
IM-PM500
INSTALLATION AND ASSEMBLY INFORMATION
ASSEMBLY SEQUENCE
www.manufacturasdeportivas.com
EQUIPMENT FOR BUILDING-IN:
1.
2.
3.
4.
5.
EQUIPMENT FOR SCREWING:
1.
2.
3.
GENERAL ASSEMBLY INSTRUCTIONS: GENERAL VIEW
IMPACT SURFACE -
IDENTIFICATION AND COMPONENTS
06/10/2023
Make the shoes by making 500x500x500mm holes on the ground
or according to the sketch attached.
Insert the parts into the holes and level.
Screw the parts using the screws supplied and then tighten.
Fill the shoes with concrete according to the sketch attached.
Wait for the concrete to set for 24 hours.
Put the parts in their place and then level.
Screw the parts with the screws supplied and then tighten.
Drill the holes on the ground with a Ø12 widia bit, insert M10 split
(not supplied) and then tighten. The spit length depends on the
concrete-slab thickness.
Finish with safety floor or protective material against falls.
Check all safety plugs. Check for no packaging waste.
Check the conditions of the entire park.
Common tools are needed for the installation: a set of
spanners, box spanners, wrench, hammer, binders,
torque wrench, leveller and general construction tools.
CASTRO
PLAYGROUND
Ref:
Description:
FREE FALL HEIGHT: 1500MM
ACCORDING TO THE EN-1176 STANDART:
This game does require safety floor.
Date: Rev: 0
IMP-4208 Rev: 5 2010-Nov-26
1/2
49.10m²
MARK QUANTITY DESCRIPTION
1 1 SWING WITH 1 FLAT SEAT
2 1 METAL BAR
3 1 SLIDE H=1.5m
4 1 ROOF
5 1 CLIMBING ROPE UNIT
5
1
2
43
7899
8609
1500
3478
900
480
500
6840
2640
2817