2 Data sheet “Haiger” Rope Assault Course psrt no. 4591
1. Space required: 3,10 x 0,80 m resp. depending on the play equipment (see top views) 6,10 x 3,10
m resp. 6,10 m x 4,70 m including safety distance,
Maximum height of fall: 1,00 m.
Attention: For several play equipments the installation angle needs to be at least 90°,-
larger angle will be even better !!!! (see sheet no. 14)
Imortant! For play equipment part 4591-1 (swing seats) it has to be considered to mount
adjoining parts in one row (not at angle)!
Images (individual drawings) are not true to scale!!
2. Required surface:
Ground surface
material
Description
mm
Minimum
thickness of
layer mm
Maximum
height of fall
mm
Lawn/top soil <= 1000*
Chipped bark Grain size 20 – 80 400 <= 3000
Wood chippings Grain size 5 – 30 400 <= 3000
Sand Grain size 0,2 – 2 400 <= 3000
Gravel Grain size 2 – 8 400 <= 3000
Other ground surface
materials
Like tested according to
HIC
*In Germany, lawn is a sufficient ground surface in the safety zone for heights of up to
1,50 m.
3. Name and complete dimansion of the largest part of the equipment:
Per equipment: 2 steel posts Ø 102 mm, 2,00 m long
4. Intended age group: 2 years and up
Attention! Equipment to be embedded in concrete
Concrete: C20/25 (B25)
Concrete requirement: ~ 0,50 m³
Size of excavation and foundation (per equipment):
2 x 0,60 m long x 0,60 m wide, total depth 0,80 m incl. 10 cm percolation layer.
2 x 0,60 m long x 0,60 m wide x 0,40 m high, upper edges of concrete are rounded.
Upper edges of concrete are rounded! Foundation sizes apply for regular soil
classification 4-5 (grown surface).
Soil classification 4: Light up to medium plasticity, interlaced, with little sediment
(proportion < 30 % larger than 63 mm grain size in diameter)
Soil classification 5: Grounds of soil classification 3 and 4 with more
sediment (proportion > 30 % larger than 63 mm grain size in diameter)
For safety reasons, foundations of sandy, soft grounds should be layered with a larger
surface of at least 50%.
5. Assembly time once steel masts are embedded in concrete:
Appr. 45 minutes (per equipment !!!). Number of persons required: 2 .
Scope of supply does not include: Sidewalk slab (concrete slab ~ 250 x 250 mm)
Accessories required: Small excavator, standard tools like for example water