PlayActive Monkey Ring Kit Instruction Manual

Building Instructions
Show With Compo e ts
(Purchase Separately):
(1) Climbi g Rope (PS 7828)
(1 set) Climbi g Rocks (PS 7830)
PS 7744
(2) 4" x 4" x 8'
(3) 2" x 6" x 8'
(1) 5/4" x 6" x 10'
(2) 5/4" x 6" x 8'
(5) 2" x 4" x 8'
(140) #8 x 2¹₂" Deck Screws
Call Toll Free 1-888-752-9782
Customer Service: Monday - Friday, 8:00 A.M. to 5:00 P.M. C.S.T.
We’re Here To Help!
Play Actio
®
Important!
Intended for residential use by children ages 2 to 10, only
on properly installed PlayStar playsets. Before use refer to
complete safety guidelines in your original playset, at
www.playstarinc.com, or at 1-888-752-9782.
Warning!
Only one child, for each single planned seat or single
planned activity should be allowed on this set at one time,
with a maximum weight of 105 pounds for each child.
Lumber a d Screw
Requireme ts
Yo r tower may be different than shown. When adding to a PlayStar
Playset, follow the instr ctions incl ded in yo r original b ilding kit.

281/2" Cut to fit your tower size
Monkey Ring Kit contains:
(6) Monkey Rings
(6) Chains
(6) Monkey Ring Hangers
(6) Quick inks
Weather-resistant hardware
CONTENTS TOOLS REQUIRED
Socket Wrench
⁷₁₆" & ⁹₁₆" Socket
Adjustable Wrench
adder
Tape Measure
Safety Glasses
Drill
Square
Phillips Screwdriver
Saw
Hammer
¹₈" & ¹₄" Drill Bit
Pencil
MONKEY RING
CUTTING GUIDE
HARDWARE INCLUDED (show actual size)
MEASURE, MARK, A D IDE TIFY ALL LUMBER BEFORE CUTTI G. CUT ALL LUMBER BEFORE BEGI I G CO STRUCTIO .
96"
4" x 4" x 8' – two (2) boards required
2 Posts
Boards 1 - 2
93"
96"
2" x 6" x 8' – three (3) boards required
Beam Cap
Top Support Top Header
Beam
Board 1
Board 2
Board 3
60" 18" 18"
2" x 4" x 8' – five (5) boards required
Step Step Step
Boards 1 - 2
Board 3
281/2" 281/2" 281/2"
5/4" x 6" x 10' – one (1) board required
5/4" x 6" x 8' – two (2) boards required
13/
4"
STAKE
Note: For stake angle cut,
measure 13/4"from straight cut. Draw a line
from measurement to center of straight cut.
13/
4"
Wall Support Stake Stake
Wall Base Step Step Filler
Board 4
41" 281/2" 211/2"
Wall Base Step
Board 5
41" 281/2"
Wall Decking Wall Decking Wall Decking
Board 1 - 2
281/2" 281/2" 281/2"
Wall Decking Wall Decking Wall Decking Wall Decking
Board 1
281/2" 281/2" 281/2" 281/2"
Page 1
Note: C t the
remainder of this
board to the width
of yo r tower where
the Monkey Ring Kit
will be installed.
³|₈" x 3" Lag Screw (14) ¹|₄" x 1¹|₂" Lag Screw (12)
³|₈" Washer (14)

1. Attach one 2" x 6" x 96"
beam cap to one 2" x 6" x 93"
beam at dimensions shown. Secure
with eight #8 x 2¹₂" deck screws
equally spaced. (Fig.1)
Note: The beam cap must overhang both
ends a minimum of 1
¹₂
" and both sides
approximately 2". (Fig.1)
2. Using a monkey ring hanger as a template, mark the beam
and drill two ¹₈" holes 1¹₂" deep at each location. (Fig.1)
Note: Dimensions are to CENTERof Ring Hanger.
3. Install six monkey ring hangers and six chains with two ¹₄" x 1¹₂" lag screws each. (Fig.1)
Note: DO NOT connect the yellow mon ey rings until the playset has been properly installed
and is ready for use.
11/2"
Fig. 1
Fig. 2
4. ay two 4" x 4" x 96" posts 28¹₂" apart and
attach four 2" x 4" x 28¹₂" steps at dimensions
shown. Make sure the assembly remains square
while securing with #8 x 2¹₂" deck screws (Fig. 2)
Detail of Screw Placement
Predrill –
1/8" Dia. for #8 x 21/2" deck screws
2" x 6" x 93"
2" x 6" x 96"
61/2"
16"
16"
16"
16"
16"
61/2"
93"
2"
••
••
••
••
••
••
••
••
••
••
••
••
••
••
••
••
4" x 4" x 96"
4" x 4" x 96"
2" 4" 281/2"
2" 4" 281/2"
2" 4" 281/2"
2" 4" 281/2"
A
A
A
A
A
A
A
A
48"
281/2"
181/2"
331/4"
Page 2
A
90˚
BUILDING INSTRUCTIONS
Before starting to b ild yo r Play Action Set, make s re all
boards are c t and identified by size and name.

Fig. 3
5. Flip the step assembly over and attach one 2" x 4" x 28¹₂" step at dimension shown. Be sure step is
square with 4" x 4" posts. Secure step with eight #8 x 2¹₂" deck screws. (Fig. 3)
6. Attach one 2" x 6" x 28¹₂" top support flush with top edge and outside of 4" x 4" posts. Be sure top
support is square with 4" x 4" posts. Secure support with eight #8 x 2¹₂" deck screws and two ³₈" x 3"
lag screws with washers. (Fig. 3)
Fig. 4
7. Install two 2" x 4" x 41" base boards to the bottom step
of monkey ring support. Use a 2" x 4" x 18" stake for a
temporary spacer to create proper alignment. Note:
These sta es will be installed here permanently at
a later step. Be sure base boards are square with
monkey ring support. Secure with two #8 x 2¹₂" deck
screws each. (Fig. 4)
8. Install two 2" x 4" x 60" wall supports. Position boards
under top step of monkey ring assembly and flush
with the bottom base boards. Keep assembly square.
Secure the top end of wall support boards with
two #8 x 2¹₂" deck screws and one ³₈" x 3" lag screw
each. Secure the bottom end of wall support boards to
the base boards with two #8 x 2¹₂" deck screws each.
(Fig. 4)
9. Install one 2" x 4" x 21¹₂" step filler flush with top and
between the top steps. Secure with three #8 x 2¹₂"
deck screws equally spaced each side. (Fig. 4)
Details of Screw Placement
Predrill –
1/8" Dia. for #8 x 21/2" deck screws
1/4" Dia. for 3/8" x 3" lag screws
Predrill –
1/8" Dia. for #8 x 21/2" deck screws
1/4" Dia. for 3/8" x 3" lag screws
G
D
••
••
2"4"281/2"
A
••
••A
2" 6"281/2"
••
••
•
••
••
•
B
B
48"
2" 4"211/2"
2" x 4" x 60"
2" x 4" x 60"
2" x 4" x 41"
2" x 4" x 41"
G
G
D
D
D
D
•
•
Page 3
90˚
Details of Screw Placement
A B
90˚

16. Fasten Monkey Rings to
chains using quick link
connectors. Tighten securely
with an adjustable wrench.
(Fig. 7)
10. Install one top header (2" x 6" x your tower
width) flush with top and outside of 4" x 4"
posts. The top header must be 8' as shown.
Secure with eight #8 x 2¹₂" deck screws
and two ³₈" x 3" lag screws with washers.
(Fig. 5)
11. Position monkey ring support
approximately eight feet from tower
opening. Install beam assembly in
the center of tower opening and
monkey ring support. Attach with
one #8 x 2¹₂" deck screw and secure with
four ³₈" x 3" lag screws and washers each
end. (Fig. 5)
12. Install two 2" x 4" x 18" ground stakes between
base boards and 4" x 4" posts as shown. Install
two 2" x 4" x 18" ground stakes at a 30° angle on
inside of base boards approximately 3¹₂" from end (outside
dimensions of wall support must be 21¹₂"). Secure with four
#8 x 2¹₂" deck screws each. (Fig. 5)
Fig. 7
Detail
Fig. 6
13. Install ten 5/4" x 6" x 28¹₂" wall decking. Hold
wall supports at 21¹₂" apart (measured outside
to outside). (Fig. 6)
14. Place first board tight against bottom of top
step with equal overhang on both sides,
approximately 3¹₂". Secure with four
#8 x 2¹₂" deck screws. (Fig. 6)
15. Install next board tight against first, keeping
21¹₂" measurement and secure with #8 x 2¹₂"
deck screws. Repeat for remaining boards.
(Fig. 6)
Fig. 5
Detail of Screw Placement
Predrill –
1/8" Dia. for #8 x 21/2" deck screws
211/2"
Page 4
E
E
211/2
"
E
E
E
E
E
E
E
E
E
5/4" 6" 281/2"
Predrill –
1/8" Dia. for #8 x 21/2" deck screws
1/4" Dia. for 3/8" x 3" lag screws
B
Detail of Screw
Placement
A PlayStar Tower shown.
Your Tower may be different.
8'
B
B
17. When installing the optional
Climbing Rope (PS 7828) or
Climbing Rocks (PS 7830),
follow the instructions
included with the item.
COMPONENTS
Mou ti g
I structio s
Note: Using a scrap of wood between the end of the sta e and the
hammer will reduce the li elihood of the end of the sta e splitting.
Note: If soil conditions permit sta es to be pulled
out easily, such as in sandy soil conditions,
cementing is required. If your ground is too hard to
pound in the sta es, you can remove the earth with a
shovel. Install the sta es and compact the earth as you replace it.
Sta es must be placed below the level of the shoc -absorbing
surfacing material to prevent tripping or injury resulting from a fall.

Thank Yo for choosing PlayStar. Beca se it is o r
intention to make this a positive family experience, we
have taken great care in preparing this prod ct. Sho ld
yo have any q estions, or if we can assist yo in any
way, please call o r friendly C stomer Service Department.
Ask for Customer Service.
We Will Gladly Help!
Printed in U.S.A.
© 2004, 2002,1999 PlayStar, Inc. Reproduction of this document in part or whole is prohibited without the permission of PlayStar, Inc.
PlayStar, Incorporated, Janesville, WI 53547
Please call us Toll Free at 1-888-PLAYSTAR
(752-9782)
Monday through Friday, 8:00 A.M. to 5:00 P. M. C.S.T.
T 6403 R6
Table of contents
Other PlayActive Play Set & Playground Equipment manuals
Popular Play Set & Playground Equipment manuals by other brands

Exit
Exit Aksent AK2204 user manual

Equiptec
Equiptec G20 Mobile Assembly manual

Creative Play
Creative Play AC102 installation instructions

Mercia Garden Products
Mercia Garden Products Dorma Playhouse Assembly instructions

stilum
stilum arobis Mounting instructions

NI Climbing Frames
NI Climbing Frames Trail011 instruction manual