Nous nous réservons le droit de modifier nos produits sans préavis, y compris ceux pour lesquels des commandes ont été enregistrées.
SERVINOX MV D GB
200, Chaussée Jules César - BP24 - 95250 Beauchamp - France
Tél. : + 33 (0)1 39 32 77 00 -Fax : +33 (0)1 39 95 12 21
Email : mail@servinox.com - Homepage : http://www.servinox.com 2/4
STORAGE CONDITIONS
The valve must be kept in a clean and dry storage under
non-corrosive atmospheric conditions.
INSTALLATION
A means of lifting must be used to handle large diameters
valves. Slinging by lever or automatic control is forbidden.
Textile slings around the valve body must be used.
Before mounting of the valve, the following points must be
checked:
•Parallelism of the ends.
•Correct alignment of piping.
•Quality of the span of the ends.
Valve spatial requirement must be established by
provisionally installing the valves on piping.
Multiway valve with butt weld ends
Weld ends must be dismounted in order to proceed with
their welding. For the correct operation of the valves,
following precautions must be followed when proceeding of
the disassembling and the reassembly of the ends:
•Identify the position of the end connections in order to
replace them as they were at delivery.
•Above all take care that the small pure PTFE blocks
(Ref.23 and 24) are exactly replaced where they were; so
that the thickness of fastener originally defined is
restored (this chock might not be identical on all the
ways).
•In any case dismantle the pure PTFE sealing rings (Ref.
7) that are mounted in the body openings (Ref. 1) and
that support the key (Ref. 2). If one of these rings gets
out of its place during dismounting of the valve; very
carefully replace it in its initial position.
To dismount the weld ends (Ref. 14), the 4 screws (Ref. 12)
must be first unscrewed. The ends can then be released
from the body (Ref. 1). The valve must be then put on the
side.
The ends must be now welded on the piping.
When installing the valve and in order to respect its correct
sealing, the following operations must be carried out before
mounting the body of the valve:
•Remove any foreign matter from pipes (filings, burr,
etc...).
•Make sure that gaskets (Ref. 9) and rings (Ref. 7) are in
the correct position.
•Carefully replace body (Ref. 1) of the valve between the
ends.
•Screw all 4 screws (Ref. 12) of each end.
Heating multiway valve : Fitting auxiliary heating fluid
For a heating multiway valve, the dimensions that figure in
the table of dimensions are not valid.
APPLICATION USE
Once the valves are mounted, they must undergo the same
tests than the piping. The tightness of both the body and the
ends must be checked. The manoeuvrability must also be
verified. A resistance might be observed during the first
utilisations.
After the first operating hours, the tightening (ends, hat)
must be checked in pressure and temperature.
For an automatic multiway valve, several points have to be
checked: specifications of driving compressed air and
command, pneumatic connection directions, as well as the
correct rotation of the valve (identified by a mark on the hat).
When the valves are equipped with electro-distributor or
position sensor, the nature of the electric tensions and the
classification of the distributors and indications have to be
checked.