AAE BBS-25 User manual

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
1 of 25
BBS-25
25' High Baseball BackStopper System
Specification

DATE:
CATEGORY:
CAD FILE:
DWN. BY:
MODEL:
NOTE:
DESCRIPTION:
NR
C
Copyright 2011 Aluminum Athletic Equipment Co.
D
C
B
A
6
5
4
3
2
1
D
C
B
A
8
7
6
5
4
3
2
1
®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Total Length of Backstop Run
(Specified by Customer)
20'
240"
Max. Distance
Between Uprights
Total Number of Uprights
(corner posts are shared)
Refer to
Associaton Guidelines
for Placement Distance
Refer to
Associaton Guidelines
for Placement Distance
Total Length of 3rd Base Run
(Specified by Customer)
20'
240"
Max. Distance
Between Uprights
Total Number of Uprights
Total Length of 1st Base Run
(Specified by Customer)
20'
240"
Max. Distance
Between Uprights
Total Number of Uprights
Notes:
Total number of Uprights per run,
1.
is determined by dividing the
runs length evenly. with the
resulting sections not exceeding
20' on center.
Diagram shown is for
2.
reference only,
actual system
layout (number and placments of
uprights) may differ from what is
shown
BBS-25 Specifications
4/20/2021
BBS-25
25' HIGH BASEBALL BACKSTOPPER SYSTEM
CUSTOMER
Concrete Footing Placement Specification
DWG. NO.
BBS-25-C-002
2 of 25
BBS-25
Specifications

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
25'-6"
A
B
C
D
Left End Post
(hardware configuration
dependent on post location)
DETAIL A
Lower Horizontal
Cable Collar
Black Vinly Coated
(Galvanized Steel)
Lower Vertical
Cable Collar
Black Vinly Coated
(Galvanized Steel)
Netting
(Height varies with
wall height, if
applicable)
Cable Clamp &
Turnbuckle Hardware
(Galvanized Steel)
Aluminum
Post
Debris Gasket
(Rubber)
DETAIL B
Cleat
(Galvanized Steel)
Cleat Mounting Hardware
(Stainless Steel)
1/4" MFP
Double Braided Rope
Border
DETAIL C
Vertical Cable
Guide "Open Eyebolt" Collar
Black Vinly Coated
(Galvanized Steel)
(End Posts Only)
Eyebolt & Retention Hardware
(Stainless Steel)
Upper Horizontal
Cable Collar
Black Vinly Coated
(Galvanized Steel)
DETAIL D
Post Cap
(Welded Aluminum)
Upper Vertical
Cable Collar
Black Vinly Coated
(Galvanized Steel)
Net with Integrated
Clear Vinly Coated
(Galvanized Steel)
Cable
Heavy Duty
Braided Nylon
Rope (Black)
Cable Clamp
(Galvanized Steel)
Pear Clip
(Stainless Steel)
O-Ring
(Brass)
Eyebolt
(Stainless Steel)
Hanging Pulley
(Galvanized Steel)
Vertical Cable (Vinyl
Coated Galvanized Steel)
BBS-25 Specifications
- Net: #AAE N361-#36, 1-3/4" sq. knotted Nylon, DBB,
length to vary, 1/4" MFP Rope Border, UV
protected and 1/4" cable hog tied to top of net
Netting:
-
6" x .188" wall aluminum tube (Mill
Aluminum 6061-T6)
- 29'-0" Overall Length (25'-6" out of ground
sleeve)
- Weight = 116lbs./ea.
- All Hardware is RUSTPROOF
Post (Aluminum):
Note: Collars are Black in color, shown in
different colors to aid in identification.
Cable Endloop &
Turnbuckle Hardware
(Galvanized Steel)
A
B
C
D
DRAWN BY:
CAD FILE:
MODEL:
DATE:
NOTE:
BBS-25 Specifications
4/20/2021
BBS-25
NR
Upright Assembly Specification
DESCRIPTION
1
2
3
4
5
6
A
B
C
D
1
2
3
4
5
6
7
8
CATEGORY:
CUSTOMER
Upright Specification
DWG. NO.
BBS-25-C-003
Copyright 2011 Aluminum Athletic Equipment Co.
C
BBS-25
Upright Specifications

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
5'-3"
63"
Hole
Depth
4'-9"
57"
Sleeve
Length
3'-6"
42"
to
Stop Bolt
4 3/4"
6"
2'-6"
30"
Hole
Diameter
4"
Crushed Stone
Concrete
Concrete
GrassGrass
Top of post sleeve
should be even with
soil/aggregate.
Standard Sleeve & Footing
Natural Grass/Turf Field
Specification
Drainage
Taper
2'-6"
30"
Hole
Diameter
Sleeve Extended
by Wall Height
(as specified by Customer)
5'-3"
63"
Hole
Depth
4'-9"
57"
Sleeve
Length
3'-6"
42"
to
Stop Bolt
Crushed Stone
Concrete
Concrete
No
Drainage
Taper
Custom Sleeve & Footing
Post In Wall
Specification
Notes:
If system is an
in wall installation
, than 1.
height of wall is deducted from net height,
to ensure proper tension is attained on
net when raised. (i.e. 20' High system
with 3' High backstop wall would have a
net height of 17')
A
B
C
D
DRAWN BY:
CAD FILE:
MODEL:
DATE:
NOTE:
BBS-25 Specifications
4/20/2021
BBS-25
NR
Grass & Turf Concrete Footing Specification
DESCRIPTION
1
2
3
4
5
6
A
B
C
D
1
2
3
4
5
6
7
8
CATEGORY:
CUSTOMER
Concrete Footing Specification
DWG. NO.
BBS-25-C-004
Copyright 2011 Aluminum Athletic Equipment Co.
C
BBS-25
Concrete Footing
Specification
Note: **Consult Local Codes
4 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Left End Post
Lower Horizontal Cable
"Tensioner"
Collar Assembly
A
Note: Hardware denoted with "A" is
included in the tensioner kit and is
installed onto a "Standard Collar"
Standard
Collar
A
Apply Supplied
Anti-Seize to
bolt threads
Right End Post
Lower Horizontal
"Crimped Cable End"
Collar Assembly
Standard
Collar
When installing
cable, clamp loop
goes on cut side.
A
A
A
Anti-Seize
(supplied by AAE
Apply supplied
Anti-Seize to
bolt threads
Vertical Cable, Upper
"Crimped End"
Collar Assembly
Standard
Collar
A
Vertical Cable, Lower
"Tensioner"
Collar Assembly
Cable loop end show for
reference only
(not pre-installed)
Cable loop end
shown for reference
only
(not pre-installed)
A
Standard
Collar Assembly
Standard
Collar
When installing
cable, clamp loop
goes on cut side.
A
A
A
A
Horizontal Cable
"Pear Clip" Collar Assembly
31
30
32
34 33
Apply
Supplied
Anti-Seize
to bolt
threads
30
36
35
34 33
Vertical Cable
"Open Eyebolt" Collar Assembly
Apply
Supplied
Anti-Seize
to bolt
threads
Horizontal Cable
"Shackle" Collar Assembly
31
33
34
30
37
Apply Supplied
Anti-Seize to
bolt threads
31
30
33
34
Apply
Supplied
Anti-Seize
to bolt
threads
Note: Collars are Black in color,
shown in different colors to aid in
identification.
ITEM NO.
Item
DESCRIPTION
30
Securing Collar
8", I.D., Securing Collar
31
Bolt
5/16"-18 x 1-1/4", Carriage bolt, SS
32
Snap
1/4", Pear Clip Snap, Plated
33
Ny-Lock Hex Nut, Thin
5/16"-18, Self Locking Nut, SS, Thin
34
Washer
5/16" Flat Washer, SS
35
Wiz-Lock Hex Nut
5/16"-18, Wiz-Lock Nut, SS
36
Open Eyebolt
5/16"-18, Open Eyebolt, SS
37
Shackle
1/4'' Anchor Shackle
A
B
C
D
DRAWN BY:
CAD FILE:
MODEL:
DATE:
NOTE:
BBS-25 Specifications
4/20/2021
BBS-25
NR
QTY of collar assemblies will vary depending on system
DESCRIPTION
1
2
3
4
5
6
A
B
C
D
1
2
3
4
5
6
7
8
CATEGORY:
CUSTOMER
BBS-25 Collar assemblies
DWG. NO.
BBS-25-C-005
Copyright 2011 Aluminum Athletic Equipment Co.
C
BBS-25
Cable Collar
Assembly Diagrams
5 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
BBS-XX/WA
Wall Attachment
BBS-XX/SA
Standard Attachment
BBS-XX/FA
Fence Attachment
Fence
Rail
Net (Offset)
Rope Border
Cable Tie
(6" Spacing)
Large Eyebolt
used to
anchor
tensioned
cable.
Placement: at
each end and
in corners if
run is not
straight
(i.e. backstop)
Cable Tie
(6" Spacing)
Net (Offset)
Rope Border
Tensioner
Assembly
Attachment
Cable
Small Eyebolt
used to hold
down cable.
(4' Spacing)
Attachment
Cable
Cable Tie
(6" Spacing)
Net (Offset)
Rope Border
Note:
Pre-Fab Approval form
will need to be filled out prior
to making the system, where
wall/fence heights, length of
net and attachment style will
need to be specified.
Note:
XX equals specified system height
(i.e. 20' height, wall attachment system = BBS-20/WA)
BBS-25
Configurations
6 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Model No. BBS-25/FA
Parts List
7 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Model No. BBS-25/WA
Parts List
8 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Model No. BBS-25/SA
Parts List
9 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
10'-0"
120"
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Net Pulley
System
Right
View
Post Cap
pre-installed
Cleat
Detail
6
107
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to
bolt threads
Lower Horizontal
Cable Collar
w/ Tensioner
Assembly
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Note: Collars are Black in color, shown
in different colors to aid in identification.
Open
Eyebolt Collar
Detail
40.00° 90.00°
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting)
Cleat
(for positional ref)
Warning
Label
AAE I.D.
Label
Installation Notes:
Lower Collars:
From bottom of pole slide the
1.
lower vertical cable collar, lower horizontal
collar and and debris ring (
optional
) into
position. To allow proper insertion into ground
sleeve, lower most collar should be 42" from
end of post.
Before securing collars into place
make sure to rotate the lower vertical collar
approx 40°.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will be
inserted through post and cleat and secured
on opposite of net side using Nylock hex-nuts
and cap nuts. (
refer to diagram
)
Mid Collar Open Eyebolt:
Note orientation
3.
of collar on post. From top of pole slide the
open eyebolt collar into position (
refer to
diagram
) and secure into place.
Mid Collar Tensioner:
Note orientation of
4.
collar on post. From top of pole slide the
open eyebolt collar into position and , rotate
approx 45° counterclockwise (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes preassembled
5.
to eyebolt. Install washer onto eyebolt then
insert eyebolt with washer through front side
of hole at top of post. From opposite side
secure eyebolt into place using a flatwasher
and self-locking hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position (collar
should rest on eyebolt washers). Before
securing into place make sure to rotate the
collar clockwise, approx 40°. (
refer to
diagram
)
Make sure warning labels are present on goal
7.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Anti-Seize
(supplied by AAE
BBS-25/SA
Assembly Instruction
Left End Post
10 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
+
Height
of
Fence
or
Wall
10'-0"
120"
from
Ground
Level
Net Pulley
System
Right
View
Post Cap
pre-installed
Cleat
Detail
6
107
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to
bolt threads
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Note: Collars are Black in color, shown
in different colors to aid in identification.
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Open
Eyebolt Collar
Detail
40.00° 90.00°
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting)
Cleat
(for positional ref)
Warning
Label
AAE I.D.
Label
Installation Notes:
Lower Collar(s):
From bottom of pole slide
1.
the lower vertical cable collar, lower
horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most
collar should be 42" + Height of Wall/Fence
from end of post.
Before securing collars into
place make sure to rotate the lower vertical
collar approx 40°.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will be
inserted through post and cleat and secured
on net side using Nylock hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar Open Eyebolt:
Note orientation
3.
of collar on post. From top of pole slide the
open eyebolt collar into position (
refer to
diagram
) and secure into place.
Mid Collar Tensioner:
Note orientation of
4.
collar on post. From top of pole slide the
open eyebolt collar into position and , rotate
approx 45° counterclockwise (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes preassembled
5.
to eyebolt. Install washer onto eyebolt then
insert eyebolt with washer through front side
of hole at top of post. From opposite side
secure eyebolt into place using a flatwasher
and self-locking hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position (collar
should rest on eyebolt washers). Before
securing into place make sure to rotate the
collar clockwise, approx 40°. (
refer to
diagram
)
Make sure warning labels are present on goal
7.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Anti-Seize
(supplied by AAE
BBS-25/FA & /WA
Assembly Instruction
Left End Post
11 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
10'-0"
120"
Net Pulley
System
Right
View
Post Cap
pre-installed
Lower Horizontal
Cable Collar
w/ Pear Clip
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Cleat
Detail
6
10
7
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting,
this aids in tensioning the net)
Pear Clip
Collar
Detail
AAE I.D.
Label
Warning
Label
Cleat
(for positional ref)
Installation Notes:
Lower Collars:
From bottom of pole slide the
1.
lower horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most collar
should be 42" from end of post.
Before securing
collars into place verify correct orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on backside
2.
of post, opposite net. Screws will be inserted
through post and cleat and secured on opposite
of net side using self locking hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar with Pear Clip:
Note orientation of
3.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Eyebolt:
Pulley system comes preassembled to
4.
eyebolt. Install washer onto eyebolt then insert
eyebolt with washer through front side of hole at
top of post. From opposite side secure eyebolt
into place using a flatwasher and self-locking
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the upper
5.
vertical cable collar into position (collar should
rest on eyebolt washers).
Before securing
collars into place verify correct orientation
.
(
refer to diagram
)
Make sure warning labels are present on goal
6.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
BBS-25/SA
Assembly Instruction
Inner Post
12 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
+
Height
of
Fence
or
Wall
10'-0"
120"
from
Ground
Level
Net Pulley
System
Right
View
Post Cap
pre-installed
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Cleat
Detail
6
10
7
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Collar Orientation
Detail
(Note:
ONLY
vertical cable collars
should be turned away from netting,
this aids in tensioning the net)
Pear Clip
Collar
Detail
AAE I.D.
Label
Warning
Label
Cleat
(for positional ref)
Installation Notes:
Lower Collar(s):
From bottom of pole slide the
1.
lower horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most collar
should be 42" + Height of Wall/Fence from end
of post.
Before securing collars into place verify
correct orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on backside
2.
of post, opposite net. Screws will be inserted
through post and cleat and secured on opposite
of net side using self locking hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar with Pear Clip:
Note orientation of
3.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Eyebolt:
Pulley system comes preassembled to
4.
eyebolt. Install washer onto eyebolt then insert
eyebolt with washer through front side of hole at
top of post. From opposite side secure eyebolt
into place using a flatwasher and self-locking
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the upper
5.
vertical cable collar into position (collar should
rest on eyebolt washers).
Before securing
collars into place verify correct orientation
.
(
refer to diagram
)
Make sure warning labels are present on goal
6.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
BBS-25/FA & /WA
Assembly Instruction
Inner Post
13 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Lower Horizontal
Cable Collar
w/ Anchor Shackle for
Crimped End Loop
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
3'-6"
42"
(REF)
10'-0"
120"
Left
View
Post Cap
pre-installed
Cleat
Detail
10 7
6
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
Cleat
(for positional ref)
AAE I.D.
Label
Warning
Label
40.00°
Installation Notes:
Lower Collars:
From bottom of pole slide
1.
the lower horizontal collar and and debris
ring (
optional
) into position. To allow
proper insertion into ground sleeve, lower
most collar should be 42" from end of post.
Before securing collars into place verify
correct orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will
be inserted through post and cleat and
secured on opposite of net side using self
locking hex-nuts and cap nuts. (
refer to
diagram
)
Mid Collar Open Eyebolt:
Note
3.
orientation of collar on post. From top of
pole slide the open eyebolt collar into
position (
refer to diagram
) and secure
into place.
Mid Collar with Shackle:
Note orientation
4.
of collar on post. From top of pole slide the
open eyebolt collar into position (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes
5.
preassembled to eyebolt. Install washer
onto eyebolt then insert eyebolt with
washer through front side of hole at top of
post. From opposite side secure eyebolt
into place using a flatwasher and self-
locking hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position
(collar should rest on eyebolt washers).
Before securing collars into place verify
correct orientation
. (
refer to diagram
)
Make sure warning labels are present on
7.
goal posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/SA
Assembly Instruction
Left Corner Post
14 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
3'-6"
42"
(REF)
+
Height
of
Fence
or
Wall
10'-0"
120"
from
Ground
Level
Left
View
Post Cap
pre-installed
Cleat
Detail
10 7
6
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
Cleat
(for positional ref)
AAE I.D.
Label
Warning
Label
40.00°
Installation Notes:
Lower Collar(s):
From bottom of pole
1.
slide the lower horizontal collar and and
debris ring (
optional
) into position. To
allow proper insertion into ground sleeve,
lower most collar should be 42" + Height of
Wall/Fence from end of post.
Before
securing collars into place verify correct
orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will
be inserted through post and cleat and
secured on opposite of net side using self
locking hex-nuts and cap nuts. (
refer to
diagram
)
Mid Collar Open Eyebolt:
Note
3.
orientation of collar on post. From top of
pole slide the open eyebolt collar into
position (
refer to diagram
) and secure
into place.
Mid Collar with Shackle:
Note orientation
4.
of collar on post. From top of pole slide the
open eyebolt collar into position (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes
5.
preassembled to eyebolt. Install washer
onto eyebolt then insert eyebolt with
washer through front side of hole at top of
post. From opposite side secure eyebolt
into place using a flatwasher and self-
locking hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position
(collar should rest on eyebolt washers).
Before securing collars into place verify
correct orientation
. (
refer to diagram
)
Make sure warning labels are present on
7.
goal posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/FA & /WA
Assembly Instruction
Left Corner Post
15 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
(REF)
10'-0"
120"
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Net Pulley
System
Right
View
Post Cap
pre-installed
Lower Horizontal
Cable Collar
w/ Shackle
Front
View
Corner Post Vertical
Cable needs to be
run in front of net.
Do Not Secure to
Lower Vertical
Tensioner until net
has been raised
and fully tensioned.
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Cleat
Detail
6
10
7
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
40.00°
Cleat
(for positional ref)
Warning
Label
AAE I.D.
Label
Installation Notes:
Lower Collars:
From bottom of pole slide the
1.
lower horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most collar
should be 42" from end of post.
Before securing
collars into place verify correct orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on backside
2.
of post, opposite net. Screws will be inserted
through post and cleat and secured on opposite
of net side using self locking hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar Open Eyebolt:
Note orientation of
3.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Mid Collar with Shackle:
Note orientation of
4.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Eyebolt:
Pulley system comes preassembled to
5.
eyebolt. Install washer onto eyebolt then insert
eyebolt with washer through front side of hole at
top of post. From opposite side secure eyebolt
into place using a flatwasher and self-locking
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the upper
6.
vertical cable collar into position (collar should
rest on eyebolt washers).
Before securing
collars into place verify correct orientation
.
(
refer to diagram
)
Make sure warning labels are present on goal
7.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/SA
Assembly Instruction
Right Corner Post
16 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
10'-0"
120"
from
Ground
Level
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Net Pulley
System
Right
View
Post Cap
pre-installed
3'-6"
42"
(REF)
+
Height
of
Fence
or
Wall
Front
View
Corner Post Vertical
Cable needs to be
run in front of net.
Do Not Secure to
Lower Vertical
Tensioner until net
has been raised
and fully tensioned.
Cleat
Detail
6
10
7
1
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
40.00°
Cleat
(for positional ref)
Warning
Label
AAE I.D.
Label
Installation Notes:
Lower Collar(s):
From bottom of pole slide the
1.
lower horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most collar
should be 42" + Height of Wall/Fence from end
of post.
Before securing collars into place verify
correct orientation.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on backside
2.
of post, opposite net. Screws will be inserted
through post and cleat and secured on opposite
of net side using self locking hex-nuts and cap
nuts. (
refer to diagram
)
Mid Collar Open Eyebolt:
Note orientation of
3.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Mid Collar with Shackle:
Note orientation of
4.
collar on post. From top of pole slide the open
eyebolt collar into position (
refer to diagram
)
and secure into place.
Eyebolt:
Pulley system comes preassembled to
5.
eyebolt. Install washer onto eyebolt then insert
eyebolt with washer through front side of hole at
top of post. From opposite side secure eyebolt
into place using a flatwasher and self-locking
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the upper
6.
vertical cable collar into position (collar should
rest on eyebolt washers).
Before securing
collars into place verify correct orientation
.
(
refer to diagram
)
Make sure warning labels are present on goal
7.
posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/FA & /WA
Assembly Instruction
Right Corner Post
17 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Lower Horizontal
Cable Collar
w/ Anchor Shackle for
Crimped End Loop
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
3'-6"
42"
(REF)
10'-0"
120"
Left
View
Post Cap
pre-installed
Cleat
Detail
10 7
6
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
AAE I.D.
Label
Warning
Label
Cleat
(for positional ref)
90.00°
40.00°
Installation Notes:
Lower Collars:
From bottom of pole slide
1.
the lower vertical cable collar, lower
horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most
collar should be 42" from end of post.
Before securing collars into place make
sure to rotate the lower vertical collar
approx 40°.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will
be inserted through post and cleat and
secured on opposite of net side using self
locking hex-nuts and cap nuts. (
refer to
diagram
)
Mid Collar Open Eyebolt:
Note
3.
orientation of collar on post. From top of
pole slide the open eyebolt collar into
position (
refer to diagram
) and secure
into place.
Mid Collar with Shackle:
Note orientation
4.
of collar on post. From top of pole slide the
open eyebolt collar into position and ,
rotate approx 45° clockwise (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes
5.
preassembled to eyebolt. Install washer
onto eyebolt then insert eyebolt with
washer through front side of hole at top of
post. From opposite side secure eyebolt
into place using a flatwasher and Nylock
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position
(collar should rest on eyebolt washers).
Before securing into place make sure to
rotate the collar approx 40°. (
refer to
diagram
)
Make sure warning labels are present on
7.
goal posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
1
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/SA
Assembly Instruction
Right End Post
18 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
3'-6"
42"
+
Height
of
Fence
or
Wall
Front
View
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Lower Vertical
Cable Collar
w/ Tensioner
Assembly
(see collar orientation
detail)
10'-0"
120"
from
Ground
Level
Left
View
Post Cap
pre-installed
Cleat
Detail
10 7
6
9
9
Apply
supplied
Anti-Seize
to bolt
threads
Eyebolt
Detail
3
4
5
Apply supplied
Anti-Seize to bolt
threads
Open
Eyebolt Collar
Detail
AAE I.D.
Label
Warning
Label
Cleat
(for positional ref)
90.00°
40.00°
Installation Notes:
Lower Collar(s):
From bottom of pole
1.
slide the lower vertical cable collar, lower
horizontal collar and and debris ring
(
optional
) into position. To allow proper
insertion into ground sleeve, lower most
collar should be 42" + Height of
Wall/Fence from end of post.
Before
securing collars into place make sure to
rotate the lower vertical collar approx 40°.
(
refer to diagram
)
Cleat:
Is to be installed so that it is on
2.
backside of post, opposite net. Screws will
be inserted through post and cleat and
secured on opposite of net side using self
locking hex-nuts and cap nuts. (
refer to
diagram
)
Mid Collar Open Eyebolt:
Note
3.
orientation of collar on post. From top of
pole slide the open eyebolt collar into
position (
refer to diagram
) and secure
into place.
Mid Collar with Shackle:
Note orientation
4.
of collar on post. From top of pole slide the
open eyebolt collar into position and ,
rotate approx 45° clockwise (
refer to
diagram
) and secure into place.
Eyebolt:
Pulley system comes
5.
preassembled to eyebolt. Install washer
onto eyebolt then insert eyebolt with
washer through front side of hole at top of
post. From opposite side secure eyebolt
into place using a flatwasher and Nylock
hex-nut. (
refer to diagram
)
Upper Collar:
From top of pole slide the
6.
upper vertical cable collar into position
(collar should rest on eyebolt washers).
Before securing into place make sure to
rotate the collar approx 40°. (
refer to
diagram
)
Make sure warning labels are present on
7.
goal posts.
Note:
Post assembly should be
done with post laying down
on flat level surface.
1
Note: Collars are Black in color,
shown in different colors to aid in
identification.
Anti-Seize
(supplied by AAE
Collar Orientation
Detail
(Note:
ONLY
vertical cable
collars should be turned away
from netting, this aids in
tensioning the net)
BBS-25/FA & /WA
Assembly Instruction
Right End Post
19 of 25

®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
Left Corner
Post
Left End
Post
Collar:
Orientation
(all posts) towards
field of play
(refer
to post assembly
pages)
Inner
Post
Inner
Post
Cleet:
Orientation
(all posts)
away from
field of play
Post / Groundsleeve
Installation
Slowly
Lower
post into
sleeve.
Post / Groundsleeve
Installation (fully seated)
Post will
stop once
it rests on
stop bolt
After posts
have been
lowered into
place, secure
the lower
collar(s) into
place.
(if applicable)
Installation Notes:
View above is from net side of post (
field of
1.
play
).
Caution
, slowly lower posts into sleeves.
2.
Dropping post into sleeve may result in damage
to the stop bolt.
Make sure all posts are orientated correctly.
3.
Pulley system towards field of play and cleet
away from field of play. All lower horizontal
cable collars should face field of play.
Once posts are correctly orientated, make sure
4.
the lower collars are properly orientated and
secure them into place.
View from First Base side
Note:
number of inner posts may vary from what is shown.
Note: Collars are Black in color,
shown in different colors to aid in
identification.
BBS-25/SA , /FA & /WA
Assembly Instruction
Posts to Groundsleeve
20 of 25
Table of contents
Other AAE Sport & Outdoor manuals
Popular Sport & Outdoor manuals by other brands

SKLZ
SKLZ QUICKSTER FUTSAL GOAL Getting started

Playcraft
Playcraft Bank Shot 40 Pool Table Assembly instructions

Ice-Trek
Ice-Trek REKLINER instructions

Everbilt
Everbilt ALL AMERICAN SCOREBOARDS MP-2549 Operating instructions and service manual

Salewa
Salewa ORTLES GUIDE 45 manual

Upper Bounce
Upper Bounce UBRTG01-1017 user manual