
TABLE OF CONTENTS
Figure 8: Guard Install, Slide Pump Half STARTUP-9
Figure 9: Guard Install, Slide Motor Half STARTUP-10
Figure 10: Guard Install, Slide End Plate STARTUP-10
Figure 11: Guard Install, Slide Motor Half to Fit STARTUP-11
Figure 12: Power End –Lube Fill STARTUP-12
Figure 13: Pump Priming –Supply Above Pump STARTUP-13
Figure 14: Pump Priming –Foot Valve STARTUP-14
Figure 15: Pump Priming –Foot Valve and Bypass STARTUP-14
Tables
Table 1: Impeller Clearances STARTUP-5
Table 2: Guard Installation Guidelines STARTUP-8
Table 3: Lubrication Capacities STARTUP-11
Table 4: Oil Requirements Based on Temperature STARTUP-12
Table 5: Recommended Lubricants STARTUP-12
Maintenance
Schedule MAINT-2
Bearings MAINT-2
Lubrication Requirements MAINT-3
Mechanical Seal Maintenance MAINT-3
Disassembly MAINT-4
Precautions MAINT-4
Required Tools MAINT-4
Drain Pump MAINT-5
Coupling Removal MAINT-5
Back Pull-Out Removal MAINT-5
Impeller Removal MAINT-7
Casing Cover Removal MAINT-9,10
Bearing Frame Disassembly MAINT-11-21
Pre-Assembly Checks MAINT-21
Part Replacement Guidelines MAINT-22
Bearing Frame Inspection MAINT-26
Seal Chamber Inspection MAINT-27,28
Bearing Housing Inspection MAINT-28
Bearing Fits and Tolerances MAINT-30
Reassembly MAINT-31
Group 1,2 MAINT-31-36
Group 3 MAINT-36-39
Group 4 MAINT-40-43
Power Frame Assembly MAINT-43-47
ISOMAG Labyrinth Seal Information MAINT-47
Final Assembly Checks MAINT-48-55
Figures
Figure 1: Guard Removal MAINT-5
Figure 2: Back Pullout Removal MAINT-6
Figure 3: Coupling Hub Removal MAINT-7
Figure 4: Impeller Removal MAINT-7
Figure 5: Impeller O-Ring MAINT-8
Figure 6: Impeller Plug Removal (Group 4) MAINT-8
Figure 7: Impeller O-Ring (Group 4) MAINT-9
Figure 8: Seal Chamber Removal MAINT-10
Figure 9: Mechanical Seal Removal MAINT-10
Figure 10: Adapter Removal MAINT-11
Figure 11: Labyrinth Seal Removal MAINT-11
Figure 12: Shaft Assembly Removal MAINT-12
Figure 13: Hardware Removal MAINT-12
Figure 14: Bearing Housing Removal MAINT-13
Figure 15: Bearing Removal MAINT-13
Figure 16: Hardware Removal Grp 1/2 Duplex Brg MAINT-14
Figure 17: Bearing Removal Grp 1/2 Duplex Brg MAINT-14
Figure 18: Labyrinth Seal Removal –Brg Hsg MAINT-15
Figure 19: Shaft Assembly Removal MAINT-15
Figure 20: Hardware Removal Grp 3 MAINT-16
Figure 21: Bearing Removal Grp 3 MAINT-16
Figure 22: Labyrinth Seal Removal Grp 3 MAINT-17
Figure 23: Shaft Assembly Removal Grp 4 MAINT-17
Figure 24: Flinger and Bearing Removal Grp 4 MAINT-18
Figure 25: Bearing Housing Removal Grp 4 MAINT-18
Figure 26: Bearing Housing Disassembly Grp 4 MAINT-19
Figure 27: Shaft Assbly Removal Grp 4 Duplex Brg MAINT-19
Figure 28: Flinger and Brg Removal Grp 4 Duplex Brg MAINT-20
Figure 29: Brg Housing Removal Grp 4 Duplex Brg MAINT-20
Figure 30: Brg Hsg Disassembly Grp 4 Duplex Brg MAINT-21
Figure 31: Bearing Frame Disassembly Grp 4 MAINT-22
Figure 32: Casing Inspection MAINT-23
Figure 33: Impeller Wear Inspection MAINT-24
Figure 34: Shaft TIR Inspection MAINT-25
Figure 35: Bearing Frame Surface Inspection MAINT-26
Figure 36: Casing Cover Inspection –Std. Bore MAINT-27
Figure 37: Casing Cover Inspection –Big Bore MAINT-27
Figure 38: Casing Cover Inspection –Taper Bore MAINT-28
Figure 39: Bearing Housing Inspection Grp 1/2 MAINT-29
Figure 40: Bearing Housing Inspection Grp 3 MAINT-29
Figure 41: Bearing Housing Inspection Grp 4 MAINT-30
Figure 42: Bearing Frame Assembly MAINT-31
Figure 43: Shaft Assembly MAINT-32
Figure 44: Shaft Assembly Installation MAINT-33
Figure 45: Bearing Frame Assembly –Duplex Brg MAINT-34
Figure 46: Duplex Bearing Installation on Shaft MAINT-34
Figure 47: Shaft Assembly –Duplex Brg MAINT-35
Figure 48: Housing Assembly –Duplex Brg MAINT-35
Figure 49: Shaft Assembly Installation –Duplex Brg MAINT-36
Figure 50: Bearing Frame Assembly –Grp 3 MAINT-37
Figure 51: Duplex Bearing Installation on Shaft Grp 3 MAINT-37
Figure 52: Shaft Assembly Duplex Brg –Grr 3 MAINT-38
Figure 53: Housing Assembly –Grp 3 MAINT-38
Figure 54: Shaft Assembly Installation –Grp 3 MAINT-39
Figure 55: Bearing Frame Assembly –Grp 4 MAINT-40
Figure 56: Bearing Housing Assembly –Grp 4 MAINT-41
Figure 57: Flinger and Bearing Installation –Grp 4 MAINT-41
Figure 58: Final Assembly - Grp 4 MAINT-42
Figure 59: Shaft Assembly Installation - Grp 4 MAINT-42
Figure 60: Shaft End Play Inspection MAINT-43
Figure 61: Shaft Sleeve TIR Inspection MAINT-44
Figure 62: Frame Face TIR Inspection MAINT-44
Figure 63: Frame Adapter Installation MAINT-45
Figure 64: Frame Adapter TIR Inspection MAINT-45
Figure 65: Bearing Isolator Installation MAINT-46
Figure 66: ISOMAG Oil Seal Assembly MAINT-47
Figure 67: INPRO Labyrinth Oil Seal Assembly MAINT-48
Figure 68: Mechanical Seal Installation MAINT-50
Figure 69: Seal Chamber TIR Inspection MAINT-51
Figure 70: Shaft Sleeve Installation MAINT-51
Figure 71: Impeller Installation MAINT-52
Figure 72: Setting Impeller Clearance MAINT-53
Tables
Table 1: Oil Change Schedule MAINT-2
Table 2: Oil Fill Capacity MAINT-3
Table 3: Oil Requirements Based on Temp MAINT-3
Table 4: Recommended Oils MAINT-3
Table 5: Labyrinth Oil Seal Fit MAINT-11
Table 6: When to Replace Impeller MAINT-24
Table 7: Shaft TIR Tolerances MAINT-25