manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. VADO
  6. •
  7. Kitchen & Bath Fixture
  8. •
  9. VADO Axces VICTORIANA AX-VIC-100/CD-CP Instruction Manual

VADO Axces VICTORIANA AX-VIC-100/CD-CP Instruction Manual

KEEP FOR FUTURE REFERENCE
MONO BASIN MIXER WITH
POP-UP WASTE
INSTALLATION /
USER MANUAL
This instruction booklet covers model:
AX-VIC-100/CD-CP
Version 1, 1-9-19
VADO
Wedmore Road, Cheddar,
Somerset, England BS27 3EB
tel 01934 744466
fax 01934 744345
www.vado.com
sales@vado.com
VICTORIANA
23
Please read these instructions carefully before starting installation and keep for
future reference.
Remove all packaging and check the product for missing parts or damage before
starting installation.
Any alterations made to this product and fittings may infringe water regulations and
will invalidate the guarantee.
The installation must comply with all Local/National Water Supply Authority
Regulations/Byelaws and Building and Plumbing Regulations.
To be installed in accordance with BS EN806.
We strongly recommend that you use a qualified and registered plumber.
General installation
Operating Specifications
Important - please read
Operating Pressure
Minimum operating pressure 0.2 bar
Maximum operating pressure 5 bar
This fitting is a mixing device and therefore water supplies should be
reasonably balanced.
When installed, the fitting must comply with the requirements of the Water Supply
(Water Fittings) Regulations 1999 and Scottish Byelaws 2004.
For further information, contact the Water Regulations department of your local water
supplier (see the WRAS website www.wras.co.uk for details) or the Water Regulations
Advisory Scheme by email (info@wras.co.uk) or telephone: 01495848454.
Before making any inlet pipe connections, all supply pipes MUST be thoroughly flushed
to remove debris. Failure to do so could result in damage or low flow from the mixer
unit. Water Supply (Water Fittings) Regulations 1999 Schedule 2 Section 13.
The fitting of isolating valves to the inlet feeds is advised for ease of maintenance.
Please take great care when installing this mixer not to damage its surface.
Please note if installing in an enclosed environment, access should be left for servicing
and maintenance. No costs relating to inadequate access can be accepted.
Cleaning instructions
The electroplating on this product is finished to the highest standard. Due care needs
to be taken to ensure the appearance is retained.
We recommend cleaning all products with a soft damp cloth ONLY and advise strongly
against the use of all aggressive/corrosive cleaning products i.e. powders and liquids.
If these instructions are not followed, this may invalidate your guarantee in the event
of a problem occurring.
Dimensions
105mm
160mm
145mm
56mm
4 5
Installation
Before installing your new mixer,
flush through the pipe work to
ensure removal of debris, turn off
the water supply.
Ensure the seal is in place in the
bottom of the mixer body.
Position the mixer on the basin.
From the underside of the basin
screw the two flexible pipes to the
hot and cold connections in the
mixer body, the hot should be to
the left and the cold to the right,
hand tighten only.
Screw the threaded rod into the
small hole inside the mixer body.
Slide the rubber and metal
washer over the rod, the rubber
washer should be on top. Screw
on the nut and tighten to clamp
the mixer to the basin.
CAUTION: Do not over tighten
the nut as this may damage the
basin.
Connect the water supply to the
inlet pipes. The hot water should
be connected to the left pipe and
cold to the right.
Installation
Dissemble the pop-up waste
and reassemble onto the basin.
Insert the vertical control rod
(with knob) down through the
hole in the back of the mixer
body. Screw the extension into
the control rod (see detail).
Unscrew the ball joint retainer
on the side opening of the waste
body. Insert the short end of the
horizontal control rod (with ball
joint) into the waste and clamp
in position by refitting the ball
joint retainer and washer, make
sure the washer is the correct
way round (fits over the ball).
Do not over tighten.
Slide the control rod link onto
the horizontal control rod and
vertical control rod and loosely
tighten.
Test the action of the pop-up
waste and fully tighten the
rod link. Adjust the ball joint
retainer as required.
Turn on the water supply and
turn the mixer on fully to flush
through any possible debris
from the mixer. Finally check all
new connections for leaks.
Base seal
Rubber
washer
Metal
washer
Threaded
rod
Nut
Hot flexible
pipe
Cold flexible
pipe
Vertical
control rod
extension
Vertical
control rod
Horizontal
control rod
Ball joint
retainer
Control
rod link
Seal
Seal
Plug
Plug
housing
Waste body
Washer
6
Operation mixer
Turning the hot
handle clockwise will
increase the flow of
hot water.
Turning the cold handle
anti-clockwise will
increase the flow of
cold water.
Operation pop-up waste
Pull the waste control rod up to close
the plug and fill the basin.
Push the waste control rod down to open
the plug and empty the basin.
Cold
Hot
7
All AXCES by VADO products come with a 2 year guarantee as standard. Within this
guarantee period VADO will provide replacement parts and any labour [SEE NOTE 1,
GUARANTEE CONDITIONS] needed to complete the product repair.
This standard guarantee may be extended by registering your product to give a 10 year
guarantee (2 years parts and labour plus 8 years on parts supply only.).
Operational components such as, but not limited to; thermostatic cartridges, diverters,
headworks and flow control, waste mechanisms, shower hoses, O-rings and seals are
guaranteed for 2 years parts and labour plus 3 years on parts supply only.
Guarantee Conditions
Our products are guaranteed against manufacturing defects from the date of purchase until
the expiry of the relevant guarantee period shown above.
The guarantee is only valid if:
•The product has been installed, used and maintained in accordance with VADO's
instructions and subjected to normal use only.
•The defect is not due to use of an unsuitable or inadequate water or power supply.
•The defect is not due to accident, misuse, neglect or incorrect/inappropriate repair (other
than by VADO or VADO authorised agents) or damage caused by foreign objects
or substances.
•The extended guarantee is only available if you have completed the Guarantee Registration
Process. This can be done via the VADO website or via phone to our aftersales team.
Registration must be completed within 6 months from date of purchase.
Under the extended guarantee period VADO will, at its option, offer to supply any
replacement product (or component part) assessed to be defective [SEE NOTE 2].
The guarantee (whether standard or extended) is non-transferable to any subsequent owner.
All claims under the guarantee should be notified in the first instance to our Aftersales
department, contact details below, this must be done no later than the last day of the
relevant guarantee period. All claims must be accompanied by proof of purchase (sales
receipt or delivery note) from an official AXCES by VADO dealer.
The guarantee does not extend to any consequential loss or damage.
After repair or replacement, the relevant guarantee period will be calculated from the
original date of purchase.
VADO operates a policy of continuous product development and therefore reserves the right
to change the product, packaging and documentation specifications without notice.
NOTES:
[1] Labour via our engineer network is only available in the UK. Attendance by a VADO
engineer or sub-contract engineer will be under our standard terms and conditions.
[2] VADO reserves the right to charge in advance for a product (or replacement part) pending
collection and investigation (at VADO expense) to confirm a defect is due to a manufacturing
issue. If a defect is found the charge will be refunded or cancelled.
This guarantee is in addition to and does not affect your statutory rights as a consumer.
Tel: 01934 745163
Email: aftersales@vado.com
Guarantee

Other VADO Kitchen & Bath Fixture manuals

VADO Omika OMI-300-CP User manual

VADO

VADO Omika OMI-300-CP User manual

VADO SYNERGIE SYN-100 User manual

VADO

VADO SYNERGIE SYN-100 User manual

VADO ZOO-100FW/SB-CP User manual

VADO

VADO ZOO-100FW/SB-CP User manual

VADO Geo Installation and operating instructions

VADO

VADO Geo Installation and operating instructions

VADO Victoriana Installation and operating instructions

VADO

VADO Victoriana Installation and operating instructions

VADO AXCES AX-VIC-110/CD-CP Instruction Manual

VADO

VADO AXCES AX-VIC-110/CD-CP Instruction Manual

VADO OMIKA 135 User manual

VADO

VADO OMIKA 135 User manual

VADO WG-179M-CP User manual

VADO

VADO WG-179M-CP User manual

VADO Axces Nuri AX-NUR-100-CP Instruction Manual

VADO

VADO Axces Nuri AX-NUR-100-CP Instruction Manual

VADO velo Installation and operating instructions

VADO

VADO velo Installation and operating instructions

VADO geo Installation and operating instructions

VADO

VADO geo Installation and operating instructions

VADO VADO-PRO-100P User manual

VADO

VADO VADO-PRO-100P User manual

VADO Edit EDI-100M/SB-CP User manual

VADO

VADO Edit EDI-100M/SB-CP User manual

VADO AXCES NURI AX-NUR-110-CP User manual

VADO

VADO AXCES NURI AX-NUR-110-CP User manual

Popular Kitchen & Bath Fixture manuals by other brands

Kohler K-3199 Installation and care guide

Kohler

Kohler K-3199 Installation and care guide

RUBINETTERIE BELLOSTA Plisset Diamond 4200/1/P/E Installation instruction

RUBINETTERIE

RUBINETTERIE BELLOSTA Plisset Diamond 4200/1/P/E Installation instruction

Lefroy Brooks M1-5400 Installation, operating,  & maintenance instructions

Lefroy Brooks

Lefroy Brooks M1-5400 Installation, operating, & maintenance instructions

Hans Grohe MellowTide 600/440 Assembly instructions

Hans Grohe

Hans Grohe MellowTide 600/440 Assembly instructions

BELLOSTA Stresa 1421/K Installation instruction

BELLOSTA

BELLOSTA Stresa 1421/K Installation instruction

Mora Cera K2 Installation instruction

Mora

Mora Cera K2 Installation instruction

Lefroy Brooks M1-5111 Installation, operating,  & maintenance instructions

Lefroy Brooks

Lefroy Brooks M1-5111 Installation, operating, & maintenance instructions

Graff LM40-VS installation instructions

Graff

Graff LM40-VS installation instructions

Spectrum Brands Pfister Penn 8P8-PES Quick installation guide

Spectrum Brands

Spectrum Brands Pfister Penn 8P8-PES Quick installation guide

IB RUBINETTERIE 400 Fitting instructions

IB RUBINETTERIE

IB RUBINETTERIE 400 Fitting instructions

Hans Grohe AXOR Strack 10823000 Instructions for use/assembly instructions

Hans Grohe

Hans Grohe AXOR Strack 10823000 Instructions for use/assembly instructions

Hans Grohe Focus M42 150 1jet 71814 Series Instructions for use and assembly instructions

Hans Grohe

Hans Grohe Focus M42 150 1jet 71814 Series Instructions for use and assembly instructions

Franke F5LM1004 Installation and operating instructions

Franke

Franke F5LM1004 Installation and operating instructions

Ideal-Standard B9446 quick start guide

Ideal-Standard

Ideal-Standard B9446 quick start guide

Spectrum Brands Pfister Kelen RT6-4MF Quick installation guide

Spectrum Brands

Spectrum Brands Pfister Kelen RT6-4MF Quick installation guide

Dornbracht 13 512 670-FF installation instructions

Dornbracht

Dornbracht 13 512 670-FF installation instructions

Hans Grohe Talis E2 31642000 Instructions for use/assembly instructions

Hans Grohe

Hans Grohe Talis E2 31642000 Instructions for use/assembly instructions

baliv KI-1040 manual

baliv

baliv KI-1040 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.