manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Saito
  6. •
  7. Boiler
  8. •
  9. Saito B2G User manual

Saito B2G User manual

INSTRUCTIONS
For
B2GBOILER&ALCOHOLBURNER
Readcarefullybeforeoperation.
-1-
Needlevalve
Overflowplug
Pressuregauge
(Option)
Safetyvalvefor
Boiler
Regulator
forWhistle
Regulator
forEngine
Oiler
Smokestack
Safetyvalvefor
Burner(Red)
Toanaccumulator
orDraintank
(Option)
Fromexhaustof
Draintank
(Option)
Pipinglayout
5-10mm
Toservo
B2GBurner B2GBoiler
T2GREngine
Whistle
Pre-heatingtray
CementthesesurfacestoHull
E
D
F
C
B
A
Close Close
Open
Open
Tobelinked
toservo
SectionF
Fixwithwoodscrewsforconvenience
soastotakein&outasunitsection
OIL
Burnernozzle
Glandnut
Installingdevices
*Whenoperatingyourboilerforthefirsttime,donotconnectitinitiallytotheengine.Theremaybe
foreignmatterintheboilerwhichcoulddamagetheengine.Firstflushouttheboilerforabout
tenminutesanddrainhotwaterthroughvalveport[B]beforetheinitialoperation.
(1)Placetheboiler,burner,andsteamengineonaflatsurface.Then
fixtheboilerandsteamenginewithwoodscrews.Theburner
shouldbefixedbyburnerbindingplatesattachedtothesurface.
(2)Connecteachsectionbyrubbertubesandmetalpipesreferring
tothefigure.
Preparationforoperation◆1.
Boiler
(3)Removetheoverflowplug[A]andthesafetyvalve[B].Fillwaterthroughtheportof[B]tillwater
comesoutfromtheportof[A].Placingatowelunder[A]isrecommendedsoasnottowetthe
surroundingarea.
(4)Thenfix[A]and[B]backtotheiroriginalpositionbyfingers.Donotusewrenchorpliers.◆2.
(5)Keepbothregulatorscloseduntil“Steamup”belowiscompleted.
Burner
*Useonlyalcohol(methanol)forfuel.DONOTuseotherfuelssuchasgasoline,paintthinner,
petroleum,etc.
(6)Closetheneedlevalve[D]usingtheattachedhandle.Ifnotclosed,alcoholwilldrainout.◆2.
(7)Removetheredsafetyvalve[C]andfilltankwithfuelto250cc(8.5oz)usingameasuringcupand
afunnel.Donotexceed250ccortheboilermaybedamagediftheflamecontinuestoburnafter
thereisnowaterleftintheboiler.
(8)Thenfix[C]backtotheoriginalpositionbyfingers.◆2.
(9)Placethepre-heatingtrayunderthenozzleandfillalcoholtoabout50%inthetrayusingthe
attachedsquirter.
Steamengine
*CarefullyreadtheinstructionmanualwhichcomeswiththeT2GRsteamenginebeforeoperation.
(10)Filltheoilerwithsteamoil(Blueliquid).Lubricatemetal,crosshead,crankshaft,eccentric,etc.as
wellasallrevolutionandmovementsectionswithmachineoilor50weightautomobileengine
oil.
Preparationforoperationisnowcompleted.
Slidetoinsert
undertheplates
Bindingplates
fixedwith
woodscrews
-2-
Ignitionoftheburner◆1.
(11)Lightthealcoholinthepre-heatingtray.Justbeforethealcoholisconsumed,opentheneedle
valveslowlytoabout15degreesforburnerignition.*Ifnotpreheatedsufficiently,thealcoholwill
notbevaporized.Insuchcases,closetheneedlevalveandrepeattheprocess(9)above.
*Themaximumopeningoftheneedlevalveisabout60degrees
fromfullclose.Adjusttothebestpositionafter10minutesʼ
operation.
*Usuallyitʼ snotnecessarytoopenneedlesofbothnozzles.When
youwantgreatersteamfortheengine,openingbothneedlesis
required.
Steamup*Usingthepressuregauge(option)ishighlyrecommended.
(12)Aftertheburnerisignited,ittakesabout8-12minutestoraisepressuresufficiently.Whenthe
pressuregaugeshows1.0~1.5kgf/cm2,opentheregulatorquicklytofullopenpositionandreturn
tofullclosepositiontogetridofremainingairinsidetheboiler.Thenpressuredropsimmediately
andrisesgraduallyagain.
(13)Whenthepressuregaugeshows1.0~2.0kgf/cm2,Steamupiscompletedandnowyoucan
operateregulatorstoruntheengineorusethewhistle.
CAUTION
◆1.Alwayskeepfuelcan,containers,andburnablematerialawayfromtheburner.Andkeepawet
towelnearbyforanemergency.
◆2.Excessivetighteningmaygreatlyshortenthelifeofpackings(O-ring,gasket,orglandpacking)
andevenstriporbreakthethreadedpartoftheneedlevalve,safetyvalves,andoverflowplug.
◆3.Alwaysusefixedwaterandfuellevelsfortheboilerandburners.
◆4.Donotfilluptheboilerwithhotwater.
◆5.Ifyourestarttheengineafterstoppingtheburnerforciblybyclosingneedlevalve,theremaybe
fuelremainingintheburner.Insuchcases,theburnercanbere-litimmediatelywhilethetankis
stillhot.ButthenDONOTaddanyfuel.
Orafteritgetscold,draintheremainingfuelfromtheburner(removethesafetyvalve[C]and
turntheburnerupsidedown),andfollowtheprocessoutlinedin(3)to(13)abovetorestart.
◆6.Incaseofengineracing,adjusttherpmusingtheneedlevalveandtheregulator.Operatingthe
engineathighrpmcancauseexcessivewearorotherdamage.
◆7.Aslongasyoufeedrecommendedquantitiesofwaterandfuel,theflamewillextinguishinabout
25minutes.Thequantitiesaremeasuredtoensurethattherewillbewaterleftintheboilerwhen
theflameisextinguished.Ifexcessivefuelisused,theboilerwillbecomeoverheatedafterthe
waterhasbeendepletedandtheflamecontinues.Thisdrysuperheatingcanbreaksomewelded
sectionsandcausesubsequentboilerleakage.Insomecases,severedamagecanresultwhich
cannotberepaired.
-3-
Fullopen
approx.60degs
Fullclose
0deg
Burnerneedleposition
◆8.
Ifyoufindsuchphenomenadescribedbelow,thereispossibilityofdrysuperheating.STOPthe
operationimmediatelytoavoidadditionaldamage.
#Eventhoughtheheatingpoweroftheburnerisstillstrongandstable...
 -Pressuredoesnʼ tincrease.
 -EngineRPMdecreases.
 -Steamfromtheexhaustpipeisreduced.
#Paleflamesarecomingoutofthestack.
#Abnormalsmellorsmokeisobserved.
NOTE
◇1.
Thesafetyvalvefortheboilerworksatthepressureof2kgf/cm2.Thesafetyvalve(REDcolored)for
theburnerworksatthepressureof1.5kgf/cm2.Theoperatormustpaycloseattentionto
pressureswhichexceedthesenorms.
◇2.
Alwaysconfirmthatthesafetyvalvesarefunctioningfreelybydepressingthespringswhenfilling
thewatersupplyandfuelsupply.
◇3.
Closingtheneedlevalvewillextinguishtheflameandshutdowntheoperation.
◇4.
Becausecarbontendstocollectonthenozzles,cleanthenozzlesaftereverytenoperationsusing
theattachedwire.
*Donotuseawireotherthantheattachedonetocleanthenozzlesasanythickwiremayreduce
theheatingpowerbywideningthenozzlehole.Also,cleanthenozzlesfromthenozzleend
(boilerside).Donotloosenthescrewsof[E].
◇5.
Aboutheatingpowerweaknesses,refertotheCausesandCountermeasureslistedbelow
◇6.
Thewickendshouldalwaysreachthebottomoftheburnertoensuresteadyfuelflowandflame.
Ifthewickdoesnottouchthebottom,heatingpowerwillbereduced.Insuchcases,pushthe
wickdowngentlyusingawireorsimilarobject.Standardburningtimeisabout25minutes.If
burningtimeisover25minutes,itmeansthatheatingpowerisreducedandtheoperatormust
findandfixthecause(s).
Possiblecause 
Fuelabsorbedmoisture
Excessivedustor
carboninnozzle 
Foreignmatterprevents
valvefromclosing
Countermeasure
Replaceremainingfuelwithnewalcohol.
Cleanusingwireprovided.Afterremovingtheglandnutand
needle,passthewirethroughtheholesinthenozzle.
Whengasleakageiscausedbysomethingpreventingthevalve
fromclosingcompletely,cleanitcompletely
-4-
Allspecificationsandmodelsaresubjecttochangewithoutnotice.
http://www.saito-mfg.com
SAITO SEISAKUSHO CO., LTD.
22-7,3-chome,Tokagi,Ichikawa-shi,Chibaprefecture272-0024,Japan
Phone:047-378-4156FAX:047-378-4155
-5-
SmokingdeviceforB2G
発煙タンク(オプション)
より
Fromsmokingtank
(Option)
発煙装置
Smokingdevice
バーナー
Burner ボイラー
Boiler 真鍮パイプ
Brass-pipe
付属金具
Fittingpipe
発煙タンク
Smoketank
はめる
Insert
ネオプレンチューブ
Neoprene-tube
ニードルバルブ
Needlevalve
約2㎜
Approx.
バーナーハンドルで調節
Adjustwiththeburnerhandle
発煙タンク接続図ForB2G
FittingoftheSmoketankForB2G
・ニードルバルブをあけすぎると、生ガスの発生と、燃焼の妨げになります。あけすぎない
ようご注意下さい。
・オイルは、専用のスモークオイルをご使用下さい。
・ニードルバルブはデリケートなので、過度な開閉は避けて下さい。
・2回目からは、発煙タンク内のドレンを抜いてからオイルを入れて下さい。
・Toomuchopeningoftheneedlevalvecausesraw-gasanddiscouragecombustion.So
takecarenottoopenthenozzletoomuch.
・Usethededicatedoilforthesmoke.
・Theneedlevalveisverydelicatesoavoidopeningtoowideorclosingtootight.
・Fromthe2ndoperation,pourtheoilintothetankafterremovingwasteoilfromthetank.
汽笛へ
ToWhistle
-6-
-7-
NO Description Q'ty NO Description Q'ty
1 Boilerbody 1 11 Boilermount 1
2 Overflowplug 1 12 Boilerband 2
3 O-ringP3 1 13 ScrewM3 4
4 Safetyvalveforboiler 2 14 NutM3 4
S1 Safetyvalvebody 2 15 Superheatedtube 1
S2 Stem 2 16 Smokeemittingdevice 1
S3 O-ringP3 2 17 Smokechamber 1
S4 Spring 2 18 Smokechamberfittingscrew 2
S6 Cover 2 19 Washer 1
5O-ringP8 220Nut 1
6 Regulatorforthrottle 1 21 AlcoholtankforBurner 1
L1 Regulatorbody 1 22 Safetyvalveforburner 1
L2 Valve 1 S11 Safetyvalvebody 1
L3 O-ringP2 1 S12 Stem 1
L4 O-ringP3 1 S13 O-ringP3 1
L5 Lever 1 S14 Spring 1
L6 Cap 1 S16 Cover 1
L7 Glandpacking 1 23 O-ringP8 1
L8 Blankcap 1 24 Combustionnozzle 2
7 Locknutforregulator 2 25 Needlevalve 2
8 O-ringP6 2 26 Glandpacking 2
9 Regulatorforwhistle 1 27 Glandnut 2
L11 Regulatorbody 1 28 Plug 2
L12 Valve 1 29 Filter 2
L13 O-ringP2 1 30 Suctionstring 2
L14 O-ringP3 1 31 Locknut 2
L15 Lever 1 32 Band 1
L16 Capnut133ScrewM3 1
L17 Glandpacking 1 34 NutM3 1
L18 Blankcap 1 35 Burnermount 1
L19 Connectingpipetowhistle 1 36 Nut 1
L20 Locknut 1 37 Pre-heatingtray 1
10 Stack 1 38 Burnerbindingplate 2
PartListforB2G

Popular Boiler manuals by other brands

HuRay HI-DELTA 302ACE Installation and service manual

HuRay

HuRay HI-DELTA 302ACE Installation and service manual

Maktek Epsilon LCD user guide

Maktek

Maktek Epsilon LCD user guide

UTICA BOILERS UB95M-200 Installation, operation & maintenance manual

UTICA BOILERS

UTICA BOILERS UB95M-200 Installation, operation & maintenance manual

Knight WH 55-399 Service manual

Knight

Knight WH 55-399 Service manual

Highland heat Bio Kompakt user manual

Highland heat

Highland heat Bio Kompakt user manual

LAMBORGHINI EL-DB EVO N 32 Instructions for use, installation and maintenance

LAMBORGHINI

LAMBORGHINI EL-DB EVO N 32 Instructions for use, installation and maintenance

Potterton Promax 12 SL Installation and service instructions

Potterton

Potterton Promax 12 SL Installation and service instructions

Atlantic ygnis Pyronox LRP Assembly guide

Atlantic

Atlantic ygnis Pyronox LRP Assembly guide

Viessmann Vitodens 100-W WB1C Specifications

Viessmann

Viessmann Vitodens 100-W WB1C Specifications

Rheem ThermaForce RHBH-L120i User's information manual

Rheem

Rheem ThermaForce RHBH-L120i User's information manual

Crown Boiler FSZ080 installation instructions

Crown Boiler

Crown Boiler FSZ080 installation instructions

Rotex GW-20 C22 installation instructions

Rotex

Rotex GW-20 C22 installation instructions

Viessmann VITOCROSSAL 200 Service instructions

Viessmann

Viessmann VITOCROSSAL 200 Service instructions

Centrometal EKO-CK P 20-40 Technical instructions

Centrometal

Centrometal EKO-CK P 20-40 Technical instructions

Boulter Camray 5 Installation & maintenance manual

Boulter

Boulter Camray 5 Installation & maintenance manual

Bosch TR1000K Installation and operating instructions

Bosch

Bosch TR1000K Installation and operating instructions

Lochinvar TSU150 Operation manual

Lochinvar

Lochinvar TSU150 Operation manual

Biasi Riva Plus Installation & operation instructions

Biasi

Biasi Riva Plus Installation & operation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.