manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. SHADE SCAPES AMERICAS
  6. •
  7. Rack & Stand
  8. •
  9. SHADE SCAPES AMERICAS SPECTRA User manual

SHADE SCAPES AMERICAS SPECTRA User manual

1:
(a) Determine the location where you want to install the
Rotational In-Ground Fitting (IS). Dig a 24" x 24" square hole with
a depth of 16". The edges of the hole should vertical. Sloping,
rounded sides will allow the concrete to loosen over time.
A COMPONENTS LIST & REQUIRED TOOLS
1X IN-GROUND FITTING (IR)
Box A
B MOUNTING INSTRUCTIONS
REQUIRED TOOLS LIST (not included):
Standard Spade/Shovel
Carpenter's Level
Pre-Mixed "High Early Strength" Concrete
Iron Rebar
Small Sledge Hammer
Duct Tape
Wheelbarrow
Hoe
4X#10x20mm#SPIGOT#BOLTS#(A2)*##################################################################################################
1X#6mm#ALLEN#WRENCH#(T2)*###########
*PLEASE NOTE THE SPIGOT BOLTS AND 6mm ALLEN WRENCH ARE LOCATED IN THE IN-GROUND FITTING MOUNT BOX,
BUT WILL NOT BE USED UNTIL YOU BEGIN TO INSTALL THE UMBRELLA. SEE YOUR UMBRELLA OWNERS MANUAL FOR DETAILS.
IN-GROUND FITTING
INSTALLATION MANUAL
IN-GROUND FITTING:
SPECTRA, ECLIPSE, ICARUS, Infina
for ROTATIONAL SPIGOT (and Infina)
NOTE: The dimensions given above are a general guideline for
the size of the hole. A general rule of thumb: the easier the
ground is to dig, the bigger the hole should be, or alternately,
if the ground is hard the hole can be smaller.
1
Once installed, always use COMMON SENSE WIND GUIDELINES: If it is too windy to be outside enjoying the day, it is best to lower/collapse
the Umbrella Frame w/ Fabric Canopy. It is also important to keep it lowered/collapsed when unattended. See manufacturer's limited warranty
on page 2.
Please thoroughly read this installation manual before installing the Spectra Mount System, and before assembling and operating the Spectra
Round Umbrella. The Spectra Warranty does not cover damage caused by incorrect installation, wind, or wrongful use of the product. All users
must be properly trained in operation and wind guidelines.
1X - ROTATIONAL
SPIGOT ASSEMBLY (SR)
(Packed with Umbrella Structure)
SPIGF=SSA2015.01
C WARRANTY
Umbrosa NV warrants to the consumer that Spectra/Eclipse/Icarus products are free from manufacturer defects in material or workmanship for
a period of three (3) years from the date of original purchase when used in compliance with directions as outlined in the manufacturer’s
instructions, which includes reasonable and necessary maintenance by the consumer. Warranty does not include normal wear and tear of
product. Umbrosa takes no responsibility for incorrect use or assembly related to installation area, consistency of supports and relative
hardware used, and capacity of mounting surfaces. Failure to follow the given assembly, maintenance, use and care instructions will void the
product warranty. In case of manufacturing defects in material or workmanship, Umbrosa NV, agrees to, at their discretion, send the
replacement part for all defective parts.
Distributed#by#ShadeScapes#Americas#www.shadescapesamericas.com;#817.217.4446.##For#assembly#assistance#or#questions#please#
contact#ShadeScapes#Americas#at#970.527.7070,#or#email#[email protected]
5:
(a) Mix the concrete in a wheelbarrow following the instructions
on the packaging of the Concrete Mix.
(b) Fill the hole with concrete and stop when the concrete
is 4" from the bottom of the round plate of the Spectra
In-Ground Fitting (IR).
(c) Replace a layer soil before replacing the sod if mounted in
a grassy area.
2
NOTE: If not mounting in a grassy area, the concrete may be
poured until level with the top plate of the In-Ground Fitting .
3:
The top plate of the In-Ground Fitting has four (4) tapped
holes. Two (2) of the tapped holes should be aligned SQUARE
to whatever you are aligning the Spectra Round Umbrella with.
For example, your house, edge of patio, etc., as shown in the
diagram to the left.
4:
(a) Stick the piece of Iron Rebar connected to the Spectra
In-Ground Fitting (IR) into the ground near the center of
the hole.
(b) Align the tapped holes by rotating as necessary. See
alignment instructions in step B3.
(c) With a carpenter's level or straight edge, make sure
the top plate is flush with the subsoil.
(d) Ensure the top plate is level by placing the Carpenters
Level in two directions 90° to each other. Continue to make
adjustments until the plate is perfectly level.
2:
(a) Hammer several lengths of Iron Rebar into the sides
of the hole at varying angles around the hole. There should be
a minimum of one length pointing in each wind direction. This
process anchors the concrete to the subsoil and prevents it
from becoming loose in the hole over time.
(b) Prepare to install the Rotational In-Ground Fitting (IR) by
attaching a length of Iron Rebar to the tube of the In-Ground
Fitting with duct tape. IMPORTANT: Tape both sides of the
tapped holes to prevent concrete from getting in the threads.

This manual suits for next models

3

Other SHADE SCAPES AMERICAS Rack & Stand manuals

SHADE SCAPES AMERICAS PARAFLEX PAVER BASE W/OPTIONAL COVER User manual

SHADE SCAPES AMERICAS

SHADE SCAPES AMERICAS PARAFLEX PAVER BASE W/OPTIONAL COVER User manual

SHADE SCAPES AMERICAS CONCRETE MOUNT KIT User manual

SHADE SCAPES AMERICAS

SHADE SCAPES AMERICAS CONCRETE MOUNT KIT User manual

SHADE SCAPES AMERICAS PARAFLEX 150 LB SHELL BASE KIT User manual

SHADE SCAPES AMERICAS

SHADE SCAPES AMERICAS PARAFLEX 150 LB SHELL BASE KIT User manual

SHADE SCAPES AMERICAS Concrete Mount Kit User manual

SHADE SCAPES AMERICAS

SHADE SCAPES AMERICAS Concrete Mount Kit User manual

Popular Rack & Stand manuals by other brands

Atdec AWM-LR installation guide

Atdec

Atdec AWM-LR installation guide

Garmin LIVESCOPE PLUS LVS34 installation instructions

Garmin

Garmin LIVESCOPE PLUS LVS34 installation instructions

Roland V-Drums MDS-9 owner's manual

Roland

Roland V-Drums MDS-9 owner's manual

Milestone AV Technologies simplicity SLF3 Installation

Milestone AV Technologies

Milestone AV Technologies simplicity SLF3 Installation

Ropox 40-40906 Mounting instructions

Ropox

Ropox 40-40906 Mounting instructions

Sony BKM-31E14 installation manual

Sony

Sony BKM-31E14 installation manual

Olimpia splendid Bi2 B0654 Instructions for mounting

Olimpia splendid

Olimpia splendid Bi2 B0654 Instructions for mounting

New Star Neomounts FPMA-C020BLACK instruction manual

New Star

New Star Neomounts FPMA-C020BLACK instruction manual

Tripp Lite DWM1737S owner's manual

Tripp Lite

Tripp Lite DWM1737S owner's manual

PRIMAL TREESTANDS PVHO-211 Instruction and safety manual

PRIMAL TREESTANDS

PRIMAL TREESTANDS PVHO-211 Instruction and safety manual

Testrite Visual Skyscraper Mightee Mount SKMM Series manual

Testrite Visual

Testrite Visual Skyscraper Mightee Mount SKMM Series manual

Ubiquiti CKG2-RM quick start guide

Ubiquiti

Ubiquiti CKG2-RM quick start guide

Sealey AS12.V2 manual

Sealey

Sealey AS12.V2 manual

Crestron TMK-3000L installation guide

Crestron

Crestron TMK-3000L installation guide

Premier Mounts PBL-200 installation instructions

Premier Mounts

Premier Mounts PBL-200 installation instructions

CTA ADD-ADMA instruction manual

CTA

CTA ADD-ADMA instruction manual

ricoo TS0911 Assembly manual

ricoo

ricoo TS0911 Assembly manual

Iiyama MD 052W7115 manual

Iiyama

Iiyama MD 052W7115 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.