay down door with the sheet attached
and the corner door jamb (“Z” with the
“U” attached) as shown
2. Cap the sheets with (e) 1515 channels.
Channels will end short of sheeting and
corner door jamb by 10 - 15mm. Higher
side of channel to inside.
3. Attach the (e) 1515 channels to top and
bottom of corner door jamb using (h)
Door spacers to make sure door fits gap
OK (they sit on top of the “Z” jambs).
4. Drill & Fix (Rivet or screw) channels at eve-
ry 2nd rib down thru the top.
5. Attach door spacer at each end thru “Z” door jambs and channels.
6. 3 fixings underneath thru channels into sheeting pan & top and bottom of (g) door spacers
& “Z”s
7. Fit the padbolt to door strap on the outside door using wide flange rivets supplied (or
screws).
(e)
(h)
(h)
(l)
(e)
(j)
page 3 - GVO1515
2: Back Wall
4: End Walls
If you choose to vary from these instructions your warranty will be impaired.
2: Back Wall
A. Join 2 Left (b) sheets together
to give a slope at the top.
B. Cap sheeting with (f) 1485mm
channels.
C. Fix the channels through the
end ribs and every 2nd rib be-
tween.
D. Make sure you put at least 1
fixing per sheet up through the
underside of the channel into
the pan of the sheet.
E. Perform the same again for
the Right side.
(f)
(b)
You need:
· 2 x (f) Channels
· 2 x (b) Sheets
(f)
(b)
(f)
Channels will end
20 - 30mm short
at tops of end
walls and 15 - 20
at bottoms
(a)
You need:
· 2 x (e) Channels
· 2 x (a) Sheets
A. Join 2 (a) sheets together with
2 fixings thru the overlapping
ribs making sure the ends of the
sheets are flush.
B. Cap sheeting with (e) chan-
nels .
C. Fix the channels thru the end
ribs and every 2nd rib between.
D. Make sure you put at least 1
fixing per sheet up thru the un-
derside of the channel into the
pan of the sheet.
(e)
(e)
(a)
3: Roof
(i)
(e)
(a)
(j)
(e)
A. Join 2 (a) sheets together same as
the back.
B. Cap sheeting with (e) 1515mm
channels.
C. Fix the channels every 2nd rib but
not the corners at this stage
D. Place the short flange of (j) the “L”
on top of the rib at 1 end. Make
sure ends are flush with sheeting
and put 1 fixing in the centre to
hold the “L”. Fix the corners thru
the channels and 1 more between
the corner and the centre fixing.
Perform the same at the other
end. 5 fixings ea “L”
You need:
· 2 x (e) Channels
· 2 x (a) Sheets
· 2 x (i) “L”s
page 4 - GVO1515
Well done you have finished the panels….
Points to note as you construct your shed:
· Do not attempt to assemble panels in windy conditions
· Make sure your foundations are squared and level before erecting panels.
· It is easier to remove all swarf (filings) before you stand your walls up
· Complete all panels before erecting your shed.
· Keep a firm grip on panels when handling. If they slip they will cause damage.
· Always wear non slip gloves protective footwear and eyewear.
5: Now to join your corners and put your roof on….
1st: Stand up the back wall and as your helping hand is holding it up bring the one end wall into meet it at
the left corner overlapping the corners as Fig 1. Drill & Fix at approx 100mm down from the top and up
from the bottom drilling and fixing from the outside.
2nd: Bring the other end wall into the right back corner and perform the same again checking to make sure
the walls are sitting flat at the bottom
3rd: Bring the front wall into place and join the front corners to the end walls same as the back.
4th: Finish joining corners by fixing at approx 300mm apart. You will find it easier to drill these
corners if they are supported on the inside. Use the handle end of a hammer into the in-
side of the corner, but beware of drilling holes in the end of your hammer.
5th: With a person at each end of the roof, waft it over top of your upright walls and lower
down on top with an overhang that looks best to you. At the left end fix thru the “L” flash-
ing into the top channel of the left end wall. Measure the overhang at the back and fix the
right end “L” to the right end wall with the same overhang as the Left end. If the roof is
difficult to get to the same overhang at each end this will be caused by unlevel site or walls
are not square. Adjust accordingly. Fix “L”s at 300mm’s apart.
6th: Using your ladder and tape measure, fix down thru the top of the roof, thru the pan into
the top channel of front and back walls. (10mm more than the overhang). Fix beside every
2nd rib. (Fig 2). You will not need to worry about these fixings leaking as any water seeping
thru these fixings will end up on the outside of the walls.
7th: Attach padbolt to door strap if not already done so. Check that all swarf is removed and
most importantly….
8th: Fix your shed down to its foundations. If your foundations are unlevel or bowed, you will
have problems with your padbolt and door levels. This can be fixed by slipping a spade un-
der either door jamb and lifting. You will soon get a feel for which side needs propping up.
Well done!
If you choose to vary from these instructions your warranty will be impaired.
Recessed floor clamps
For especially poured floors
with recess around perimeter.
Flat floor clamps
For existing concrete only.
Water can seep underneath.
Fig 1
Fig 2
It is utmost essential that every shed has
a floor, but the only way to make sure
your shed is there to stay on windy sites is
with a recessed concrete floor and phone
0800 80 SHED for more free advise.
1. The door braces can be fitted now that you have assembled your shed.
2. Tuck one end of the 'Z' between the bottom channel of the inside of the
door and the sheet. Do the same at the top, overlapping in the centre be-
hind the padbolt. If you have a locking 'T' handle you will have to run the 'Z's
the opposite way to the diagram.
3. Rivet the 'Z's at the ends, and in the centre of the channel it is tucked un-
der, and through the overlap in the centre. Two or three more rivets will be
required through the door sheeting into the 'Z', but they will need to be riv-
eted through from the outside of the door for a neater appearance.
4. You may need to cut or bend the flange at the bottom and the top of the
'Z' if it catches on the door jamb when opening or closing (diagram 1).

Popular Garden House manuals by other brands

Lemeks Palmako FR40-3131 Assembly, installation and maintenance manual

Lemeks

Lemeks Palmako FR40-3131 Assembly, installation and maintenance manual

Palmako Betty PA-3030 installation manual

Palmako

Palmako Betty PA-3030 installation manual

Palmako EL18-6774-1 installation manual

Palmako

Palmako EL18-6774-1 installation manual

Shire Abri Apex Assembly

Shire

Shire Abri Apex Assembly

Reynolds Building Systems Sentry Buildings West Virginia Assembly Book

Reynolds Building Systems

Reynolds Building Systems Sentry Buildings West Virginia Assembly Book

Palmako Element House EL18-5658 installation manual

Palmako

Palmako Element House EL18-5658 installation manual

Vision S-8070-A owner's manual

Vision

Vision S-8070-A owner's manual

Solid Build ASPEN Assembly instructions

Solid Build

Solid Build ASPEN Assembly instructions

Palmako FR34-3857-1 installation manual

Palmako

Palmako FR34-3857-1 installation manual

Backyard Products Heartland MANSFIELD GABLE manual

Backyard Products

Backyard Products Heartland MANSFIELD GABLE manual

Mercia Garden Products 03DTSHPN0806PA-V1 General instructions

Mercia Garden Products

Mercia Garden Products 03DTSHPN0806PA-V1 General instructions

Pergola kits USA PREMIUM VINYL PAVILION Assembly manual

Pergola kits USA

Pergola kits USA PREMIUM VINYL PAVILION Assembly manual

Palmako FRC28-3025FSC installation manual

Palmako

Palmako FRC28-3025FSC installation manual

Forest OPASUM75M instructions

Forest

Forest OPASUM75M instructions

Forest garden CSHSL66 quick start guide

Forest garden

Forest garden CSHSL66 quick start guide

Gartenpro PAVILON 1718 manual

Gartenpro

Gartenpro PAVILON 1718 manual

tradetested GS511-V1 Owner's manual and assembly instructions

tradetested

tradetested GS511-V1 Owner's manual and assembly instructions

Simply Log Cabins PA44-3030 installation manual

Simply Log Cabins

Simply Log Cabins PA44-3030 installation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.