Steel King I-Beam Cantilever User manual

I‐BeamCantileverInstallationand
AssemblyManual
SteelKingIndustries,Inc.
2700ChamberSt

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
2
ASSEMBLYINSTRUCTIONS:
SteelKingIndustriesrecommendsthatthisproductbeassembledonlybyqualifiedpersonnel,
experiencedinassemblyofstorageracks,andknowledgeableofallsafetyregulationsand
practices.Theseinstructionsareintendedonlyforusebyqualifiedindividualsusingallproper
safetyequipment.
Thesestorageracksareextremelyheavy,andifnotproperly
securedduringinstallationandassemblycouldfall,possiblecausing
injuryordeathaswellasdamagetoproperty.
ContactSteelKingIndustriesoryourlocalSteelKingRepresentativeforthenameandcontact
informationofaqualifiedinstaller.Usersofthisinformationagreetoindemnifyandhold
harmlessSteelKingIndustriesfromanyandallliability.
Step#1:ChecktheMaterial
A. Checktomakecertainthatallmaterialshavebeenreceived.Materialsshouldbechecked
againstthepackinglistsandBillofLading.
B. Notifytheshipperimmediatelyofanyshortagesorproductdamage.
Step#2:ChecktheArea:
A. Cleartheareawheretheracksystemistobelocated.
B. Checktheareaforallobstruction,suchaslights,heatingducts,pipes,buildingcolumns,
etc.,toinsureaclearareafortheinstallationofthestoragerack.

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
3
Step#3:LayOutfloor:
Recommendedtools:
TapeMeasure
ChalkLine
A. Establishtheracklayoutbydeterminingtheaisledimensionsandtherackposition.
B. Snapachalklineestablishingthefrontedgeoftheuprightbases.Thechalklineshouldrun
theentirelengthoftherowofrack.
Step#4:AssembleIBeamCantileverRack:
Recommendedtools:
Aircompressor,
Torquewrench,
11/8”driveimpactsorequivalent
A. Distributetheuprights,bases,armsandbracingforassemblyneartheirfinalinstalled
position.Usedunnagetoprotectthefloorduringthisoperation.

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
4
B. Markthearmelevationsontheuprights.Themarksshouldbebelowthetopofthearm
endplatesoasnottoshowafterthearmisboltedinplace.
MarkArmLocations
onupright

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
5
Step#4:AssembleIBeamCantileverRackContinued:
C. Boltthearmsandthebasestotheuprightsusingthe¾”diameterx2”longbolts.Torque
theboltto200ft‐lbs.
Step#5:ErectUprightColumns:
Recommendedtools:
Forktruckorothermechanicalliftingdevice,
Aircompressor,
Torquewrench,
11/8”driveimpactsorequivalent

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
6
A. Usingaforktruck,carefullystandthepre‐assembleduprightswitharmsattached.Please
becarefulheretoprotectthefloor.
B. Foreachrow,assembleastarterbay.Astarterbayincludestwopreassembleduprights
withattachedarmsandallsupportbracing,bothdiagonalandhorizontal.SeeStarterBay
ConfigurationFigureBelow.

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
7
Step#5:ErectUprightColumnsContinued
C. Tightenallbracing.
D. Aspacershouldbeusedtoassureproperspacingbetweenthebases.
E. Nowthebalanceoftheuprightscanbeerectedtocompletetherun.Theuprightscanbe
stoodeitheroneatatimeoringroupsof2.
If2uprightsaretobeerected,thisshouldbethebaywiththeX‐bracingtightenedinplace.
Step#6:Square,Plumb,Shims,andAnchorBolts:
A. Squarethebasesoftheuprightsonthechalklines.
B. Plumbtheuprightsvertically.Useshimstoadjust.
C. Shimtheuprightandbaseassembliessuchthatthecolumnsmaintainanout‐of‐plumb
toleranceof½”orlessin10feet.Basesmustbefullysecuredtothecolumnsbefore
shimming.Shimsaretobepositionedatananchorbolt.
Note:Propershimmingisimportantbecauseitaffectsthealignmentofthearms.

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
8
D. Fornon‐seismicapplications,anchortheuprightandbaseassembliestotheslab‐on‐grade
perthefollowingconfigurationsusing¾”diameterx5½”longanchorbolts.The
recommendedinstallationtorqueforthesesanchorboltsis150foot‐pounds.Anchorholes
aretobevacuumedoutbeforeinsertingtheanchorbolts.
ProperAnchorConfigurationsForSingleandDoubleSidedI‐BeamCantileverRacks
SingleSided,I‐BeamCantileverAnchorConfiguration–TopView
DoubleSidedI‐BeamCantileverAnchorConfiguration–TopView
Step#7:Cleanup:
A. Vacuumalldustanddebrisassociatedwithsettinganchors.
B. Disposeofalldunnage,strappinganddebris.Sweepthefloorwithabroomifnecessary.
Ifyouhaveanyfurtherquestions,contactyourlocalSteelKingRepresentativefor
customerassistanceorcontactSteelKingIndustriesdirectlyat(800)826‐0203.

SteelKingIndustries,IncI‐BeamCantileverInstallationGuide
9
WARNING:INSTRUCTIONSFORASSEMBLYARESETFORTHONTHESEPAGES.PROPERASSEMBLYIS
THERESPONSIBILITYOFTHEPURCHASERANDISNOTCOVEREDBYANYWARRANTYOFTHE
SELLER.BUYERISCAUTIONEDNOTTOSUBSTITUTEPARTSORHARDWARE.SELLERDISCLAIMSALL
LIABILITYWITHRESPECTTOANYSUBSTITUTIONOFPARTSORHARDWARENOTAPPROVEDIN
WRITINGBYSELLER.
THEINSTALLATIONDETAILDRAWINGSTHATFOLLOWAREINTENDEDASBASICGUIDESFOR
INSTALLATIONOFTHESTANDARDCOMPONENTS.DEPENDINGUPONTHESPECIFICSOFTHE
SYSTEM,THEREMAYBELIMITIATIONSREGARDINGTHEUSEOFTHESESTANDARDCOMPONENTS
AND/ORAREQUIREMENTFORSPECIALINSTALLATIONTECHNIQUES.ADDITIONALINFORMATION
ISFOUNDINSTEELKINGPRICEBOOKS,PUBLISHEDTECHNICALDOCUMENTS,COMPREHENSIVE
INSTALLATIONDRAWINGS,ANDOTHERMATERIALS.
Other Steel King Rack & Stand manuals