Section I. Installation Instructions Control of combustion draft.
Before uncrating the unit prepare
the location. It should be placed upon
a good level concrete floor or pad.
Care should be taken to locate the
unit for easy accessibility. Please
maintain the following clearances to
combustible materials:
OTF
(Outdoor Pool Heaters)
Front 24 inches
Back 24 inches
Sides 12 inches
ITF
(Indoor Pool Heaters)
Front 24 inches
Back 12 inches
Sides 12 inches
In addition, the air openings in the
cabinet shall have adequate clearance
to allow for sufficient air intake to the
burner. Uncrate the unit as close to
its permanent location as possible to
prevent handling damage.
(2) Connections:
Do not run any piping along the
front access panel of heater as they
may interfere with servicing. The tap-
pings for connecting the unit to the
pool circulation lines are at the back of
the heater. These connections are 1-
1/2" NPT. Connections should be
made as per the piping illustration on
page 4. Install unions at the heat
exchanger so it can be readily
removed for service. If plastic pipe is
used, make connection to the unit with
metal piping and run metal piping to
the floor line before joining to plastic
pipe. This will act as a “heat-trap” and
reduce possible damage to the plastic
pipes from overheating. Install posi-
tive check valve on inlet side. Install a
Tee joint at the coil where the PIPING
FROM the pool filter/pump ENTERS
the coil. Install the copper well provid-
ed into the piping Tee and insert the
remote sensing bulb from the L-4031
pool thermostat.
An adjustable by-pass around the
heat-exchanger is required. The by-
pass is an important and necessary
component to obtaining optimum
performance (see piping diagram on
page 4). In order to properly adjust
the flowrate through the system,
please adhere to the following steps:
By-Pass Set-Up
a) Use piping and full-size valve
to connect the “In” and “Out” streams
of the pool coil.
b) With the bypass valve wide
open take a pressure reading at the
gauge on the pool filter.
c) Pressure reading with bypass
valve full open is the baseline pressure.
d) Slowly close the bypass valve
so that the pressure increases.
e) Stop when pressure reaches 2
to 4 psi above the baseline at the filter.
Alternatively, flowrate may be set
by comparing the temperature differ-
ence between the “In” and “Out”
streams of the pool coil.
a) Use full size piping and valve
to connect the “In” and “Out” streams
of the pool coil.
b) Allow the boiler to fire contin-
uously for a period of ten (10) to fif-
teen (15) minutes.
c) With the bypass valve wide
open take temperature readings for
the coil.
d) Note: surface temperature
readings taken on a cold day will vary
significantly from test data.
e) Slowly close the bypass valve
and continue to take temperature
readings.
f) Stop when the temperature
difference between the “In” and “Out”
streams reaches forty-five (45) to fifty
(50) degrees Fahrenheit.
g) Flowrate should correspond to
six (6) gallons per minute. (See chart
page 7).
(3) Flue Connections:
(A) OTF Series (Outdoor Units)
The OTF heaters are provided with
an outdoor vent cap to be installed
directly on top of the cabinet at the flue
outlet. This vent cap provides for a
waterproof unit as well as proper con-
ITF Series (Indoor Units)
(a) General:
Oil fired units must be connected
to a flue having sufficient draft at all
times to assure proper operation.
(b) Draft:
A draft regulator should be
installed in accordance with the man-
ufacturer’s instructions. Set the draft
to a negative –.01 to –.02 max. WC
over the fire.
(c) Roof Clearances:
The flue gas exit of the venting
system should be at least three (3)
feet above the outside point where it
passes through the roof and at least
two (2) feet higher than any portion of
a building within ten (10) feet of the
venting system.
(d) Chimney Connections:
The horizontal length of a chim-
ney connector should not exceed ten
(10) feet unless a draft booster is
used. The connector should be
pitched upward at least one-quarter
(1/4) inch to the foot. Use only high
quality lock seam smoke pipe. Each
joint should be securely fastened with
sheet metal screws. Chimney con-
nections should be positioned to
effect the shortest possible run of
smoke pipe to the chimney.
(e) Vent Cap:
Install a UL listed vent cap where
the possibility of down draft exists.
Section II
Filling
Instructions
The Thermotron Pool Heater is
an indirect heater using primary water
in the boiler shell to act as a heat
transfer medium to the pool
flowing through the separate all
copper/bronze heat exchanger coil.
Therefore the pool heater, or boiler
section, MUST be filled with fresh city
water. DO NOT FILL WITH CHLO-
RINATED OR WATER FROM THE
SWIMMING POOL.