
2'-0" 14'
3'-2" 7'-10" 8'-0"
6'-0"
25'
1'-0"
1'-4"
6'-0"
6'-0"
prevent direct Sun on Slide's Chute.
Sheet 3 of 3
Sheet 3 of 3Sheet 3 of 3
Sheet 3 of 3
OTE: Slide should be installed in shaded areas or face ORTH to
projections that may have been caused by rough handling in
equipment.*
USE AREA & FOOTI G LAYOUT
USE AREA & FOOTI G LAYOUTUSE AREA & FOOTI G LAYOUT
USE AREA & FOOTI G LAYOUT
GE ERAL MAI TE A CE I STRUCTIO S:
GE ERAL MAI TE A CE I STRUCTIO S:GE ERAL MAI TE A CE I STRUCTIO S:
GE ERAL MAI TE A CE I STRUCTIO S:
should be put in concrete to maintain proper finish grade for
and/or replace immediately.
GE ERAL ASSEMBLY I STRUCTIO S:
GE ERAL ASSEMBLY I STRUCTIO S:GE ERAL ASSEMBLY I STRUCTIO S:
GE ERAL ASSEMBLY I STRUCTIO S:
Check MO THLY for loose bolts, damaged or broken parts. Tighten
* If Resilient Surfacing is to be less than 12", then additional pipe
instructions. Go over entire unit to file smooth any sharp edges or
many situations only one bolt is required. See specific assembly
T-Clamps are designed for both one and two bolt connections. In
A D/OR PEE ED OVER TO REMOVE A Y SHARP EDGES.
BOLTS PROTRUDI G BEYO D UTS SHOULD BE CUT OFF
plumbed & leveled. After assembly is complete, A Y E DS OF
should be done EVE LY after final assembly when unit has been
Only hand tighten nuts & bolts on initial assembly. Final tightening
degrees off level to facilitate water drainage.
ASSEMBLY & I STALLATIO :
ASSEMBLY & I STALLATIO :ASSEMBLY & I STALLATIO :
ASSEMBLY & I STALLATIO :
shipping or installation. On products with platforms install 1 -2
Mark & dig footing holes per diagram.1.
Assemble entire slide lying unit on its side on the ground. Start2.
by attaching Ladder to Platform. See Detail A.
Attach Platform Guard Rail to Platform Legs. See Detail B. 3.
Then attach Guard RAil Assy. To Platform. See Detail C.
Attach Slide Bedway to Platform. See Detail D.4.
Attach Leg Holder to Slide Bedway. See Detail E. Then Attach5.
Slide Leg to Bedway. See Detail F.
Attach Ladder Hand Rail to Guard Rail & Ladder. See Detail G.6.
Attach Entrance Bar to GuardRails. See Detail H.7.
Raise & brace unit in footing holes. Leength of legs below 8.
intended level of Resilient Surfacing should be 24"
Plumb & Level. Tighten all nuts & bolts so that lock washers 9.
are flat. Pour Concrete. Wait 48 hrs before removing brace,
installing Resilient Surfacing & using equipment.
Attach Warning Label and Manufacturers Identification Label to10.
a clean surface. The Labels should be attached in a locations
where they are clearly visible and legible and away from
normal hand and foot placement areas. The Labels must be
replaced if they become if they become illegible, destroyed,
or removed. Contact your distributor for replacement Labels.
SUPER SLIDE 4'
SUPER SLIDE 4'SUPER SLIDE 4'
SUPER SLIDE 4'
54321
421-408
421-408421-408
421-408
Indicates
Dashed Line
Use Zone
Concrete Footing
1' x 2' Deep
(7 Places)