manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. HAGS
  6. •
  7. Play Set & Playground Equipment
  8. •
  9. HAGS eXigo Xi001S User manual

HAGS eXigo Xi001S User manual

1 / 30
Xi001 eXigo Issue F 21/08/2017
Installation Instructions
eXigo
Xi001S, Xi001B
© Playpower Inc
E-post:[email protected]
www.hags.com
Xi001 eXigo Assembly Sequence and Installation Information
Please read this installation guide in its entirety prior to commencing any installation works
Assembly Instructions.
1. Excavate foundations in accordance with the individual Footing & Setting Out Drawings.
2. Assemble the components in the previously excavated foundations. Using the Resistorx driver secure all xings. (Refer to individual 3D exploded views)
3. Backll foundations with concrete (4:2:1 mix)
Notes.
• The Maximum Free Height of Fall for eXigo is 0.6m
• The Falling space for eXigo is 8.99m x 8.50m
• Constructional space requirements 15m x 15m
• Foundation detail is assuming good ground conditions. Care should be taken concerning abnormal ground conditions.
• Check tightness of bolts following a two week run-in period.
• Replacement components must comply with Hags specications.
• Warning - some of these components may exceed the single persons lifting allowance.
• Ensure equipment is protected from usage throughout installation, maintenance and repair.
• Touch-up any damaged paintwork using the Hags touch-up paint provided. Ensure affected areas are rubbed down and primed as required.
• Once the installation is complete check all bolts are fully secure and clear the site of any debris.
• Ensure level surface below all equipment.
Assembly aids should be removed prior to the equipment being used
2 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Complete Assembly (Rubber bollards omitted)
Note: The HDPE panels illustrated are an optional extra and
may not be part of the system to be installed.
Central Deck base plate profile
aids in the positioning of the
Wobble board, Pivotpad & Seesaw
board spokes
Wave Walk Assembly
Seesaws Board Spoke Assembly
Plank Walk Assembly
Pivot Pad Spoke Assrmbly
Rope Bridge Assembly
Central Deck assembly
Wobble Walk Spoke Assembly
3 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Footing Setting Out (excludes bollards)
All footings 300 x 300mm
Depth in accordance with diagram below
If the installation is with loose fill type surfacing the legs of the system should be marked with a
“Basic level mark” to indicate the recommended “Finished surface level” (F.S.L.) of the surface.
Using masking tape, paint a 10mm wide mark around each leg with paint provided.
Min 300mm L.I.A.S.
F.S.L.
4:2:1 Mix Backfill
4:2:1 Mix Backfill
Min 100mm Compacted M.O.T.
40mm Thick Wetpour
4 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Bollard Setting Out Drawing
If the installation is with loose fill type surfacing the legs of the system should be marked with a
“Basic level mark” to indicate the recommended “Finished surface level” (F.S.L.) of the surface.
Using masking tape, paint a 10mm wide mark around each leg with paint provided.
RYBL200 200mm Rubber Bollard
Key to Bollards
A
RYBL300 300mm Rubber Bollard
B
RYBL400 400mm Rubber Bollard
C
144
TYPE 2
Bark
144
TYPE 1
Sand
0,0 0,0
144
TYPE 5
Grass mat
144
TYPE 3
Synthetic
750
550
850
450 100
All footings 300 x 300mm
Depth in accordance with diagram below
5 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Elevation Dimensions
It is essential that, for reasons of conformity to EN1176, the above
elevation dimensions are not exceeded.
Panel Height
Stepping Post Height
Finished Surface Level
1200
580
6 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wetpour Setting Out Drawing
Requires 64m² Wetpour @ 40mm
Thick
7 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Grassmatt Setting Out Drawing
Requires 74.25m² Grassmatt
8 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Central Deck Assembly (Xi005)
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated footings
(see footing layout for details).
2. Once the rest of the system has been correctly assembled back
ll footings with Concrete @ 4:2:1 mix.
10931000 6 No M10 T-Nut
804420 Central Deck Polydek
10121020 6 No M10 x 20 Resistorx
c/w 10301001M10 Nylon Washer
804312 Central Deck Support
10251040 3 No M10 x 50 Hex Head Bolt
804406 Central Deck Base Board
10271000 M10 Plain Nut
Code Description No O
804312 Central Deck Support 1
804406 Base Board 1
804420 Central Deck Polydek 1
1021020 M10 x 20 Resistorx 6
10251040 M10 x 40 Hex Head Bolt 3
10271000 M10 Plain Nut 3
10301001 M10 Nylon Washer 6
10931000 M10 Blank T-Nut 6
Xi005 eXigo Central Deck
9 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Pivot Pad Spoke Exploded View (Xi006)
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated footings
(see footing layout for details).
2. Once the rest of the system has been correctly assembled back
fill footings with Concrete @ 4:2:1 mix.
804304 Main upright
804316 Low Upright
804108 Large pivot pad assembly
See “Sub Assemblies”
804302 Main Spoke
804107 Medium Pivot pad assembly
See “Sub Assemblies”
804109 Small Static Board assembly
See “Sub Assemblies”
10121030 M10 x 30 Resistorx
c/w 10301001 M10 nylon washer
10121020 M10 x 20
Resistorxc/w 10301001
M10 nylon washer
804434 Neoprene gasket
10301004 M10 x 20 barrel bolt
804443 Spacer Washer
10121020 M10 x 20 Resistorx
c/w 10301001 M10 nylon washer 10931000 M10 T-nut
Code Description No Off
804107 Medium Pivot Pad Assembly 1
804108 Large Pivot Pad Assembly 1
804109 Small Static Board Assembly 1
804302 Main Spoke 2
804304 Main Upright Post 1
804316 Low Upright Post 1
804421 Step Polydek 1
804434 Elliptical Neoprene Gasket 8
804443 5mmThick Spacer Washer 12
10121020 M10 x 20 Resistorx 15
10121030 M10 x 30 Resistorx 4
10301001 M10 Nylon Washer 19
10301004 M10 x 20 Barrel Bolt 12
10931000 M10 Blank T-Nut 3
Xi006 Pivot Pad Spoke
804421 Step polydek
10 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Pivot Pad Spoke Assembled View (Xi006)
11 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Seesaw Spoke Exploded View (Xi007)
Code Description No Off
804110 Medium Seesaw Board Assembly 1
804109 Small Static Board Assembly 1
804111 Large Seesaw Board Assembly 1
804302 Main Spoke 2
804304 Main Upright Post 1
804316 Low Upright Post 1
804421 Step Polydek 1
804434 Elliptical Neoprene Gasket 8
804443 5mmThick Spacer Washer 12
10121020 M10 x 20 Resistorx 15
10121030 M10 x 30 Resistorx 4
10301001 M10 Nylon Washer 19
10301004 M10 x 20 Barrel Bolt 12
10931000 M10 Blank T-Nut 3
Xi007 Seesaw Board Spoke
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated footings
(see footing layout for details).
2. Once the rest of the system has been correctly assembled back
fill footings with Concrete @ 4:2:1 mix.
804304 Main upright
804316 Low Upright
804111 Large Seesaw Board assembly
See “Sub Assemblies”
804302 Main Spoke
804110 Medium Seesaw Board assembly
See “Sub Assemblies”
804109 Small Static Board assembly
See “Sub Assemblies”
804434 Neoprene gasket
10301004 M10 x 20 barrel bolt
804443 Spacer Washer
10121020 M10 x 20 Resistorx
c/w 10301001 M10 nylon washer
10121030 M10 x 30
Resistorxc/w 10301001
M10 nylon washer
10121020 M10 x 20
Resistorxc/w 10301001
M10 nylon washer
10931000 M10 T-nut
804421 Step polydek
12 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Seesaw Spoke Assembled View (Xi007)
13 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wobble Board Spoke Exploded View (Xi008)
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated footings
(see footing layout for details).
2. Once the rest of the system has been correctly assembled back
fill footings with Concrete @ 4:2:1 mix.
804304 Main upright
804316 Low Upright
804112 Wobble Board assembly
See “Sub Assemblies”
804302 Main Spoke
10121030 M10 x 30 Resistorx
c/w 10301001 M10 nylon washer
10121020 M10 x 20
Resistorx c/w 10301001
M10 nylon washer
10931000 M10 T-nut
804434 Neoprene gasket
10301004 M10 x 20 barrel bolt
804443 Spacer Washer
10121020 M10 x 20 Resistorx
c/w 10301001 M10 nylon washer
Code Description No Off
804112 Wobble Board Assembly 1
804302 Main Spoke 2
804304 Main Upright Post 1
804316 Low Upright Post 1
804421 Step Polydek 1
804434 Elliptical Neoprene Gasket 6
804443 5mmThick Spacer Washer 8
10121020 M10 x 20 Resistorx 11
10121030 M10 x 30 Resistorx 4
10301001 M10 Nylon Washer 15
10301004 M10 x 20 Barrel Bolt 8
10931000 M10 Blank T-Nut 3
Xi008 Wobble Board Spoke
804421 Step polydek
14 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wobble Board Spoke Assembled View (Xi008)
15 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wave Walk Exploded View No 1 (Xi011)
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated
footings (see footing layout for details).
2. Once the rest of the system has been correctly
assembled backfill footings with Concrete @ 4:2:1 mix.
804113 Wavewalk End Post
assembly (2 No)
See “Sub Assemblies”
804306 WaveWalk End
Support Beam (2 No)
804307 WaveWalk
Centre Support Post
804305 WaveWalk
Centre Support Beam
10121020 M10 x 20 Resistorx (8 No)
c/w 10301001 M10 Nylon Washers (8 No)
10121020 M10 x 30 Resistorx 10931000 M10 Blank T-Nut
804417 Hinge Pin
10281001 M10 Kinmar Nuts
804426 WaveWalk Polydek (3 No)
Code Description No Off
804113 WaveWalk End Post Assembly 2
804305 WaveWalk Centre Support Beam 1
804306 WaveWalk End Support Beam 2
804307 WaveWalk Centre Support Post 1
804417 WaveWalk Hinge Pin 5
804426 WaveWalk Polydek 3
10121020 M10 x 20 Resistorx 12
10121030 M10 x 30 Resistorx 15
10301001 M10 Nylon Washer 27
10931000 M10 Blank T-Nutt 12
10281001 M10 Kinmar Nuts 10
Xi011 WaveWalk
16 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wave Walk Exploded View No 2 (Xi011)
804417 Hinge Pin
10281001 M10 Kinmar Nuts
17 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Wave Walk Assembled View (Xi011)
18 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Rope Bridge Exploded View (Xi009)
Assembly Sequence: -
1. Assemble unit as indicated in the previously excavated footings (see
footing layout for details).
2. Once the rest of the system has been correctly assembled back fill
footings with Concreete @ 4:2:1 mix.
3. Allow concrete to cure before fitting the rope nets
10301004 M10 x 20 Barrel Bolt 1804443 Spacer Washer
804304 Main upright
804302 Main spoke
804317 Spacer bar
804434 Gasket
804434 Gasket
804300 Rope
connector bracket
10121020 M10 x 20 Resistorx
c/w 10301001 Nylon washer
10121030 M10 x 30 Resistorx
c/w 10301001 Nylon washer
Code Description No Off
804300 Rope Connector Bracket 6
804302 Main Spoke 2
804304 Main Upright Post 2
804317 Rope Spacer Bar 2
804434 Elliptical Neoprene Gasket 8
804443 5mmThick Spacer Washer 12
804500 Rope Bridge Net 1
10121020 M10 x 20 Resistorx 12
10121030 M10 x 30 Resistorx 4
10251030 M10 x 30 Hex Head Bolt 4
10271000 M10 Plain Nut 4
10301001 M10 Nylon Washer 16
10301004 M10 x 20 Barrel Bolt 12
Xi009 Rope Bridge
19 / 30
Xi001 eXigo Issue F 21/08/2017
RP001 eXigo Rope Bridge Assembled View (Xi009)
Allow 60 hours for the concrete to
cure prior to fitting the rope net
804500 Rope Bridge Net
20 / 30
Xi001 eXigo Issue F 21/08/2017

This manual suits for next models

1

Other HAGS Play Set & Playground Equipment manuals

HAGS UniPlay Nahoj User manual

HAGS

HAGS UniPlay Nahoj User manual

HAGS Zip rail User manual

HAGS

HAGS Zip rail User manual

HAGS NRG Okavango Swamp User manual

HAGS

HAGS NRG Okavango Swamp User manual

HAGS Slackline 3M User manual

HAGS

HAGS Slackline 3M User manual

HAGS UniPlay Zion User manual

HAGS

HAGS UniPlay Zion User manual

HAGS NRG North Peak User manual

HAGS

HAGS NRG North Peak User manual

HAGS NRG Bermuda Triangle User manual

HAGS

HAGS NRG Bermuda Triangle User manual

HAGS Wobbly climb User manual

HAGS

HAGS Wobbly climb User manual

HAGS Castle slide 1,5m User manual

HAGS

HAGS Castle slide 1,5m User manual

HAGS NRG Galdhopiggen User manual

HAGS

HAGS NRG Galdhopiggen User manual

HAGS NRG Gaping Ghyll User manual

HAGS

HAGS NRG Gaping Ghyll User manual

HAGS 8072023 User manual

HAGS

HAGS 8072023 User manual

HAGS UniPlay Denali User manual

HAGS

HAGS UniPlay Denali User manual

HAGS Castle slide 1,5m User manual

HAGS

HAGS Castle slide 1,5m User manual

HAGS UniPlay Yellowstone User manual

HAGS

HAGS UniPlay Yellowstone User manual

HAGS Zip rail User manual

HAGS

HAGS Zip rail User manual

HAGS Lillie w Dolly User manual

HAGS

HAGS Lillie w Dolly User manual

HAGS Lillie Expansion module w Katja User manual

HAGS

HAGS Lillie Expansion module w Katja User manual

HAGS Castle slide 1,5m User manual

HAGS

HAGS Castle slide 1,5m User manual

HAGS Merryl User manual

HAGS

HAGS Merryl User manual

HAGS UniPlay Congaree User manual

HAGS

HAGS UniPlay Congaree User manual

HAGS Uniplay Playpanel User manual

HAGS

HAGS Uniplay Playpanel User manual

HAGS SWINGO User manual

HAGS

HAGS SWINGO User manual

HAGS UniPlay Melax User manual

HAGS

HAGS UniPlay Melax User manual

Popular Play Set & Playground Equipment manuals by other brands

PLAYSTAR Grand Slam Silver Safety Guide & Assembly Instructions

PLAYSTAR

PLAYSTAR Grand Slam Silver Safety Guide & Assembly Instructions

Little Tikes 630293 Assembly instructions

Little Tikes

Little Tikes 630293 Assembly instructions

Sove 8200 Assembling manual

Sove

Sove 8200 Assembling manual

Trigano LOUISE manual

Trigano

Trigano LOUISE manual

Europlay G570 A Assembling manual

Europlay

Europlay G570 A Assembling manual

stilum multiplay gravis 4A Mounting instructions

stilum

stilum multiplay gravis 4A Mounting instructions

BOERPLAY Tower in hexagone manual

BOERPLAY

BOERPLAY Tower in hexagone manual

Plum 25074AB108 Assembly instructions

Plum

Plum 25074AB108 Assembly instructions

FUNKY MONKEY BARS CARGO NET Assembly instructions

FUNKY MONKEY BARS

FUNKY MONKEY BARS CARGO NET Assembly instructions

SportsPlay 511-111 instruction sheet

SportsPlay

SportsPlay 511-111 instruction sheet

SportsPlay MUSHROOM KOTTAGE Assembly plan

SportsPlay

SportsPlay MUSHROOM KOTTAGE Assembly plan

Pure Fun 9337SS product manual

Pure Fun

Pure Fun 9337SS product manual

MD SPORTS AWH060 038M Assembly instructions

MD SPORTS

MD SPORTS AWH060 038M Assembly instructions

NI Climbing Frames Las Vegas Commercial Climbing Frame instruction manual

NI Climbing Frames

NI Climbing Frames Las Vegas Commercial Climbing Frame instruction manual

SportsPlay 301-146 10' MGR installation instructions

SportsPlay

SportsPlay 301-146 10' MGR installation instructions

Goldmedal HHOP-IT-UP instruction manual

Goldmedal

Goldmedal HHOP-IT-UP instruction manual

Swing King Noortje Assembly instructions

Swing King

Swing King Noortje Assembly instructions

PLAYTIVE JUNIOR 309490 Assembly, operating and safety instructions

PLAYTIVE JUNIOR

PLAYTIVE JUNIOR 309490 Assembly, operating and safety instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.