14. Window shutters and window boxes
Secure window shutters either side of each window, attach using 2 x 22mm screws per shutter. Fix a window box centrally under the 2 lower windows using 4 x 38mm
screws per box, from inside the building screw through the front panel into the window box corner support.
38mm
Window box
corner support
Window glazing
Wooden beading
Window frame
22mm
13. Window glazing
We recommended that a waterproof sealant is applied around the edge of the glazing before fitting. Place window pane on the inside of the window frame, Using 3 x
20mm nails per beading strip. nail the top and bottom strip first and then the sides. Repeat for all four windows.
Important safety information - retain for future reference
•This product is not suitable for all children under 36 months, due to it having small parts and sharp points.
•Ensure any loose knots are removed from any panels, to reduce risk of choking. Fill holes with a suitable wood filler obtained from most DIY stores.
•Ensure that the pointed ends of all nails, screws and other fastenings are not accessible on any surface of the constructed playhouse, and that all
heads and surfaces of these fastenings are either flush with the surface or countersunk.
•The company takes every care to ensure all goods are clean and free from splinters and rough edges prior to leaving the factory.
•To reduce the risk of splinters, sand down any sharp edges or rough surfaces.
•It is strongly recommended that prior to ‘your’ annual treatment of the product, instructions are read carefully and the manufacturers’
recommendations are followed closely.
•Always ensure a safe, suitable treatment is used to ensure the safety of children and animals.
•Ensure all fastenings are securely located. Check regularly that all fastenings are secure.
• When fitting the hinge ensure there is no gap between the front of the door and the hinge bar. As shown in section 10.
•For future reference, it is advisable to keep details of the manufacturer, instructions for use / assembly instructions and safety notes in a safe place.
Shiplap buildings come ready stained but this is only a preparatory treatment. To VALIDATE the guarantee, the building must be properly treated with a recognised
external wood preserver WITHIN 3 MONTHS of assembly and RE-TREATED ANNUALLY thereafter. The building must also be erected on 75mm x 50mm treated
wooden or similar bearers (These are not supplied with the kit.) Ground contact must be avoided.
Timber Information.
As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose some
of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout the
wooden panels. This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the
building or the amount of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.
This product meets the requirements of BS EN 71 Parts 1 & 2:2011 and 3:1995
If in doubt of any aspect regarding the assembly, use or safety of your playhouse please contact us:
Help Line: (Normal Office Hours) 01829 261 121
Email: support@rowgar.co.uk
ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN
www.rowgar.co.uk 2015 © Rowlinson Garden Products Ltd
We constantly improve the quality of our products,
occasionally the components may differ from the
components shown and are only correct at time of
printing. We reserve the right to change the
specification of our products without prior notice.