manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Saito
  6. •
  7. Boiler
  8. •
  9. Saito B2G User manual

Saito B2G User manual

Popular Boiler manuals by other brands

IDEAL IMAX XTRA EL 320 user guide

IDEAL

IDEAL IMAX XTRA EL 320 user guide

UTICA BOILERS BC3D Installation, operation & maintenance manual

UTICA BOILERS

UTICA BOILERS BC3D Installation, operation & maintenance manual

Lochinvar SOLUTION 260000 Installation & service manual

Lochinvar

Lochinvar SOLUTION 260000 Installation & service manual

Weil-McLain EG 6 Series manual

Weil-McLain

Weil-McLain EG 6 Series manual

RBI LCD Series Installation & operation manual

RBI

RBI LCD Series Installation & operation manual

Baxi MainEco Combi 28 Installation and service manual

Baxi

Baxi MainEco Combi 28 Installation and service manual

Unical ALKON R 24 Installation and Servicing Manual

Unical

Unical ALKON R 24 Installation and Servicing Manual

Automatic Heating Gasogen Installation and Servicing Manual

Automatic Heating

Automatic Heating Gasogen Installation and Servicing Manual

Viessmann VITORADIAL 300-T Type VR3 Service instructions for contractors

Viessmann

Viessmann VITORADIAL 300-T Type VR3 Service instructions for contractors

Alpha GasSaver GS-1 Installation and servicing instructions

Alpha

Alpha GasSaver GS-1 Installation and servicing instructions

Baxi ROCA LAURA PLUS 28/28 Operating, cleaning and maintenance instructions for the user

Baxi

Baxi ROCA LAURA PLUS 28/28 Operating, cleaning and maintenance instructions for the user

Vaillant uniSTOR VIH SW GB 500 BES operating instructions

Vaillant

Vaillant uniSTOR VIH SW GB 500 BES operating instructions

Kärcher HWE 4000 Gas manual

Kärcher

Kärcher HWE 4000 Gas manual

Radijator BIO max 23.1 instruction manual

Radijator

Radijator BIO max 23.1 instruction manual

Granby BKC Installation, operation and maintenance manual

Granby

Granby BKC Installation, operation and maintenance manual

Brunner BSV 20 Instructions for use

Brunner

Brunner BSV 20 Instructions for use

Potterton 50e Installation and Servicing Manual

Potterton

Potterton 50e Installation and Servicing Manual

UTICA BOILERS TriFire Assembly instructions

UTICA BOILERS

UTICA BOILERS TriFire Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

INSTRUCTIONS
For
B2GBOILER&ALCOHOLBURNER
Readcarefullybeforeoperation.
-1-
Needlevalve
Overflowplug
Pressuregauge
(Option)
Safetyvalvefor
Boiler
Regulator
forWhistle
Regulator
forEngine
Oiler
Smokestack
Safetyvalvefor
Burner(Red)
Toanaccumulator
orDraintank
(Option)
Fromexhaustof
Draintank
(Option)
Pipinglayout
5-10mm
Toservo
B2GBurner B2GBoiler
T2GREngine
Whistle
Pre-heatingtray
CementthesesurfacestoHull
E
D
F
C
B
A
Close Close
Open
Open
Tobelinked
toservo
SectionF
Fixwithwoodscrewsforconvenience
soastotakein&outasunitsection
OIL
Burnernozzle
Glandnut
Installingdevices
*Whenoperatingyourboilerforthefirsttime,donotconnectitinitiallytotheengine.Theremaybe
foreignmatterintheboilerwhichcoulddamagetheengine.Firstflushouttheboilerforabout
tenminutesanddrainhotwaterthroughvalveport[B]beforetheinitialoperation.
(1)Placetheboiler,burner,andsteamengineonaflatsurface.Then
fixtheboilerandsteamenginewithwoodscrews.Theburner
shouldbefixedbyburnerbindingplatesattachedtothesurface.
(2)Connecteachsectionbyrubbertubesandmetalpipesreferring
tothefigure.
Preparationforoperation◆1.
Boiler
(3)Removetheoverflowplug[A]andthesafetyvalve[B].Fillwaterthroughtheportof[B]tillwater
comesoutfromtheportof[A].Placingatowelunder[A]isrecommendedsoasnottowetthe
surroundingarea.
(4)Thenfix[A]and[B]backtotheiroriginalpositionbyfingers.Donotusewrenchorpliers.◆2.
(5)Keepbothregulatorscloseduntil“Steamup”belowiscompleted.
Burner
*Useonlyalcohol(methanol)forfuel.DONOTuseotherfuelssuchasgasoline,paintthinner,
petroleum,etc.
(6)Closetheneedlevalve[D]usingtheattachedhandle.Ifnotclosed,alcoholwilldrainout.◆2.
(7)Removetheredsafetyvalve[C]andfilltankwithfuelto250cc(8.5oz)usingameasuringcupand
afunnel.Donotexceed250ccortheboilermaybedamagediftheflamecontinuestoburnafter
thereisnowaterleftintheboiler.
(8)Thenfix[C]backtotheoriginalpositionbyfingers.◆2.
(9)Placethepre-heatingtrayunderthenozzleandfillalcoholtoabout50%inthetrayusingthe
attachedsquirter.
Steamengine
*CarefullyreadtheinstructionmanualwhichcomeswiththeT2GRsteamenginebeforeoperation.
(10)Filltheoilerwithsteamoil(Blueliquid).Lubricatemetal,crosshead,crankshaft,eccentric,etc.as
wellasallrevolutionandmovementsectionswithmachineoilor50weightautomobileengine
oil.
Preparationforoperationisnowcompleted.
Slidetoinsert
undertheplates
Bindingplates
fixedwith
woodscrews
-2-
Ignitionoftheburner◆1.
(11)Lightthealcoholinthepre-heatingtray.Justbeforethealcoholisconsumed,opentheneedle
valveslowlytoabout15degreesforburnerignition.*Ifnotpreheatedsufficiently,thealcoholwill
notbevaporized.Insuchcases,closetheneedlevalveandrepeattheprocess(9)above.
*Themaximumopeningoftheneedlevalveisabout60degrees
fromfullclose.Adjusttothebestpositionafter10minutesʼ
operation.
*Usuallyitʼ snotnecessarytoopenneedlesofbothnozzles.When
youwantgreatersteamfortheengine,openingbothneedlesis
required.
Steamup*Usingthepressuregauge(option)ishighlyrecommended.
(12)Aftertheburnerisignited,ittakesabout8-12minutestoraisepressuresufficiently.Whenthe
pressuregaugeshows1.0~1.5kgf/cm2,opentheregulatorquicklytofullopenpositionandreturn
tofullclosepositiontogetridofremainingairinsidetheboiler.Thenpressuredropsimmediately
andrisesgraduallyagain.
(13)Whenthepressuregaugeshows1.0~2.0kgf/cm2,Steamupiscompletedandnowyoucan
operateregulatorstoruntheengineorusethewhistle.
CAUTION
◆1.Alwayskeepfuelcan,containers,andburnablematerialawayfromtheburner.Andkeepawet
towelnearbyforanemergency.
◆2.Excessivetighteningmaygreatlyshortenthelifeofpackings(O-ring,gasket,orglandpacking)
andevenstriporbreakthethreadedpartoftheneedlevalve,safetyvalves,andoverflowplug.
◆3.Alwaysusefixedwaterandfuellevelsfortheboilerandburners.
◆4.Donotfilluptheboilerwithhotwater.
◆5.Ifyourestarttheengineafterstoppingtheburnerforciblybyclosingneedlevalve,theremaybe
fuelremainingintheburner.Insuchcases,theburnercanbere-litimmediatelywhilethetankis
stillhot.ButthenDONOTaddanyfuel.
Orafteritgetscold,draintheremainingfuelfromtheburner(removethesafetyvalve[C]and
turntheburnerupsidedown),andfollowtheprocessoutlinedin(3)to(13)abovetorestart.
◆6.Incaseofengineracing,adjusttherpmusingtheneedlevalveandtheregulator.Operatingthe
engineathighrpmcancauseexcessivewearorotherdamage.
◆7.Aslongasyoufeedrecommendedquantitiesofwaterandfuel,theflamewillextinguishinabout
25minutes.Thequantitiesaremeasuredtoensurethattherewillbewaterleftintheboilerwhen
theflameisextinguished.Ifexcessivefuelisused,theboilerwillbecomeoverheatedafterthe
waterhasbeendepletedandtheflamecontinues.Thisdrysuperheatingcanbreaksomewelded
sectionsandcausesubsequentboilerleakage.Insomecases,severedamagecanresultwhich
cannotberepaired.
-3-
Fullopen
approx.60degs
Fullclose
0deg
Burnerneedleposition
◆8.
Ifyoufindsuchphenomenadescribedbelow,thereispossibilityofdrysuperheating.STOPthe
operationimmediatelytoavoidadditionaldamage.
#Eventhoughtheheatingpoweroftheburnerisstillstrongandstable...
 -Pressuredoesnʼ tincrease.
 -EngineRPMdecreases.
 -Steamfromtheexhaustpipeisreduced.
#Paleflamesarecomingoutofthestack.
#Abnormalsmellorsmokeisobserved.
NOTE
◇1.
Thesafetyvalvefortheboilerworksatthepressureof2kgf/cm2.Thesafetyvalve(REDcolored)for
theburnerworksatthepressureof1.5kgf/cm2.Theoperatormustpaycloseattentionto
pressureswhichexceedthesenorms.
◇2.
Alwaysconfirmthatthesafetyvalvesarefunctioningfreelybydepressingthespringswhenfilling
thewatersupplyandfuelsupply.
◇3.
Closingtheneedlevalvewillextinguishtheflameandshutdowntheoperation.
◇4.
Becausecarbontendstocollectonthenozzles,cleanthenozzlesaftereverytenoperationsusing
theattachedwire.
*Donotuseawireotherthantheattachedonetocleanthenozzlesasanythickwiremayreduce
theheatingpowerbywideningthenozzlehole.Also,cleanthenozzlesfromthenozzleend
(boilerside).Donotloosenthescrewsof[E].
◇5.
Aboutheatingpowerweaknesses,refertotheCausesandCountermeasureslistedbelow
◇6.
Thewickendshouldalwaysreachthebottomoftheburnertoensuresteadyfuelflowandflame.
Ifthewickdoesnottouchthebottom,heatingpowerwillbereduced.Insuchcases,pushthe
wickdowngentlyusingawireorsimilarobject.Standardburningtimeisabout25minutes.If
burningtimeisover25minutes,itmeansthatheatingpowerisreducedandtheoperatormust
findandfixthecause(s).
Possiblecause 
Fuelabsorbedmoisture
Excessivedustor
carboninnozzle 
Foreignmatterprevents
valvefromclosing
Countermeasure
Replaceremainingfuelwithnewalcohol.
Cleanusingwireprovided.Afterremovingtheglandnutand
needle,passthewirethroughtheholesinthenozzle.
Whengasleakageiscausedbysomethingpreventingthevalve
fromclosingcompletely,cleanitcompletely
-4-
Allspecificationsandmodelsaresubjecttochangewithoutnotice.
http://www.saito-mfg.com
SAITO SEISAKUSHO CO., LTD.
22-7,3-chome,Tokagi,Ichikawa-shi,Chibaprefecture272-0024,Japan
Phone:047-378-4156FAX:047-378-4155
-5-
SmokingdeviceforB2G
発煙タンク(オプション)
より
Fromsmokingtank
(Option)
発煙装置
Smokingdevice
バーナー
Burner ボイラー
Boiler 真鍮パイプ
Brass-pipe
付属金具
Fittingpipe
発煙タンク
Smoketank
はめる
Insert
ネオプレンチューブ
Neoprene-tube
ニードルバルブ
Needlevalve
約2㎜
Approx.
バーナーハンドルで調節
Adjustwiththeburnerhandle
発煙タンク接続図ForB2G
FittingoftheSmoketankForB2G
・ニードルバルブをあけすぎると、生ガスの発生と、燃焼の妨げになります。あけすぎない
ようご注意下さい。
・オイルは、専用のスモークオイルをご使用下さい。
・ニードルバルブはデリケートなので、過度な開閉は避けて下さい。
・2回目からは、発煙タンク内のドレンを抜いてからオイルを入れて下さい。
・Toomuchopeningoftheneedlevalvecausesraw-gasanddiscouragecombustion.So
takecarenottoopenthenozzletoomuch.
・Usethededicatedoilforthesmoke.
・Theneedlevalveisverydelicatesoavoidopeningtoowideorclosingtootight.
・Fromthe2ndoperation,pourtheoilintothetankafterremovingwasteoilfromthetank.
汽笛へ
ToWhistle
-6-
-7-
NO Description Q'ty NO Description Q'ty
1 Boilerbody 1 11 Boilermount 1
2 Overflowplug 1 12 Boilerband 2
3 O-ringP3 1 13 ScrewM3 4
4 Safetyvalveforboiler 2 14 NutM3 4
S1 Safetyvalvebody 2 15 Superheatedtube 1
S2 Stem 2 16 Smokeemittingdevice 1
S3 O-ringP3 2 17 Smokechamber 1
S4 Spring 2 18 Smokechamberfittingscrew 2
S6 Cover 2 19 Washer 1
5O-ringP8 220Nut 1
6 Regulatorforthrottle 1 21 AlcoholtankforBurner 1
L1 Regulatorbody 1 22 Safetyvalveforburner 1
L2 Valve 1 S11 Safetyvalvebody 1
L3 O-ringP2 1 S12 Stem 1
L4 O-ringP3 1 S13 O-ringP3 1
L5 Lever 1 S14 Spring 1
L6 Cap 1 S16 Cover 1
L7 Glandpacking 1 23 O-ringP8 1
L8 Blankcap 1 24 Combustionnozzle 2
7 Locknutforregulator 2 25 Needlevalve 2
8 O-ringP6 2 26 Glandpacking 2
9 Regulatorforwhistle 1 27 Glandnut 2
L11 Regulatorbody 1 28 Plug 2
L12 Valve 1 29 Filter 2
L13 O-ringP2 1 30 Suctionstring 2
L14 O-ringP3 1 31 Locknut 2
L15 Lever 1 32 Band 1
L16 Capnut133ScrewM3 1
L17 Glandpacking 1 34 NutM3 1
L18 Blankcap 1 35 Burnermount 1
L19 Connectingpipetowhistle 1 36 Nut 1
L20 Locknut 1 37 Pre-heatingtray 1
10 Stack 1 38 Burnerbindingplate 2
PartListforB2G